Attachment_5_-_Questions_and_Answers.docx

DOCX document 21 KB Posted

Attached to
ITB Fiber Optics Federal contract opportunity
Solicitation number
FA4528-17-R-0028
Issued by
Department of the Air Force Global Strike Command

About this file

Questions and Answers Sheet for ITB 475 Fiber Optics

View the file

Other files for this federal contract opportunity

Other files attached to ITB Fiber Optics, newest first.
File Type Posted
Attachment_1-_Revised_SOW-FOC-475_to_EBN.docx DOCX document
FA4528-17-0028_Amendment_0003.pdf PDF
FA4528-17-R-0028_with_Amendment_0002_changes.pdf PDF
FA4528-17-0028_Amendment_0002.pdf PDF
FA4528-17-R-0028_Amendment_0001.pdf PDF
Attachment_4_-_Financial_Responsibility.docx DOCX document
Attachment_2_-_Wage_Determination_Fiber_Optics.pdf PDF
FA4528-17-R-0028_ITB_475_Fiber_Optics.pdf PDF
Attachment_1_-_SOW-FOC-475.docx DOCX document
Attachment_3_-_Past_Performance_Information_Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Pre-Proposal Offeror Questions and Government Responses Fiber Optic ITB 475

FA4528-17-R-0028

07 August 17

1. Q. Will cables be Pigtail spliced at some point?

A. Cables shall be fusion spliced to a manufacturer pigtail FODP inside the buildings.

2. Q. In B457, how high is the mount and board required to be?

A. Manageable height above existing machinery. (~6ft)

3. Q. Are all the end building end up with 4 strand cable?

A. No, all EBNs shall get 12 strands.

4. Q. Will all 12 strand go back to MH-133?

A. Only for Buildings 440, 442, 443, and 450 to go back to MH-133. 60 strands from MH-133 will go to MH-172 new splice case to feed Buildings 445 and 437.

5. Q. Will a strand of cable be run thru each Maxell? What size strand will be going thru?

A. Yes, each 12 strand shall be run thru each Maxcell. Each duct shall have three (3) 3” x 3 cell IAW SOO 2.2.1.7.1.1, page 10.

6. Q. Should a coil be left in Manhole 1 from 12 strand?

A.. Manhole 1 is not associated within this project. Please re-clarify the question.

7. Q. In B442, Do we install a fiber optics distribution panel wall mount?

A.. Yes, near the existing switch on the interior office wall.

8. Q. In B450, are both risers connected to MH-173?

A. 2.2.1.7.11 New conduit and NEMA pull box to be installed from MH-173 to B450

9. Q. In B445 since Conduit duct is outside, how do we get the strand into the comm room?

A. Through ceiling to center comm. room, former ITN in building 445.

10. Q. In B443, can the distribution panel be in the bay area?

A. No

11. Q. How many tracer wires per run?

A.. SOO para 2.2.1.7.1.11, page 13

**Note – This attachment does not become part of the resultant contract**