S P E C I F I C A T I O N

FOR PROJECT

QJVF 01-0034 REPAIR HVAC SYSTEM DINING HALL

AT

MINOT AIR FORCE BASE, NORTH DAKOTA

PREPARED BY:

5 CES, ENGINEERING FLIGHT

MINOT AIR FORCE BASE, NORTH DAKOTA

MARCH 2009

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

01005 Administrative Provisions 01005 – 1 thru 6 01045 Cutting and Patching 01045 – 1 thru 3 01300 Submittals 01300 – 1 thru 10 01400 Quality Control 01400 – 1, 2 01430 Environment Protection 01430 – 1, 2 01500 Construction Facilities & Temporary Controls 01500 – 1 thru 4 01700 Contract Closeout 01700 – 1 01710 Final Cleaning 01710 – 1, 2

DIVISION 2 – SITEWORK

02072 Minor Demolition 02072 – 1 thru 3 Attachment Pages 1 thru 4

DIVISIONS 3 AND 4 – NOT USED

DIVISION 5 - METALS

05120 Structural Steel 05120 – 1 thru 3 05310 Metal Roof Deck 05310 – 1 thru 3 05500 Metal Fabrications 05500 – 1 thru 3

DIVISION 6 - WOOD AND PLASTIC

06100 Rough Carpentry 06100 – 1 thru 4

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07520 Modified Bitumen Roofing system 07520 - 1 thru 17

DIVISION 8 - NOT USED

DIVISION 9 - FINISHES

09510 Acoustical Ceilings 09510 – 1 thru 4 09900 Painting 09900 – 1 thru 4

DIVISIONS 10 THRU 12 – NOT USED

DIVISION 13 – SPECIAL CONSTRUCTION

13282 Engineering Control of Asbestos Containing Materials 13282 - 1 thru 21

DIVISION 14 – NOT USED

DIVISION 15 - MECHANICAL

15010 General 15010 – 1 thru 6 15250 Thermal Insulation for Mechanical Systems 15250 – 1 thru 14 15700 Heating 15700 – 1 thru 20 15800 Air Supply and Distribution System 15800 – 1 thru 10 15850 Air Conditioning System 15850 – 1 thru 6 15901 Space Temperature Control Systems 15901 – 1 thru 19

(CON’T.)

i

QJVF 01-0034

ii

TABLE OF CONTENTS (Con’t.)

DIVISION 16 - ELECTRICAL

16010 General Provisions 16010 – 1 thru 4 16020 Remodeling Work 16020 – 1, 2 16040 Identification 16040 – 1, 2 16110 Raceway 16110 – 1 thru 7 16120 Low Voltage Conductors 16120 – 1 thru 3 16130 Outlet, Pull and Junction Boxes 16130 – 1 thru 4 16140 Wiring Devices and Device Plates 16140 – 1 thru 4 16160 Motor Starters 16160 – 1 thru 6 16170 Disconnects 16170 – 1, 2 16181 Fuses 16181 – 1, 2 16450 Grounding 16450 – 1, 2 16471 Panelboards 16471 – 1 thru 5 16722 Fire Alarm 16722 – 1 thru 5 16851 Electric Heating Equipment 16851 - 1 16900 Connections to Equipment 16900 – 1, 2

01005-1

DIVISION l - GENERAL REQUIREMENTS

SECTION 01005

ADMINISTRATIVE PROVISIONS

1. GENERAL:

1.1. DESCRIPTION OF WORK:

1.1.1. Work of this Contract, Repair HVAC System Dining Hall, QJVF 01-0034, comprises general, mechanical and electrical construction at Dining Hall, Building 213 located at 317 Tanker Trail, Minot Air Force Base (MAFB), North Dakota.

1.1.2. Work shall include replacing of HVAC system and associated General and electrical work.

1.1.3. User Occupancy: All work shall be coordinated and

scheduled so user occupancy can be maintained at all times, Contractor shall coordinate through the Government’s representation on which portions of the facility will be needed to be shut down for construction purposes. If there are any utilities or functions that will totally shut down the building operations, it shall be done during off times and started back up before the next day’s operations will start.

1.2. EQUIPMENT PARKING: Space for the Contractor's equipment will be allotted on MAFB. The exact location will be chosen during the preconstruction conference and shall be approved by the Contracting Officer or his/her Technical Representative at that time. The Government shall not be liable for the security of any of the Contractor's equipment or material while on MAFB.

1.3. COORDINATION:

1.3.1. Coordinate work of the various Sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later.

1.3.2. Verify characteristics of elements of interrelated

operating equipment are compatible; coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

1.3.3. Coordinate space requirements and installation of

mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

01005-2

1.3.4. In finished areas (except as otherwise shown,) conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements.

1.3.5. Execute cutting and patching to integrate elements of

Work, uncover ill-timed, defective, and non-conforming work, provide openings for penetrations of existing surfaces and provide samples for testing. Seal penetrations through floors, walls, and ceilings.

1.4. CONTRACTOR'S WORK HOURS: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:00 p.m., excluding Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, additional Government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.

1.5. REFERENCE STANDARDS:

1.5.1. For products specified by association or trade standards, comply with requirements of the standard.

1.5.2. The date of the standard is that in effect as of the

Invitation for Bid date.

