Pre-Proposal Offeror Questions and Government Responses Bowling Alley Questions

FA4528-17-R-0031

3 August 2017

1. Q: Please clarify whether or not bid bonds are required.

A: Bid bonds not required.

2. Q: Please clarify addendum numbering. FBO shows two addendums, but only one is available for download.

A: Amendment 1 was a mistake posting and can be disregarded. Amendment 2 extended the offer due date from 26 July 17 to 31 July 17 at 2:00 PM CST. Amendment 3 extended offer due date 4 days from 31 July 17 to 4 August 17 at 2:00 PM CST.

3. Q: Please clarify depth of asphalt removal and replacement.

A: For the Bowling Alley parking lot, asphalt is to be removed to a depth of 4 inches below the existing grade. If the asphalt is less than 4 inches thick then base course shall also be removed till a depth of 4 inches is reached.

4. Q: Please clarify whether or not the sidewalk on the North side of the parking area at the Bowling Alley is included in the scope of work.

A: Sidewalks are not part of the scope for this project. The sidewalk in question is to remain as is.

5. Q: Are we to install the section of curb & gutter that is missing on the SW corner of the small parking are on the West side of the Bowling Alley access road?

A: Yes.

6. Q: Are existing bollards to be removed and replaced?

A: Existing bollards shall not be replaced with new bollards. If the contractor needs to remove the existing bollards in order to perform the work required, then that is fine, but they shall be placed back in the same location when the work is completed.

7. Q: Is existing concrete pavement on the East side of the Bowling Alley access road and parking lot to be replaced with Asphalt pavement?

A: Yes, the existing concrete pavement in that section of the parking lot/road is to be replaced with asphalt pavement.

8. Q: Is the existing concrete valley gutter on the East side of the Bowling Alley access road going in to the library included in the scope of work?

A: The existing concrete valley gutter is not part of the project scope. It is to remain as is.

9. Q: Is prime coat required?

A: Prime coat will be the option of the contractor. It is not required.

10. Q: Is pavement marking included in the scope of work?

A: Pavement marking is not included in the scope of work.

11. Q: Spec. section 32 11 13 / 3.5.7 - Proof Rolling seems to have a typo regarding the vehicle size to be used. Please clarify.

A: I believe the wrong specification may have been referenced in the question, but to clarify, since it is not an airfield pavement, any size vehicle may be used as long as it can provide the results stated in the specifications.

12. Q: Will this project require a CPM schedule?

A: No.

**Note – This attachment does not become part of the resultant contract**