1.6. SUBMITTALS:

1.6.1. Notify occupants in writing a minimum of 2 days prior to work start.

1.6.2. Submit copy of letter to Contracting Officer according to Section 01300.

1.7. SAFETY:

1.7.1. Contractor to comply with all OSHA/NEC Regulations.

1.7.2. Contractor to comply with MAFBI 32-2001, Responsibilities of Base Personnel to Eliminate or Control Fire Hazards.

1.8. PERMITS:

1.8.1. Clearance Work Request:

1.8.1.1. Contractor shall coordinate with appropriate

utility locating agencies, including base communications cable maintenance (Item 1 through 15) of AF Form 103, Base Civil Engineering Work Clearance

01005-3

Request. AF Form 103 will be given to the Contractor during the pre-construction meeting. Contractor shall complete and follow all instructions on AF Form 103 before start of work on base. A copy of AF Form 103 instructions will be available to the Contractor during the pre-construction meeting.

1.8.1.2. Before any excavation, alteration, or other

construction work is begun, the Contractor shall obtain and fully process an AF Form 103, Base Civil Engineering Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information, and sketches regarding any proposed excavation(s). Processing a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. The AF Form 103 shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of the signed form shall be submitted to the Contracting Officer and a copy to the project inspector. Completion of the AF Form 103 includes certifying compliance with institutional controls indicated by CEV, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.

1.8.1.3. Contractor shall schedule a meeting time to meet

with each utility agency at the work site to locate affected utilities.

1.8.1.4. Contractor shall maintain all marked utilities in

the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the Approving Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average shop rate of each agency. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him. Off-base utility locates agencies might request additional cost for repeat locates.

1.8.1.5. Clearance request is not valid until signed by the

Approving Officer, block 17 of the AF Form 103. Approving Officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the Approving Officer's signature; otherwise, clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.

1.8.1.6. Protection of Existing Utilities: The Contractor

shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling.

01005-4

1.8.2. Welding: When any welding, cutting, brazing, or any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department, 320 Flightline Drive, prior to beginning such work.

During such work, a fully charged and operable fire extinguisher, appropriate for the task, shall be provided by the Contractor. Notify Technical Representative prior to any welding.

1.9. HAZARDOUS WASTE: Any hazardous waste/material used or generated by the Contractor shall become the property of the Contractor. The use, generation and disposal of all hazardous waste/material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.

1.10. HAZARDOUS MATERIALS: Contractor shall submit prior to contract award Material Safety Data Sheet (MSDS’s) expected to be used during contract performance. Hazardous material shall be defined in the latest version of Federal Standard No. 313.

1.11. SUMMARY OF WORK:

1.11.1. Demolition required to complete the work specified and shown on the Drawings. This includes building, mechanical and electrical items. Contractor shall submit a disposal plan and comply with NDG-0700 Requirements.

1.11.2. Renovate HVAC system and associated general and

electrical construction as indicated in the plans and specifications.

1.11.3. Contractor shall submit a complete set of as-built

drawings at project completion. Drawings shall be submitted on mylar and on disk.

1.12. WORK SEQUENCE: Work shall commence immediately as authorized by the Contracting Officer.

1.13. SCHEDULING: The Contractor shall schedule work to minimize the amount of disturbance and disruption to the Using Agency. The Contractor shall coordinate the work schedule with the Contracting Officer.

1.14. AVAILABILITY OF WATER AND ELECTRICAL SERVICES: All reasonable quantities of water and electricity will be made available to the Contractor without charge.

1.15. ASBESTOS REMOVAL: MAFB will remove all asbestos-containing materials (ACM) on Low Temperature and High Temperature Hot Water Piping, Converter and Fabric Duct Connectors as required for the repair of Building HVAC Systems. The Contractor is responsible for contacting the MAFB Asbestos Shop at 701-723-2070 to arrange for ACM removal. The MAFB Asbestos Shop will require 72 hours to respond to each phase. Coordination shall be required in scheduling removal and determining time required for removal of ACM to comply with restrictions and procedures of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements,” in effect on the date of solicitation. The

01005-5

Contractor must comply with appropriate OSHA guidelines and allow the removal work at no additional cost to the Government.

1.16. ASBESTOS-CONTAINING MATERIAL: The Low Temperature and High Temperature Water Pipes, Converter, Penthouse Fan Duct Connectors are asbestos-containing material in this project’s work area. If asbestos materials are encountered or suspected, immediately stop work and notify the Asbestos Shop at 701-723-2072 or Environmental Engineering at 701-723-4825.

1.17. NEW MATERIALS CONTAINING RECYCLED MATERIALS: All new materials that are used for the construction of the project, its recycled quantities and weights shall be documented in a submittal as per Section 01300.

2. PRODUCTS: The products to be used in the work under this contract are described in the other Sections of these specifications.

3. EXECUTION:

3.1. TRAFFIC CONTROL: The Contractor shall provide all traffic control devices for pedestrian and vehicular traffic and will be responsible for maintaining all areas of new construction until accepted by the Government.

3.2. HAULING MATERIALS: The use of base streets for hauling materials will be permitted if the vehicles are equipped with pneumatic tires. The haul route the Contractor will take will be determined at the preconstruction conference.

3.3. DRAWINGS AND SPECIFICATIONS: At least one set of drawings and specifications shall be kept at the job site by the Contractor's crew chief.

3.4. WORK CONDUCT, CORRELATION, EXECUTION, ETC.:

3.4.1. Work Performance: Contractor shall conduct all work, including materials distribution in an orderly manner, and shall notify Contracting Officer within 2 workdays of mobilizing at the job site.

Contractor shall confine and limit his personnel to only those areas required for work performance. All work shall be performed in a neat, orderly fashion, with extreme care exercised to avoid damage to all property in and around project areas. Any damage caused by the Contractor shall be replaced, repaired, or restored to the Contracting Officer's satisfaction at no cost to the Government. Upon completion, all work and storage areas shall be cleaned of all evidence of Contractor's debris accumulations. Contractor's proposed work schedule shall be coordinated with the Contracting Officer or his/her designated representative 2 weeks prior to the start of any work. All work areas shall be barricaded properly for day and nighttime safety warning.

3.4.2. Storage: At close of each day's operations, all materials and equipment shall be moved to the storage area designated by Contracting Officer or his/her designated representative. If Contractor should have a storage structure or equipment located on base, it shall be removed, and storage area restored to its original condition within seven days after final acceptance of this project.

01005-6

3.5. QUALITY CONTROL: The Contractor shall provide a Quality Control Inspector who is familiar with all phases of operation. This individual may be the same person as the Job Supervisor or Foreman. The Quality Control Inspector's responsibility shall be to make constant quality control inspections of all phases of the operation, in order to assure constant compliance with the contract specifications.

3.6. UTILITIES: Water and electricity required will be furnished by the Government.

3.7. WORK PERMIT: The Contractor shall obtain from Construction Management, 5 Summit Drive, an approved AF Form 103, "Base Civil Engineering Work Clearance Request," prior to proceeding with an actual excavation.

3.8. SECURITY REQUIREMENTS:

3.8.1. Base Regulations: All activities of the Contractor and his employees shall be conducted in strict accordance with Minot AFB Security Regulations. Copies of these regulations will be furnished to the Contractor upon request.

3.8.2. Identification of Employees: The Contractor will submit to the Contracting Officer a personnel listing in three copies with each employee's name, address, SSN, home and business phone numbers, date and place of birth, and name, address and telephone number of the firm that will be working at the construction site. This listing must be provided NLT the date of the preconstruction conference. Changes to the list will take place prior to employees arriving at the job site. Each employee shall have two forms of identification to be permitted entry into the job site. One form of identification shall have a picture.

END OF SECTION

01045-1

SECTION 01045

CUTTING AND PATCHING

1.1. REQUIREMENTS INCLUDED:

1.1.1. Requirements and limitations for cutting and patching of work.

1.2. RELATED REQUIREMENTS:

1.2.1. Section 01005 - Summary of Work.

1.2.2. Individual specifications Sections:

1.2.2.1. Cutting and patching incidental to work of the

Section.

1.2.2.2. Advance notification to other Sections of openings

required in work of those Sections.

1.2.2.3. Limitations on cutting structural members.

1.3. SUBMITTALS:

1.3.1. Submit written request in advance of cutting or alteration which affects:

1.3.1.1. Structural integrity of any element of project.

1.3.1.2. Integrity of weather-exposed or moisture-resistant

element.

1.3.1.3. Efficiency, maintenance, or safety of any

operational element.

1.3.1.4. Visual qualities of sight-exposed elements.

1.3.1.5. Work by Government.

1.3.2. Include in request:

1.3.2.1. Identification of project.

1.3.2.2. Location and description of affected work.

1.3.2.3. Necessity for cutting or alteration.

01045-2

1.3.2.4. Description of proposed work and products to be

used.

1.3.2.5. Alternatives to cutting and patching.

1.3.2.6. Date and time work will be executed.

2. PRODUCTS:

2.1. MATERIALS:

2.1.1. Those required for original installation.

3.1. GENERAL:

3.1.1. Execute cutting, fitting, and patching (including

excavation and fill,) to complete work, and to:

3.1.1.1. Fit the several parts together, to integrate with

other work.

3.1.1.2. Uncover work to install ill-timed work.

3.1.1.3. Remove and replace defective and non-conforming

work.

3.1.1.4. Remove samples of installed work for testing.

3.1.1.5. Provide openings in elements of work for

penetrations of mechanical and electrical work.

3.2. INSPECTION:

3.2.1. Inspect existing conditions, including elements subject to damage or movement during cutting and patching.

3.2.2. After uncovering, inspect conditions affecting performance of work.

3.2.3. Beginning of cutting or patching means acceptance of

existing conditions.

3.3. PREPARATION:

3.3.1. Provide supports to assure structural integrity of

surroundings; devices and methods to protect other portions of project from damage.

3.3.2. Provide protection from elements for areas which may be exposed by uncovering work; maintain excavations free of water.

01045-3

3.4. PERFORMANCE:

3.4.1. Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.

3.4.2. Cut rigid materials using masonry saw or core drill.

Pneumatic tools not allowed.

3.4.3. Restore work with new products.

3.4.4. Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

3.4.5. To retain integrity of fire resistance at penetrations of fire-rated wall, ceiling, or floor construction, completely seal voids with fire-rated material, full thickness of the construction element.

3.4.6. Refinish surfaces to match adjacent finishes. For

continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.

01300-1

SECTION 01300

SUBMITTALS

1.1 PROCEDURES:

1.1.1 The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section.

1.1.2 Transmit each item under AF 3000, Material Approval Submittal form. Identify contract number, project number, and Contractor. Identify section and paragraph reference for each item submitted with the AF 3000.

Submit five (5) copies unless otherwise required elsewhere in the specification.

1.1.3 Unless specifically stated otherwise elsewhere in this

specification, each submittal shall be approved by the Contracting Officer prior to incorporation of materials into the work.

1.1.4 Approvals of submittals which do not conform to the Contract shall not be construed as a change to the contract.

1.1.5 The Contractor shall fill in the "Required Submission Date" on the AF Form 66s with the date he plans on submitting the submittals to the Government. A copy of the AF Form 66s with the required submission date filled in shall be submitted to the Contracting Officer for use by the contract administrator. Submit in accordance with Section 01300.

1.2 MANUFACTURER'S DATA AND SAMPLES: For the following types of submittals when a specific product of a specific manufacturer is identified (by catalog or product number, pattern, or style) and the Contractor does not desire to propose an alternate product as an equal, where an equal is allowed, a detailed submittal will not be required. The Contractor shall submit on an AF Form 3000 a list of submittals for which the specified products will be used. Submit in accordance with procedures identified in 1.1 above.

1.2.1 Product Data: Submit complete manufacturer's literature which describes all salient characteristics identified as requirements in the specification. Literature which is not specific to the proposed product shall be marked to indicate clearly which item is being proposed for use in this contract.

01300-2

1.2.2 Manufacturer's Certification: Submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.

1.2.3 Installation Instructions: Submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up (if applicable) and adjustments. Information shall include temperature restrictions and any other environmental limitations as well as substrate preparation requirements if any exist.

1.2.4 Samples:

1.2.4.1 Submit full range of manufacturer's standard colors, textures and patterns for specified items for selection by the Contracting Officer.

1.2.4.2 Submit samples to illustrate performance and

functional characteristics of the product. Samples shall include integral parts, attachment devices and specified accessories. Provide full identification information on each sample.

1.3 SHOP DRAWINGS: Drawings shall illustrate how the specified materials are integrated into the work as a whole. Adjacent materials which affect the complete installation of the specified products shall be shown and identified.

Deviations from Contract drawings shall be clearly identified and reason for deviation clearly explained.

1.4 TEST DATA: Test results shall be dated and signed by the agency performing the test.

1.5 WARRANTY: Submit detailed warranty information which identifies specifically items covered as well as exclusions from the warranty and the warranty period. All copies shall be dated and signed by an authorized officer of the company. The officer's name and title shall be typed on the warranty adjacent to the signature.

1.6 MISCELLANEOUS SUBMITTALS: Submittals which are none of the above types shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.

1.7 SUBMITTAL SCHEDULE: The following is a list of required submittals for this Contract.

SC

H

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T itl e:

S ol ic ita tio n/ C on tra ct N um be r

T O

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

E R

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A

TO

N um be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

AP

PR

O

VE

D D

IS

AP

PR

O

VE

D

S

E C

TI

O

N

/1 .8

P E

R M

IT

S

S

E C

TI

O

N

/1 .1

1.

N D

G -0

R E

Q U

IR

E

M E

N

TS

S

E C

TI

O

N

/1 .1

1.

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

A

S -B

U

IL

TS

S

E C

TI

O

N

/3 .8

.2 P

E R

S O

N N

E L

LI

S

TI

N

G

S

E C

TI

O

N

/1 .3

.1 C

U

TT

IN

G

O R

A

LT

E R

A

TI

O N

S

E C

TI

O

N

/1 .1

.5 A

F

FO

R M

S

E C

TI

O

N

/1 .2

.1 E

N V

IR

O

N M

E N

TA

L

C O

N

TR

O L

S

E C

TI

O

N

/3 .1

P R

E C

O N

S

TR

U C

TI

O

N S

U R

V E

Y

S

E C

TI

O

N

/3 .3

D

IS

P O

S A

L P

LA

N

S

E C

TI

O

N

/3 .8

S P

IL

L

P R

E V

E N

TI

O

N A

D

S

P O

N S

E

S

E C

TI

O

N

/1 .2

.1 .2

N O

TI

FI

C A

TI

O

N

01300-3

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1 .4

S

TA

TE

F

O R

M

S

E C

TI

O

N

/1 .4

.1 S

H O

P D

R A

W

IN

G S

S

E C

TI

O

N

/1 .4

.2

C Y

C

LE

D C

O N

TE

N

T

S

E C

TI

O

N

/1

.1

O

P D

R A

W

IN

G S

S

E C

TI

O

N

/1

C Y

C

LE

D C

O N

TE

N

T

S

E C

TI

O

N

/1 .4

.1 S

H O

P D

R A

W

IN

G S

S

E C

TI

O

N

/1

C Y

C

LE

D C

O N

TE

N

T

S

E C

TI

O

N

/1

C Y

C

LE

D C

O N

TE

N

T

S

E C

TI

O

N

/1 .5

C E

R

TI

FI

C

A

TI

O N

S A

N D

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .5

.5 R

E C

O R

D D

R A

W

IN

G S

S

E C

TI

O

N

/1 .5

.6

C

Y C

LE

D

C O

N

TE

N T

S

E C

TI

O

N

/1 .4

.1 S

H O

P D

R A

W

IN

G S

01300-4

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1 .4

.2 S

A M

P

LE

S

S

E C

TI

O

N

/1 .4

.3 R

E C

Y C

LE

D

C O

N

TE

S

E C

TI

O

N

/1 .3

.1 A

P P

LI

C

A

TI

O N

IN

S

TR

U

C

TI

O N

S

S

E C

TI

O

N

/1 .3

.2 C

E R

TI

FI

C A

TI

O

N

S

E C

TI

O

N

/1 .3

.3 S

A M

P

LE

S

S

E C

TI

O

N

/1 .3

C Y

C

LE

D C

O N

TE

N

T

S

E C

TI

O

N

/1

C O

N

FO

R M

A N

C E

R E

Q U

IR

E

M E

N

TS

E C

TI

O

N

/1 4.

R

E C

O R

D D

R A

W

IN

G S

S

E C

TI

O

N

/1 4.

O

M

M A

N U

A

LS

S

E C

TI

O

N

/1 .3

.1 P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .3

.2 P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .3

.3 P

R O

D U

C T

D A

TA

01300-5

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1 .3

.4 P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .3

.5 P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .3

.6 P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.2 C

E R

TI

FI

C A

TI

O

N O

F C

O M

P

LI

A N

C E

S

E C

TI

O

N

/1 .3

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.2 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.3 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.4 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.5 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.6 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.7 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

01300-6

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1 .4

.8 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.9 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/1 .4

.1

S H

O P

D R

A W

IN

G

S

P R

O D

U C

T D

A

TA

S

E C

TI

O

N

/2 .1

8.

TE

S

T R

E P

O R

T

S

E C

TI

O

N

/3 .1

2.

TE

S

T R

E P

O R

T

S

E C

TI

O

N

/1 .2

.1 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

01300-7

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1 .2

.2 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.3 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.4

TE

S T

R E

P O

R

TS

01300-8

S

E C

TI

O

N

/1 .2

.1 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.2 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.3 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.4 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.5 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.6 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .2

.7 S

H O

P D

R A

W

IN

G S

P

R O

D U

C T

D A

TA

S

E C

TI

O

N

/2 .8

TE

S

T R

E P

O R

TS

S

E C

TI

O

N

/1 .2

.2 .1

M A

N U

FA

C

TU

R

E R

'S D

A

TA

A F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

.1 .2

.2 .2

S H

O P

D R

A W

IN

G

S

S

E C

TI

O

N

/1 .2

.2 .3

C E

R

TI

FI

C

A

TE

O F

C O

M P

LI

A

N C

E

S

E C

TI

O

N

.1 .2

.2 .4

C E

R

TF

IE

D

D A

TA

S

E C

TI

O

N

/1 .2

.2 .5

O

M

IN

S

TR

U C

TI

O

N S

S

E C

TI

O

N

/1

P

O

D U

C T

D A

TA

E C

TI

O

N

/1

C

O R

D D

R A

W

IN

G S

S

E C

TI

O

N

/1

M M

A N

U A

LS

S

E C

TI

O

N

/3 .7

IN

TR

U C

TI

O

S

E C

TI

O

N

/1

O

D U

C T

D A

TA

S

E C

TI

O

N

/1

O D

U C

T D

A

TA

S

E C

TI

O

N

IN

TR

U C

TI

O

N S

S

E C

TI

O

N

/1

O D

U C

T D

A

TA

01300-9

F

Fo rm

ED

U

LE

O F

M A

TE

R

IA

LS

S U

B M

IT

TA

LS

P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B E

C O

M P

LE

TE

D B

Y C

O N

TR

A

C T

A D

M

IN

IS

TR

A be r o f C op ie s

R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

AC

T

R

EF

ER

EN

C E, T

YP

E O

F

SU

B M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

AR

K

S

R

EP

A

IR

H

VA

C S

YS

TE

M D

IN

IN

G H

A

LL

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

Q

JV

F

-0

S

E C

TI

O

N

/1

O D

U C

T D

A

TA

S

E C

TI

O

N

/1

O

D U

C T

D A

TA

S

E C

TI

O

N

TE

E C

TI

O

N

/1

O

D U

C T

D A

TA

S

E C

TI

O

N

/1

O

D U

C T

D A

TA

S

E C

TI

O

N

/1 .5

Q U

A

LI

FI

C

A

TI

O N

S O

F

IN

S

TA

LL

S

E C

TI

O

N

TE

S

E C

TI

O

N

W

R

R A

TY

E C

TI

O

N

/1

O

D U

C T

D A

TA

S

E C

TI

O

N

/1

O

P D

R A

W

IN

G S

01300-10

END OF SECTION

A F

Fo rm

01400-1

SECTION 01400

QUALITY CONTROL

1.1.1. General Quality Control.

1.1.2. Workmanship.

1.1.3. Manufacturers' Instructions.

1.1.4. Manufacturers' Certificates.

1.1.5. Mockups.

1.1.6. Manufacturers' Field Services.

1.1.7. Testing Laboratory Services.

1.2.1. Section 01300 - Submittals: Submittal of Manufacturers' Instructions.

1.2.2. Section 15800, Para. 2.11.1.14: Tests required for start-up of equipment.

1.3. QUALITY CONTROL: Maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.

1.4. WORKMANSHIP:

1.4.1. Comply with industry standards except when more

restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.

1.4.2. Perform work by persons qualified to produce workmanship of specified quality.

1.4.3. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.

1.5. MANUFACTURERS' INSTRUCTIONS: Comply with instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

01400-2

1.6. MANUFACTURERS' CERTIFICATES: When required by individual

Specifications Section, submit manufacturer's certificate (five copies) that products meet or exceed specified requirements.

1.7. MOCKUPS: Not required.

1.8. MANUFACTURERS' FIELD SERVICES:

1.8.1. When specified in respective Specification Sections, require manufacturer to provide qualified personnel to observe field conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, as applicable, and to make appropriate recommendations.

1.8.2. Representative shall submit written report to Contracting Officer listing observations and recommendations.

1.9. TESTING LABORATORY SERVICES:

1.9.1. Not required.

2. PRODUCTS: Not Used.

3. EXECUTION: Not Used.

01430-1

SECTION 01430

ENVIRONMENTAL PROTECTION

The Contractor shall perform all work in such manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. The Contractor shall be responsible for implementing the terms and requirements of NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM

CONSTRUCTION SITES.

IMPLEMENTATION: Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall:

Detail his proposal for implementing the requirements for environmental pollution control specified herein.

Meeting: Meet with representatives of the Contracting Officer to review and alter his proposal as needed for compliance with the environmental pollution control program,

2. PRODUCTS: (Not Used)

PRE-CONSTRUCTION SURVEY: Prior to start of any on-site construction activities, the Contractor and the Contracting Officer shall make a joint condition survey after which the Contractor shall prepare a brief report indicating on a layout plan the condition of trees, shrubs and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access route as applicable. This report will be signed by both the Contracting Officer and Contractor upon mutual agreement as to its accuracy and completeness.

PROTECTION OF LAND AREAS: Except for work areas, storage areas, or access routes specifically assigned for the use of the Contractor under this contract, the land areas outside the limits of permanent work performed under this contract shall be preserved in their present condition. The Contractor shall confine his construction activities to areas defined for work on the plans or specifically assigned for his use. Storage and related areas and access routes required temporarily by the Contractor in the performance of the work will be assigned by the Contracting Officer.

Protection of Trees and Shrubs: Not applicable.

Protection of Water Resources: Not applicable.

WASTE DISPOSAL: As part of his proposed implementation under paragraph 1.2, and prior to on-site construction, the Contractor shall submit

01430-2 a description of his scheme for handling and disposing of all waste resulting from the work under this contract. If any waste is dumped in unauthorized areas, the Contractor shall remove the waste and restore the area to the condition of the adjacent undisturbed areas. Where directed, soil which is contaminated by the Contractor shall be excavated, disposed of as approved by the Contracting Officer, and replaced with suitable fill material, all at the expense of the Contractor.

BURNING: Burning shall be prohibited on the Government premises.

DUST CONTROL: Not applicable.

CORRECTIVE ACTION: The Contractor shall, upon receipt of a notice in writing of any noncompliance with the foregoing provisions, take immediate corrective action. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs of damages by the Contractor unless it was later determined that the Contractor was in compliance.

POST-CONSTRUCTION CLEANUP OR OBLITERATION: The Contractor shall, unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed areas shall be graded and filled and the entire area seeded.

SPILL PREVENTION AND RESPONSE PLAN: The Contractor shall include a Spill Prevention and Response Plan in the Implementation Proposal. The plan shall describe the Contractor's procedures for preventing and responding to spills of hazardous materials.

ARCHEOLOGICAL PRESERVATION: Not applicable.

NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM

CONSTRUCTION SITES:

Not applicable.

01500-1

SECTION 01500

CONSTRUCTION FACILITIES & TEMPORARY CONTROLS

1.1.1. Electricity, Lighting.

1.1.2. Heat, Ventilation.

1.1.3. Water.

1.1.4. Sanitary Facilities.

1.1.5. Barriers.

1.1.6. Enclosures.

1.1.7. Protection of Installed Work.

1.1.8. Security.

1.1.9. Water Control.

1.1.10. Cleaning During Construction.

1.1.11. Project Identification.

1.1.12. Field Offices and Sheds.

1.2.1. Outages.

1.2.1.1. Outages shall include:

1.2.1.1.1. Blocking of Roadway.

1.2.1.1.2. Blocking of Parking Lots.

1.2.1.1.3. Power Outages.

1.2.1.1.4. High Temperature Hot Water Lines.

1.2.1.2. Notification

1.2.1.2.1. The Contractor shall notify the inspector, in writing, seven days in advance of the intended outage.

01500-2

1.2.1.2.2. The Contractor shall notify the Fire

Department of an intended roadway blockage.

1.3. REGULATIONS: The Contractor shall comply with the prevention practice contained in NFPA Standard #241, Standard for Safeguarding Building Construction and Demolition Operations.

1.4. ELECTRICITY:

1.4.1. All reasonable quantities of utilities will be made

available to the Contractor at no charge.

1.4.2. Provide service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of Construction-type power cords.

1.4.3. Provide lighting for construction operations.

1.4.4. Existing and permanent lighting may be used during

construction. Maintain lighting and make routine repairs.

1.4.5. Refer to Section 16010 - Electrical General Provisions for electrical outage requirements.

1.5. HEAT, VENTILATION:

1.5.1. Provide as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity.

1.5.2. Coordinate use of existing facilities with Using Agency;

extend and supplement with temporary units as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity. The Government will furnish all Contractor energy.

1.5.3. Prior to operation of permanent facilities for temporary purposes, verify that installation is approved for operation, and that filters are in place. Provide for operation and maintenance.

1.5.4. Provide ventilation of enclosed areas to cure materials, to disperse humidity, and to prevent accumulations of dust, fumes, vapors, or gases.

1.6. WATER:

1.6.1. Provide service required for construction operations.

Extend branch piping with outlets located so that water is available by use of hoses.

01500-3

1.7. SANITARY FACILITIES:

1.7.1. Designated existing facilities may be used during

construction operations; maintain in sanitary condition.

1.8. BARRIERS:

1.8.1. Provide as required to prevent public entry to

construction areas and to protect existing facilities and adjacent properties from damage from construction operations.

1.8.2. Provide barricades as required by governing authorities for public right-of-way and for public access to existing building.

1.8.3. Provide barriers around trees and plants designated to remain. Protect against vehicular traffic, stored materials, dumping, chemically injurious materials, and puddling or continuous running water.

1.9. ENCLOSURES:

1.9.1. Provide temporary, weather-tight closures of openings in exterior surfaces to provide acceptable working conditions and protection for materials, to allow for temporary heating, and to prevent entry of unauthorized persons. Provide doors with self-closing hardware and locks.

1.9.2. Provide temporary partitions and ceilings as required to separate work areas from Using Agency occupied areas, to prevent penetration of dust and moisture into occupied areas, to prevent damage to existing areas and equipment. Construction: Framing and sheet materials with closed joints and sealed edges at intersections with existing surfaces; STC rating 35 in accordance with ASTMÖE90; Flame Spread Rating of 25 in accordance with

ASTMÖ#84.

1.10. PROTECTION OF INSTALLED WORK:

1.10.1. Provide temporary protection for installed products.

Control traffic in immediate area to minimize damage.

1.10.2. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings. Protect finished floors and stairs from traffic, movement of heavy objects, and storage.

1.10.3. Prohibit traffic and storage on waterproofed on lawn and landscaped areas. Limit and traffic and storage on waterproofed and roofed surfaces

1.11. SECURITY:

1.11.1. Provide security program and Using Agency's facilities to protect work, existing facilities and Using Agency's operations from unauthorized entry, vandalism, and theft. Coordinate with Contracting Officer and Security Police.

1.12. WATER CONTROL:

01500-4

1.12.1. Not applicable.

1.13. CLEANING DURING CONSTRUCTION:

1.13.1. Control accumulation of waste materials and rubbish;

periodically dispose of off-site daily.

1.13.2. Clean interior areas prior to start of finish work, maintain areas free of dust and other contaminants during finishing operations.

1.14. FIELD OFFICES AND SHEDS:

1.14.1. Office: Weather-tight, with lighting, electrical

outlets, heating, and ventilating equipment.

1.14.2. Storage Sheds for Tools, Materials, and Equipment:

Weathertight with heat and ventilation for products requiring controlled conditions, with adequate space for organized storage and access, and lighting for inspection of stored materials.

1.15. REMOVAL:

1.15.1. Remove temporary materials, equipment, services, and

construction prior to substantial completion inspection.

1.15.2. Clean and repair damage caused by installation or use of temporary facilities and services; restore existing facilities used during construction to specified, or to original condition.

1.15.3. The Contractor shall daily maintain the site in a clean and orderly manner in accordance with Corp of Engineers Manual EM 385-1-1.

2. PRODUCTS: Not Used.

3. EXECUTION: Not Used.

01700-1

SECTION 01700

CONTRACT CLOSE-OUT

1.1.1. Close-out Procedures.

1.1.2. Final Cleaning.

1.1.3. Project Record Documents.

1.1.4. Operation and Maintenance Data.

1.1.5. Warranties and Bonds.

1.1.6. Spare Parts and Maintenance Materials.

1.2.1. Section 01005 - Administrative Provisions, Summary of

Work: Partial Using Agency Occupancy.

1.2.2. Section 01500 - Construction Facilities and Temporary

Controls: Cleaning during construction.

1.3. CLOSE-OUT PROCEDURES:

1.3.1. Using Agency will occupy project for the purpose of

conduct of business under provision stated in Certificate of Substantial Completion.

1.3.2. When Contractor considers Work has reached final

completion, submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for final inspection.

1.4. FINAL CLEANING:

1.4.1. Execute prior to final inspection.

1.4.2. Clean interior and exterior surfaces exposed to view;

remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces. Clean equipment and fixtures to a sanitary condition, clean or replace filters of mechanical equipment.

01710-1

SECTION 01710

FINAL CLEANING

1.1.1. Final cleaning of project.

1.2.1. Individual Specifications Sections: Specific cleaning for product or work.

1.3. DESCRIPTION:

1.3.1. Execute cleaning prior to inspection for Final Completion of the work.

1.3.2. Execute exterior and site cleaning.

2. PRODUCTS:

2.1. CLEANING MATERIALS:

2.1.1. Use materials which will not create hazards to health or property, and which will not damage surfaces.

2.1.2. Use only materials and methods recommended by manufacturer of material being cleaned.

3.1. CLEANING:

3.1.1. In addition to removal of debris and cleaning specified in other sections, clean interior and exterior exposed-to-view surfaces.

3.1.2. Remove temporary protection and labels not required to remain.

3.1.3. Clean finishes free of dust, stains, films and other

foreign substances.

3.1.4. Clean transparent and glossy materials to a polished

condition; remove foreign substances. Polish reflective surfaces to a clear shine.

3.1.5. Vacuum clean carpeted and similar soft surfaces.

01710-2

3.1.6. Clean, (damp mop,) and hard surface floors as specified.

3.1.7. Clean surfaces of equipment; remove excess lubrication.

3.1.8. Clean plumbing food service equipment to a sanitary

condition.

3.1.9. Clean permanent filters of ventilating equipment and

replace disposable filters when units have been operated during construction;

in addition, clean ducts, blowers, and coils when units have been operated without filters during construction.

3.1.10. Clean light fixtures and lamps in area of construction.

3.1.11. Maintain cleaning until substantial completion, completion, or occupancy by Using Agency.

3.1.12. Remove waste, foreign matter, and debris from roofs, gutters, area ways, and drainage systems.

3.1.13. Remove waste, debris, and surplus materials from site.

Clean ground; remove stains, spills and foreign substances from paved areas and sweep clean.

02072-1

QJVF 07-0150

DIVISION 2 - SITEWORK

SECTION 02072

MINOR DEMOLITION FOR REMODELING

1.1 WORK INCLUDED:

1.1.1 Notify the North Dakota Department of Health using form SFN 17987, Notification of Demolition and Renovation. (See Attachment at end of this section.)

1.1.2 Remove designated ceilings, roof structures and components.

1.1.3 Cap and identify exposed utilities.

1.1.4 Provide temporary partitions to allow continued building occupancy.

1.1.5 All material resulting from demolition work, except as

indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Minot AFB.

1.1.6 Work shall include furnishing all necessary labor, materials, tools, and equipment necessary to demolish work specified and/or indicated on the drawings.

1.2 RELATED WORK:

1.2.1 Section 01500: Temporary enclosures.

1.2.2 Section 01500: Dust control.

1.3 PROTECTION:

1.3.1 Do not interfere with use of adjacent rooms and spaces.

Maintain free and safe passage to and from.

1.3.2 Prevent movement or settlement of structure(s). Provide and place bracing or shoring and be responsible for safety and support of structure. Assume liability for such movement, settlement, damage or injury.

02072-2

1.3.3 Cease operations and notify the Contracting Officer

immediately if safety of structure appears to be endangered. Take precautions to properly support structure. Do not resume operations until safety is restored.

1.3.4 Provide, erect, and maintain barricades, lighting, and guard rails as required to protect occupants of building and workers.

1.4 SUBMITTAL:

Copy of Form SFN 17987 that is being sent to North Dakota Department of Health as performed under provisions of Section 01300.

2. PRODUCTS:

2.1 MATERIALS:

2.1.1 Retain for reuse materials and equipment as indicated on plans.

2.1.2 Except where noted otherwise, maintain possession of materials being demolished. Immediately remove from site.

3. EXECUTION:

3.1 PREPARATION:

3.1.1 Erect and maintain dustproof partitions as required to prevent spread of dust, fumes and smoke to other parts of the building. On completion, remove partitions and repair damaged surfaces to match adjacent surfaces.

3.1.2 Carry out demolition work to cause as little inconvenience to adjacent occupied building areas as possible.

3.1.3 Install fencing around openings to protect workers. Post clearly visible warning signs.

3.2 DEMOLITION:

3.2.1 Demolish in an orderly and careful manner as required to accommodate new work.

3.2.2 Perform demolition in accordance with applicable authorities having jurisdiction.

02072-3

3.2.3 Repair all demolition performed in excess of that required, at no cost to the Air Force.

3.2.4 Burning of…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Amendment 0002.pdf PDF
Drawing C1 of 9 Sept 2.pdf PDF
Drawing C2 of 9 Sept 2.pdf PDF
Drawing C7 of 9 Sept 2.pdf PDF
Attachment 6 - Spec Revision 01005-1.pdf PDF
Attachment 6 - Spec Revision 13282-5.pdf PDF
amendment to change due date.doc DOC document
Amendment to Specs.doc DOC document
Attachment 4 Recent and Relevant.docx DOCX document
amendment 2 SF 30.doc DOC document
amendment 1.doc DOC document
Attachment 4 Recent and Relevant.docx DOCX document
ATTACHMENT 5 RESPONSIBILITY.doc DOC document
WD.doc DOC document
01-0034.pdf PDF
Solicitation Document.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .