Specifications.pdf
PDF 4 MB Posted
- Solicitation number
- FA4528-09-R-0016
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.doc | DOC document | |
| SolicitationP0002.doc | DOC document | |
| Solicitation for CE HVAC.doc | DOC document | |
| Attachment 6 Technical Acceptance Criteria.doc | DOC document | |
| Attachment 2, Wage Determination.doc | DOC document | |
| CE Amendment 0001.doc | DOC document | |
| Attachment 5, Responsibility.doc | DOC document | |
| Drawings.pdf | ||
| Attachment 1, Wage Determination.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S P E C I F I C A T I O N
FOR PROJECT
QJVF 05-0063
REPAIR HVAC BLDG 445
AT
MINOT AIR FORCE BASE, NORTH DAKOTA
PREPARED BY:
5 CES, ENGINEERING FLIGHT
MINOT AIR FORCE BASE, NORTH DAKOTA
FEB 2009
i
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS SECTION PAGES
01005 ADMINISTRATIVE PROVISIONS 01005-1 THRU 01005-8
01045 CUTTING AND PATCHING 01045-1 THRU 01045-3
01300 SUBMITTALS 01300-1 THRU 01300-5
01400 QUALITY CONTROL 01400-1, 2
01430 ENVIRONMENTAL PROTECTION 01430-1 THRU 01430-11
01500 CONSTRUCTION FACILITIES & TEMPORARY 01500-1 THRU 01500-13
CONTROLS
01700 CONTRACT CLOSE-OUT 01700-1, 2
01710 FINAL CLEANING 01710-1, 2
DIVISION 2 - SITEWORK
02072 MINOR DEMOLITION FOR REMODELING 02072-1 THRU 02072-3
02085 ASBESTOS REMOVAL AND DISPOSAL 02085-1 THRU 02085-75
02221 TRENCHING 02221-1 THRU 02221-4
02485 SEEDING 02485-1 THRU 02485-4
DIVISION 3 – CONCRETE
03001 CONCRETE 03001-1 THRU 03001-4
DIVISION 4 – MASONRY
04100 MORTAR 04100-1 THRU 04100-3
04300 UNIT MASONRY SYSTEM 04300-1 THRU 04300-5
DIVISION 5 – METALS
05500 METAL FABRICATION 05500-1 THRU 05500-6
DIVISION 6 – WOOD AND PLASTIC
06100 ROUGH CARPENTRY 06100-1 THRU 06100-3
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07200 INSULATION 07200-1 THRU 07200-3
07275 FIRESTOPPING 07275-1 THRU 07275-4
07560 EPDM ROOFING SYSTEM 07560-1 THRU 07560-15
07900 SEALANTS 07900-1 THRU 07900-3
DIVISION 8 - NOT USED
DIVISION 9 - FINISHES
09260 GYPSUM WALLBOARD SYSTEMS 09260-1 THRU 09260-4
09900 PAINTING 09900-1 THRU 09900-5
ii
(CON’T.)
TABLE OF CONTENTS (CON’T.)
DIVISION 10 – 13 NOT USED
DIVISION 15 – MECHANICAL SECTION PAGES
15010 GENERAL PROVISIONS 15010-1 THRU 15010-5
15250 THERMAL INSULATION FOR MECHANICAL 15250-1 THRU 15250-10
SYSTEMS
15600 HYDRONIC HEATING AND COOLING 15600-1 THRU 15600-10
15707 WATER SOURCE HEAT PUMPS 15707-1 THRU 15707-8
15708 CLOSED-LOOP/GEOTHERMAL HEAT PUMP 15708-1 THRU 15708-9
SYSTEMS
15800 AIR SUPPLY AND DISTRIBUTION SYSTEM 15800-1 THRU 15800-14
15904 FACILITY MANAGEMENT SYSTEM (FMS) 15904-1 THRU 15904-7
DIVISION 16 - ELECTRICAL
16010 GENERAL PROVISIONS 16010-1 THRU 16010-5
16020 REMODELING WORK 16020-1, 2
16040 IDENTIFICATION 16040-1, 2
16110 RACEWAY 16110-1 THRU 16110-5
16120 LOW VOLTAGE CONDUCTORS 16120-1 THRU 16120-3
16130 OUTLET PULL & JUNCTION BOXES 16130-1 THRU 16130-3
16140 WIRING DEVICES AND DEVICE PLATES 16140-1 THRU 16140-2
16160 MOTOR STARTERS 16160-1 THRU 16160-4
16170 DISCONNECTS 16170-1, 2
16181 FUSES 16181-1, 2
16450 GROUNDING 16450-1, 2
16471 PAELBOARDS 16471-1 THRU 16471-5
16722 FIRE ALARM 16722-1 THRU 16722-4
16851 ELECTRIC HEATING EQUIPMENT 16851-1 THRU 16851-1
16900 CONNECTIONS TO EQUIPMENT 16900-1, 2
DIVISION l - GENERAL REQUIREMENTS
SECTION 01005
ADMINISTRATIVE PROVISIONS
1. GENERAL:
1.1. DESCRIPTION OF WORK:
1.1.1. Work of this Contract MIN 05-0063, comprises general, mechanical and electrical construction at 5 CES, Bldg. 445 located at 320 Peacekeeper Place Minot Air Force Base, North Dakota.
1.1.2. Work shall include replacing of HVAC system and associated General and electrical work including demolition and asbestos removal.
1.2. COORDINATION:
1.2.1. Coordinate work of the various Sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later.
1.2.2. Verify characteristics of elements of interrelated
operating equipment are compatible; coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
1.2.3. Coordinate space requirements and installation of
mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
1.2.4. In finished areas (except as otherwise shown,) conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements.
1.2.5. Execute cutting and patching to integrate elements of
Work, uncover ill-timed, defective, and non-conforming work, provide openings for penetrations of existing surfaces and provide samples for testing. Seal penetrations through floors, walls, and ceilings.
1.3. CONTRACTOR'S WORK HOURS: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:00 p.m., excluding Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, additional Government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates
01005 - 1 will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.
1.4. REFERENCE STANDARDS:
1.4.1. For products specified by association or trade standards, comply with requirements of the standard.
1.4.2. The date of the standard is that in effect as of the
Invitation for Bid date.
1.5. SAFETY:
1.5.1. Contractor to comply with all OSHA/AFOSH/NEC Regulations.
1.5.2. Contractor to comply with MAFBI 32-2001, Responsibilities of Base Personnel to Eliminate or Control Fire Hazards.
1.6. PERMITS:
1.6.1. Clearance Work Request:
1.6.1.1. Contractor shall coordinate with appropriate
utility locating agencies, including base communications cable maintenance (Item 1 through 15) of AF Form 103, Base Civil Engineering Work Clearance Request. AF Form 103 will be given to the Contractor during the pre-construction meeting. Contractor shall complete and follow all instructions on AF Form 103 before start of work on base. A copy of AF Form 103 instructions will be available to the Contractor during the pre-construction meeting.
1.6.1.2. Before any excavation, alteration, or other
construction work is begun, the Contractor shall obtain and fully process an AF Form 103, Base Civil Engineering Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information, and sketches regarding any proposed excavation(s). Processing a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. The AF Form 103 shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of the signed form shall be submitted to both the Contracting Officer and to the project Inspector. Completion of the AF Form 103 includes certifying compliance with institutional controls indicated by CEV, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.
1.6.1.3. Contractor shall schedule a meeting time to meet
with each utility agency at the work site to locate affected utilities.
1.6.1.4. Contractor shall maintain all marked utilities in
the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the Approving Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average
01005 - 2 shop rate of each agency. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him. Off-base utility locates agencies might request additional cost for repeat locates.
1.6.1.5. Clearance request is not valid until signed by the
Approving Officer, block 17 of the AF Form 103. Approving Officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the Approving Officer's signature; otherwise, clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.
1.6.1.6. Protection of Existing Utilities: The Contractor
shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling.
1.6.2. Welding: When any welding, cutting, brazing, or any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department, 320 Flightline Drive, prior to beginning such work.
During such work, a fully charged and operable fire extinguisher, appropriate for the task, shall be provided by the Contractor. Notify Technical Representative prior to any welding.
1.7. SUMMARY OF WORK:
1.7.1. Demolition required to complete the work specified and shown on the Drawings. This includes building, mechanical and electrical items. Contractor shall submit a disposal plan and comply with NDG-0700 Requirements.
1.7.2. Renovate HVAC system and associated general and electrical construction as indicated in the plans and specifications.
1.7.3. RECORD DRAWINGS: Throughout the progress of construction, the Contractor shall keep a set of current, detailed field record drawings indicating significant deviations from the contract Drawings, and/or installation drawings, and exact location of concealed work. This requirement does not authorize any deviations without approval of the Contracting Officer.
1.7.3.1. "Concealed" shall mean work covered by earth, floors, walls, slabs and inaccessible ceilings. Work covered by accessible ceilings shall not be considered concealed.
1.7.3.2. The field record information shall be marked in a
legible manner on prints of the Contract Drawings furnished by the Contracting Officer. The field information to be so marked shall include:
1.7.3.2.1. Significant deviations of any nature made
during construction.
01005 - 3
1.7.3.2.2. Location of mechanical equipment and
services, utilities, and appurtenances that are concealed in the building, referenced to accessible features of the building.
1.7.3.2.3. Location of all exterior mechanical
utilities referenced to permanent landscape features.
1.7.3.3. Upon completion of the work, the field information
marked on prints of Contract Drawings shall be delivered by the Contractor to the Contracting Officer for approval.
1.7.3.4. Contractor shall submit a complete set of as-built
drawings at project completion. Drawings shall be submitted on mylar and on disk.
1.8. WORK SEQUENCE: Work shall commence immediately as authorized by the Contracting Officer.
1.9. SCHEDULING: The Contractor shall schedule work to minimize the amount of disturbance and disruption to the Using Agency. The Contractor shall coordinate the work schedule with the Contracting Officer.
1.10. EQUIPMENT PARKING: Space for the Contractor's equipment will be allotted on MAFB. The exact location will be chosen during the preconstruction conference and shall be approved by the Contracting Officer or his/her Technical Representative at that time. The Government shall not be liable for the security of any of the Contractor's equipment or material while on MAFB.
1.11. ENVIRONMENTAL PROTECTION: The Contractor shall comply with applicable federal, state and local laws and regulations governing pollution control and abatement and all applicable provisions of the Corps of Engineers' Manual EM 385-1-1 entitled, "General Safety Requirements," in effect on the date of solicitation. The Contractor shall comply with the safety provisions of OSHA.
1.12. OUTAGES: Outages shall be kept to a minimum amount of time.
The Contractor shall notify the inspector, in writing, of his intention to take outages. Such notification shall be given seven (7) days in advance of his intended outage. Any anticipated blocking of roadways, parking area, etc., is to be covered under the same advance request. The Contractor's outage and procedures will be confirmed by receipt of AF Form 269, "Electrical Facilities Safe Clearance." No outages will be permitted from November to 1 May.
1.13. AVAILABILITY OF WATER AND ELECTRICAL SERVICES: All reasonable quantities of water and electricity will be made available to the Contractor without charge.
1.14. HAZARDOUS WASTE: Any hazardous waste/material used or generated by the Contractor shall become the property of the Contractor. The use, generation and disposal of all hazardous waste/material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.
1.15. HAZARDOUS MATERIALS: Contractor shall submit prior to contract award Material Safety Data Sheet (MSDS’s) expected to be used during contract
01005 - 4 performance. Hazardous material shall be defined in the latest version of Federal Standard No. 313.
1.16. LEAD BASED PAINT (LBP): The existing building construction area has been tested for Lead Based Paint (LBP) and there were no surface coatings identified to contain lead-based paint which is defined as containing LBP exceeding 1.0 milligrams per square centimeter or 0.5% by weight. The existing building may contain Lead Based Paint (LBP) in areas not tested.
Painted surfaces that have not been tested for LBP must be assumed to contain LBP exceeding 1.0 milligrams per square centimeter or 0.5% by weight. The work under this contract is routine maintenance, not LBP abatement.
Occupational Safety and Health Administration (OSHA) standards 29 CFR 1910.1001, General Industry, 29 CFR 1910.1025, General Industry Lead Standard, and 29 CFR 1926.58, Construction Industry will apply.
1.17. ASBESTOS REMOVAL: Construction area DOES contain asbestos.
Existing insulation on pipe, pipe elbows and fittings are known to contain asbestos fibers. All asbestos on piping that is to be removed will be removed by Asbestos Abatement Contractor prior to this work. The Contractors shall avoid the disturbance of asbestos-containing building components. Contractor is assumed to be knowledgeable about all Federal, State, and Local requirements with respect to asbestos issues. Verify with Owner’s “Asbestos Survey and Management Plan” the extent of any existing asbestos within the construction area or elsewhere on site. Coordination shall be required in scheduling removal and determining time required for removal of ACM to comply with restrictions and procedures of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements,” in effect on the date of solicitation. The Contractor must comply with appropriate OSHA guidelines and allow the removal work at no additional cost to the Government.
1.18. ASBESTOS-CONTAINING MATERIAL: The Hot Water Heating Pipes, insulation are asbestos-containing material in this project’s work area. If asbestos material are encountered or suspected, immediately stop work and notify the Asbestos Shop at 701-723-2072 or Environmental Engineering at 701- 723-4825.
2. PRODUCTS: The products to be used in the work under this contract are described in the other Sections of these specifications.
3. EXECUTION:
3.1. TRAFFIC CONTROL: The Contractor shall provide all traffic control devices for pedestrian and vehicular traffic and will be responsible for maintaining all areas of new construction until accepted by the Government.
3.2. HAULING MATERIALS: The use of base streets for hauling materials will be permitted if the vehicles are equipped with pneumatic tires. The haul route the Contractor will take will be determined at the preconstruction conference.
3.3.DRAWINGS AND SPECIFICATIONS: At least one set of drawings and specifications shall be kept at the job site by the Contractor's crew chief.
3.4.WORK CONDUCT, CORRELATION, EXECUTION, ETC.:
01005 - 5
3.4.1.Work Performance: Contractor shall conduct all work, including materials distribution in an orderly manner, and shall notify Contracting Officer within two (2) workdays of mobilizing at the job site.
Contractor shall confine and limit his personnel to only those areas required for work performance. All work shall be performed in a neat, orderly fashion, with extreme care exercised to avoid damage to all property in and around project areas. Any damage caused by the Contractor shall be replaced, repaired, or restored to the Contracting Officer's satisfaction at no cost to the Government. Upon completion, all work and storage areas shall be cleaned of all evidence of Contractor's debris accumulations. Contractor's proposed work schedule shall be coordinated with the Contracting Officer or his/her designated representative two (2) weeks prior to the start of any work. All work areas shall be barricaded properly for day and nighttime safety warning.
3.4.2. Storage: At close of each day's operations, all materials and equipment shall be moved to the storage area designated by Contracting Officer or his/her designated representative. If Contractor should have a storage structure or equipment located on base, it shall be removed, and storage area restored to its original condition within seven days after final acceptance of this project.
3.5.QUALITY CONTROL: The Contractor shall provide a Quality Control Inspector who is familiar with all phases of operation. This individual may be the same person as the Job Supervisor or Foreman. The Quality Control Inspector's responsibility shall be to make constant quality control inspections of all phases of the operation, in order to assure constant compliance with the contract specifications.
3.6. ROAD CLOSURES: The Contractor shall notify the MAFB Fire Department and Contracting Officer of the road closure at least one hour prior to closure and advise the Fire Department when the road is reopened.
3.7. FIELD ENGINEERING: Provide field engineering services; establish grades, lines, and levels, by use of recognized engineering survey practices.
Control datum for survey is that shown on drawings.
3.8. UTILITIES: Water and electricity required will be furnished by the Government.
3.9.GOVERNMENT-CAUSED DELAYS:
3.9.1.Scheduled Work Delays: The Contractor shall allow a total of 30 minutes processing time to enter or leave a secure area. This cost shall have been factored into the Contractor's bid price.
3.9.2.Unscheduled Work Delays: In the event of a missile movement or required generation, the Contractor will be required to vacate the area of all personnel, equipment, and materials for a indefinite period. The Contractor shall bid an hourly rate for these delays. The on-site supervisor shall notify the contract administrator within 2 days of the delay.
3.10.SECURITY REQUIREMENTS:
3.10.1. Base Regulations: All activities of the Contractor and his employees shall be conducted in strict accordance with Minot AFB Security Regulations. Copies of these regulations will be furnished to the Contractor upon request.
01005 - 6
01005 - 7
3.10.2.Identification of Employees: The Contractor will submit to the Contracting Officer a personnel listing in three copies with each employee's name, address, SSN, home and business phone numbers, date and place of birth, and name, address and telephone number of the firm that will be working at the construction site. This listing must be provided NLT the date of the preconstruction conference. Changes to the list will take place prior to employees arriving at the job site. Each employee shall have two forms of identification to be permitted entry into the job site. One form of identification shall have a picture.
3.11. RECYCLING/REUSE OF EXCESS MATERIALS AND CONSTRUCTION AND
DEMOLITION (C&D) DEBRIS: The Contractor shall reuse/recycle excess materials and Construction and Demolition (C&D) debris to the maximum extent possible.
C&D debris are those excess/residue materials resulting from construction or demolition activity that would normally be discarded to a landfill.
C&D debris includes, but is no limited to soil, rock, vegetation, concrete, asphalt, and building materials such as windows, wood, metal, and roofing materials. The Contractor shall recycle C&D debris and excess materials, if determined to be economical. All C&D debris resulting from demolition shall become the property of the Contractor unless specified otherwise or as determined by the Contracting Officer.
3.11.1. Materials not to be returned to the Government and all Contractor-generated rubbish, if not recycled, shall be disposed of by the Contractor off-base at his own expense, and in compliance with applicable environmental codes and regulations of governing authorities.
3.11.2. Reporting Tonnage of C&D Debris: Contractor shall track and report monthly the tonnage of C&D debris in two categories:
3.11.2.1. Tons of C&D that is or will be recycled or
reused.
3.11.2.2. Tons of C&D that is disposed in a landfill.
3.11.3. The C&D recycled/disposed tonnage report shall consist of a written memo with the tonnage of each category (recycled and disposed tonnage) submitted to 5 CES/CEVP through the Contracting Officer. Submit C&D recycled and disposed tonnage report monthly until the project is completed.
END OF SECTION
01045-1
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01045
CUTTING AND PATCHING
1.1 REQUIREMENTS INCLUDED:
1.1.1 Requirements and limitations for cutting and patching of work.
1.2 RELATED REQUIREMENTS:
1.2.1 Individual specifications Sections:
1.2.1.1 Cutting and patching incidental to work of the
Section.
1.2.1.2 Advance notification to other Sections of openings
required in work of those Sections.
1.2.1.3 Limitations on cutting structural members.
1.3 SUBMITTALS:
1.3.1 Submit written request in advance of cutting or alteration which affects:
1.3.1.1 Structural integrity of any element of project.
1.3.1.2 Integrity of weather-exposed or moisture-resistant
element.
1.3.1.3 Efficiency, maintenance, or safety of any operational element.
1.3.1.4 Visual qualities of sight-exposed elements.
1.3.1.5 Work by Government.
1.3.2 Include in request:
1.3.2.1 Identification of project.
01045-2
1.3.2.2 Location and description of affected work.
1.3.2.3 Necessity for cutting or alteration.
1.3.2.4 Description of proposed work and products to be used.
1.3.2.5 Alternatives to cutting and patching.
1.3.2.6 Date and time work will be executed.
2. PRODUCTS:
2.1 MATERIALS:
2.1.1 Those required for original installation.
3. EXECUTION:
3.1 GENERAL:
3.1.1 Execute cutting, fitting, and patching (including excavation and fill,) to complete work, and to:
3.1.1.1 Fit the several parts together, to integrate with
other work.
3.1.1.2 Uncover work to install ill-timed work.
3.1.1.3 Remove and replace defective and non-conforming work.
3.1.1.4 Remove samples of installed work for testing.
3.1.1.5 Provide openings in elements of work for penetrations of mechanical and electrical work.
3.2 INSPECTION:
3.2.1 Inspect existing conditions, including elements subject to damage or movement during cutting and patching.
3.2.2 After uncovering, inspect conditions affecting performance of work.
3.2.3 Beginning of cutting or patching means acceptance of existing conditions.
01045-3
3.3 PREPARATION:
3.3.1 Provide supports to assure structural integrity of
surroundings; devices and methods to protect other portions of project from damage.
3.3.2 Provide protection from elements for areas which may be exposed by uncovering work; maintain excavations free of water.
3.4 PERFORMANCE:
3.4.1 Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.
3.4.2 Cut rigid materials using masonry saw or core drill.
Pneumatic tools not allowed.
3.4.3 Restore work with new products.
3.4.4 Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
3.4.5 To retain integrity of fire resistance at penetrations of fire-rated wall, ceiling, or floor construction, completely seal voids with fire-rated material, full thickness of the construction element.
3.4.6 Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.
01300-1
SECTION 01300
SUBMITTALS
1.1 PROCEDURES:
1.1.1 The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section to the Contracting Officer for approval.
1.1.2 Transmit each item under AF 3000, Material Approval Submittal form. Identify contract number, project number, and Contractor. Identify section and paragraph reference for each item submitted with the AF 3000.
Submit five copies unless otherwise required elsewhere in the specification.
1.1.3 Unless specifically stated otherwise elsewhere in this
specification, each submittal shall be approved by the Contracting Officer prior to incorporation of materials into the work.
1.1.4 Approvals of submittals, which do not conform to the contract, shall not be construed as a change to the contract.
1.1.5 The Contractor shall fill in the "Required Submission Date" on the AF Form 66s with the date he plans on submitting the submittals to the Government. A copy of the AF Form 66, with the required submission date filled in, shall be submitted to the Contracting Officer for use by the contract administrator. Submit in accordance with Section 01300.
1.2 MANUFACTURER'S DATA AND SAMPLES: Where manufacturer's data and samples are required, submit in accordance with procedures identified in 1.1 above.
1.2.1 Manufacturer's Certification: Submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.
1.3 TEST DATA: Test results shall be dated and signed by the agency performing the test.
1.4 MISCELLANEOUS SUBMITTALS: Submittals, which are none of the above types, shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.
01300-2
SUBMITTAL SCHEDULE: The following is a list of required submittals for this Contract and deadlines for their submittal:
SC
H
ED
U
LE
O F
M A
TE
R
IA
LS
S U
B M
IT
TA
LS
P ro je ct N um be r P ro je ct T itl e:
S ol ic ita tio n/ C on tra ct N um be r
R ep ai r H
V A
C B
W H
Q /S er vi ce s
FA
-0
4- D
-0
5-
T
O B
E C
O M
P
LE
TE
D
B Y
P R
O
JE
C T
E N
G
IN
E E
R
B E
C O
M P
LE
TE
D B
Y C
O N
TR
A
C T
A D
M
IN
IS
TR
A
TO
N um be r o f C op ie s
R eq ui re d
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
, C O
N
TR
AC
T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D
AT
E C
O N
TR
AC
TO
R
N O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
AR
K
S
AP
PR
O
VE
D D
IS
AP
PR
O
VE
D
SE
C
TI
O N
/1
.7 .3
EC
O R
D D
R
AW
IN
G
SE
C
TI
O N
/3
.1 1.
G
T O
N N
AG
E
R
EP
O R
T
SE
C
TI
O
N
5/
Q
JV
F
-0
SE
C
TI
O N
/1
.1
LE
TT
ER
SE
C
TI
O N
/1
.5
SU
BM
IS
SI
O N
D
AT
ES
SE
C
TI
O N
/1
.4
FO
M
SE
C
TI
O N
TE
ST
S
SE
C
TI
O N
.6
SH
P D
R
AW
IN
G
S
SE
C
TI
O N
SA
M
PL
ES
SE
C
TI
O N
P D
R
AW
IN
G
01300-3
A F
Fo rm
ED
U
LE
O F
M A
TE
R
IA
LS
S U
B M
IT
TA
LS
P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um be r
R ep ai r H
V A
C B
W H
Q /S er vi ce s
FA
-0
4- D
-0
5-
B
E C
O M
P
LE
TE
D
B Y
P R
O
JE
C T
E N
G
IN
E
B E
C O
M P
LE
TE
D B
Y C
O N
TR
A
C T
A D
M
IN
IS
TR
A be r o f C op ie s
R eq ui re d
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
, C O
N
TR
AC
T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D
AT
E C
O N
TR
AC
TO
R
N O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
AR
K
S
AP
PR
O
VE
D D
IS
AP
PR
O
VE
D
Q
JV
F
-0
SE
C
TI
O N
IT
TA
LS
SE
C
TI
O N
IT
TA
LS
SE
C
TI
O
N
5/
SE
C
TI
O
N
/1 .2
IT
TA
LS
SE
C
TI
O N
/1
M A
-3
SE
C
TI
O N
/1
M
C
SE
C
TI
O N
/1
PR
D U
C T
D
AT
A
SE
C
TI
O N
/1
D
A
SH
EE
TS
SE
C
TI
O N
/1
O
R D
D O
C U
M
EN
TS
SE
C
TI
O N
IT
TA
LS
01300-4
A F
Fo rm
ED
U
LE
O F
M A
TE
R
IA
LS
S U
B M
IT
TA
LS
P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um be r
R ep ai r H
V A
C B
W H
Q /S er vi ce s
FA
-0
4- D
-0
5-
B
E C
O M
P
LE
TE
D
B Y
P R
O
JE
C T
E N
G
IN
E
B E
C O
M P
LE
TE
D B
Y C
O N
TR
A
C T
A D
M
IN
IS
TR
A be r o f C op ie s
R eq ui re d
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
, C O
N
TR
AC
T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D
AT
E C
O N
TR
AC
TO
R
N O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
AR
K
S
AP
PR
O
VE
D D
IS
AP
PR
O
VE
D
Q
JV
F
-0
SE
C
TI
O N
W
AR
R
AN
TY
SE
C
TI
O N
/1
4.
M
M
AN
U
AL
SE
C
TI
O
N
0/
SE
C
TI
O N
/1
5.
BA
LA
N C
E
VA
LV
ES
SE
C
TI
O N
/1
5.
PU
PS
SE
C
TI
O N
/1
.9
TA
K
SE
C
TI
O N
/1
.5
EA
T
PU
M P
C
TI
O N
/1
IG
PA
C
TI
O N
/1
ER
C
TI
O N
/1
AW
IN
G
01300-5
A F
Fo rm
ED
U
LE
O F
M A
TE
R
IA
LS
S U
B M
IT
TA
LS
P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um be r
R ep ai r H
V A
C B
W H
Q /S er vi ce s
FA
-0
4- D
-0
5-
B
E C
O M
P
LE
TE
D
B Y
P R
O
JE
C T
E N
G
IN
E
B E
C O
M P
LE
TE
D B
Y C
O N
TR
A
C T
A D
M
IN
IS
TR
A be r o f C op ie s
R eq ui re d
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
, C O
N
TR
AC
T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D
AT
E C
O N
TR
AC
TO
R
N O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
AR
K
S
AP
PR
O
VE
D D
IS
AP
PR
O
VE
D
Q
JV
F
-0
SE
C
TI
O N
/1
O
SE
C
TI
O N
/1
EP
O
R T
SE
C
TI
O
N
0/
SE
C
TI
O N
/1
2.
IF
FU
SE
R S
SE
C
TI
O N
/1
LO
U
VE
R S
SE
C
TI
O N
/1
ER
V
SE
C
TI
O N
/1
.9
IL
C
TI
O N
EM
AT
IC
C
TI
O N
/1
D
U C
T D
AT
A
C
TI
O N
/1
M
M
AN
U
AL
S
01300-6
A F
Fo rm
ED
U
LE
O F
M A
TE
R
IA
LS
S U
B M
IT
TA
LS
P ro je ct N um be r P ro je ct T ic ita tio n/ C on tra ct N um be r
R ep ai r H
V A
C B
W H
Q /S er vi ce s
FA
-0
4- D
-0
5-
B
E C
O M
P
LE
TE
D
B Y
P R
O
JE
C T
E N
G
IN
E
B E
C O
M P
LE
TE
D B
Y C
O N
TR
A
C T
A D
M
IN
IS
TR
A be r o f C op ie s
R eq ui re d
IT
EM
O R
D
ES
C R
IP
TI
O N
O F
IT
EM
, C O
N
TR
AC
T
R
EF
ER
EN
C E, T
YP
E O
F
SU
B M
IT
TA
L
CERTIFICATION OF
COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S
RECOMMENDATIONS
MANUFACTURER'S
WARRANTY
CATALOG DATA
OPERATING
INSTRUCTIONS
TESTS
OTHER
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE
SUBMITTAL NUMBERS
D
AT
E C
O N
TR
AC
TO
R
N O
TI
FI
ED
CONTRACTOR
RESUBMITTAL
FINAL APPROVAL
R
EM
AR
K
S
AP
PR
O
VE
D D
IS
AP
PR
O
VE
D
Q
JV
F
-0
SE
C
TI
O N
/3
S
SE
C
TI
O N
TO
R S
TA
R
TE
R
S
SE
C
TI
O
N
0/
SE
C
TI
O N
IS
C
O N
N
EC
TS
SE
C
TI
O N
FU
S
SE
C
TI
O N
PA
EL
BO
AR
D S
SE
C
TI
O N
/1
D
U C
T D
A
SE
C
TI
O N
/3
01300-7
END OF SECTION
A F
Fo rm
01400-1
SECTION 01400
QUALITY CONTROL
1.1.1 General Quality Control.
1.1.2 Workmanship.
1.1.3 Manufacturers' Instructions.
1.1.4 Manufacturers' Certificates.
1.1.5 Mockups.
1.1.6 Manufacturers' Field Services.
1.1.7 Testing Laboratory Services.
1.2 RELATED REQUIREMENTS:
1.2.1 Section 01300 - Submittals: Submittal of Manufacturers' Instructions.
1.2.2 Section 02221: Tests required for earthwork.
1.3 QUALITY CONTROL: Maintain quality control over suppliers, manufac-turers, products, services, site conditions, and workmanship, to produce work of specified quality.
1.4 WORKMANSHIP:
1.4.1 Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
1.4.2 Perform work by persons qualified to produce workmanship of specified quality.
1.4.3 Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.
01400-2
1.5 MANUFACTURERS' INSTRUCTIONS: Comply with instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from the Contracting Officer before proceeding.
1.6 MANUFACTURERS' CERTIFICATES: When required by individual
Specifications Section, submit manufacturer's certificate (five copies) that products meet or exceed specified requirements.
1.7 MANUFACTURERS' FIELD SERVICES:
1.7.1 When specified in respective Specification Sections, require supplier to provide qualified personnel to observe field conditions, conditions of surfaces and installation, quality of workmanship, and start-up of equipment, as applicable, and to make appropriate recommendations.
1.7.2 Representative shall submit written report to the Contracting Officer, listing observations and recommendations.
1.8 TESTING LABORATORY SERVICES:
1.8.1 Contractor shall employ and pay for services of an Independent Testing Laboratory to perform inspections, tests, and other services required by individual Specification Sections.
1.8.2 Services will be performed in accordance with requirements of governing authorities and with specified standards.
1.8.3 Reports will be submitted to Contracting Officer in duplicate giving observations and results of tests, indicating compliance or non-compliance with specified standards and with Contract Documents.
1.8.4 Contractor shall cooperate with Testing Laboratory personnel;
furnish tools, samples of materials, design mix, equipment, storage, and assistance as requested.
1.8.4.1 Notify Contracting Officer and Testing Laboratory
24 hours prior to expected time for operations requiring testing services.
1.8.4.2 Make arrangements with Testing Laboratory and pay for additional samples and tests for Contractor's convenience.
2. PRODUCTS: Not Used.
01430-1
SECTION 01430
ENVIRONMENTAL PROTECTION
1.1 The Contractor shall perform all work in such manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. The Contractor shall be responsible for implementing the terms and requirements of NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM
CONSTRUCTION SITES.
1.2 IMPLEMENTATION: Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall:
1.2.1 Detail his proposal for implementing the requirements for environmental pollution control specified herein.
1.2.2 Meeting: Meet with representatives of the Contracting Officer to review and alter his proposal as needed for compliance with the environmental pollution control program.
2. PRODUCTS: (Not Used)
3. EXECUTION:
3.1 PRECONSTRUCTION SURVEY: Prior to start of any on-site construction activities, the Contractor and the Contracting Officer shall make a joint condition survey after which the Contractor shall prepare a brief report indicating on a layout plan the condition of trees, shrubs and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access route as applicable. This report will be signed by both the Contracting Officer and Contractor upon mutual agreement as to its accuracy and completeness.
3.2 PROTECTION OF LAND AREAS: Except for work areas, storage areas, or access routes specifically assigned for the use of the Contractor under this contract, the land areas outside the limits of permanent work performed under this contract shall be preserved in their present condition. The Contractor shall confine his construction activities to areas defined for work on the plans or specifically assigned for his use. Storage and related areas and access routes required temporarily by the Contractor in the performance of the work will be assigned by the Contracting Officer.
01430-2
3.3 PROTECTION OF TREES AND SHRUBS: Except for trees or shrubs marked on the plans to be removed, the Contractor shall not deface, injure or destroy trees or shrubs, nor remove or cut them without special authority. No ropes, cables, or guys shall be fastened to or attached to any existing nearby trees for anchorage.
3.3.1 Tree Protective Structures: Where, in the opinion of the Contracting Officer, trees may possibly be defaced, bruised, injured, or otherwise damaged by the Contractor's equipment or by his other operations, he may direct the Contractor to provide temporary protection of such trees by placing boards, planks, or poles around them.
3.3.2 Restoration of Damaged Trees: Any tree scarred or damaged by the Contractor's equipment or operations shall be restored as nearly as possible to its original condition at the Contractor's expense. All scars made on trees not designated on the plans to be removed by construction operations shall be coated as soon as possible with an approved tree wound dressing. Trees that are to remain, either within or outside established clearing limits, that are damaged by the Contractor so as to be beyond saving in the opinion of the Contracting Officer shall be immediately removed, if so directed, and replaced with a nursery-grown tree of the same species and size.
3.4. PROTECTION OF WATER RESOURCES: The Contractor shall control the disposal of fuels, oils, bitumens, calcium chloride, acids or harmful materials, both on and off the Government premises and shall comply with applicable Federal, State, County and Municipal laws concerning pollution of rivers, streams, and wetlands while performing work under this contract.
Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters. Water used in on-site material processing, concrete curing, foundation and concrete cleanup, and other waste waters shall not be allowed to reenter a stream if an increase in the turbidity of the stream could result therefrom.
3.4.1 Disposal of Water generated during construction dewatering.
3.4.1.1 Dewatering of Groundwater: For temporary dewatering
of groundwater encountered during construction, the Contractor shall land apply all water generated at the locations indicated on drawings in accordance with Paragraph: LAND APPLICATION or surface discharge all generated water in accordance with Paragraph: SURFACE DISCHARGE.
3.4.2 Criteria For Disposal: Prior to dewatering, hydrostatic testing, disinfecting or flushing of lines, the Contractor shall submit a disposal plan detailing the method of disposal for approval. The disposal plan for Land Application shall include a sketch showing the construction site
01430-3 and the proposed location of the disposal of generated water. The disposal plan for Land Application shall also include a description of the equipment that will be used for the removal of water and a description of filtration methods to be implemented as needed. In addition, the date the discharge will begin, then of duration of discharge, and the rate of discharge shall be provided. If the method of disposal is Surface Discharge requiring a state issued permit, the documentation required for the application and issued permit will suffice as the disposal plan. For Sanitary Sewer discharge the disposal plan shall include the rate and location of discharge into the sewer.
3.4.2.1 Land Application: Land Application shall follow
State requirements, however no permit will be necessary. "Land application" implies that the Contractor shall discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, defined drainage areas, or discharge into the "waters of the State" shall occur. The Contractor shall contact the State of North Dakota, Division of Water Quality, Water Quality and Permit Program to discuss the water quality parameters for chemical contaminants (such as chlorine), oil, grease and total suspended solids and shall ensure that all water intended for land application will meet the State requirements.
3.4.2.2 Surface Discharge: Surface discharge shall be in
accordance with North Dakota's National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Dewatering and/or Hydrostatic Testing #NDG-070000. "Surface discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, creeks, or "waters of the State" and require a discharge permit. The State of North Dakota requires a minimum of 30 days to process the permit application. Prior to dewatering, the Contractor shall submit a copy of the completed application form, a copy of the North Dakota NPDES General Permit for Construction Dewatering and /or Hydrostatic Testing #NDG-070000 issued by the State of North Dakota for this contract any subsequent reports and/or information required by the permit or State.
3.5 WASTE DISPOSAL: As part of his proposed implementation under paragraph 1.2, and prior to on-site construction, the Contractor shall submit a description of his scheme for handling and disposing of all waste resulting from the work under this contract. If any waste is dumped in unauthorized areas, the Contractor shall remove the waste and restore the area to the condition of the adjacent undisturbed areas. Where directed, soil which is contaminated by the Contractor shall be excavated, disposed of as approved by the Contracting Officer, and replaced with suitable fill material, all at the expense of the Contractor.
3.6 BURNING: Burning shall be prohibited on the Government premises.
01430-4
3.7 DUST CONTROL: The Contractor shall maintain all excavations, embankments, stockpiles, access roads, plant sites, waste areas, borrow areas, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance. Temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
3.8 EROSION AND SEDIMENT CONTROL: The Contractor shall be responsible for providing erosion and sediment control measures in accordance with local, state, and federal regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that local, state, and federal water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be held to a minimum. For areas subject to erosion including, but not limited to, steep slopes, soils spreading areas, and stockpile areas, the Contractor shall disturb as little vegetation as possible, minimize the period of time that the soil is exposed, prevent surface water runoff from flowing across disturbed areas, stabilize disturbed soils as soon as possible, and provide adequate drainage for the increased runoff. Sedimentation/erosion control features may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Runoff management practices should be employed in areas where the potential for storm water contamination exists that can not be addressed by a prevention or source reduction measure. Runoff management procedures may include vegetative swales, reuse of collected storm water, infiltration devices, and detention/sedimentation basins. Any erosion and sediment control measures which are damaged or found to be ineffective shall be remedied by the Contractor at no additional cost to the Government. Any areas damaged by erosion shall be repaired by the Contractor at no additional cost to the Government.
3.9 CORRECTIVE ACTION: The Contractor shall, upon receipt of a notice in writing of any noncompliance with the foregoing provisions, take immediate corrective action. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs of damages by the Contractor unless it was latter determined that the Contractor was in compliance.
3.10 POST-CONSTRUCTION CLEANUP OR OBLITERATION: The Contractor shall, unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste
01430-5 materials, and other vestiges of construction prior to final acceptance of the work. The disturbed areas shall be graded and filled and the entire area seeded.
3.11 SPILL PREVENTION AND RESPONSE PLAN: The Contractor shall include a Spill Prevention and Response Plan in the Implementation Proposal. The plan shall describe the Contractor's procedures for preventing and responding to spills of hazardous materials.
3.12 ARCHEOLOGICAL PRESERVATION: Should the Contractor uncover any skeletons, artifacts or other archeological remains during the course of excavation, the work shall be stopped and the Contracting Officer notified immediately.
3.13 NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM
CONSTRUCTION SITES:
3.13.1 Notice of Intent: The Contractor shall complete and submit a Notice of Intent (NOI) in accordance with the NDPDES general permit. A copy of the submitted Notice of Intent and Notice of Acceptance (NOA) shall be furnished to the Contracting Officer at least 2 days prior to the commencement of construction activities.
3.13.2 Storm Water Pollution Prevention Plan: The Contractor shall prepare, submit and implement a Storm Water Pollution Prevention Plan in accordance with the NDPDES general permit. Any temporary or permanent erosion and sedimentation control measures shown on the drawings shall be incorporated into the Contractor's Storm Water Pollution Prevention Plan. A copy of the Storm Water Pollution Prevention Plan shall be submitted to the Contracting Officer at least 2 days prior to the commencement of construction activities.
3.13.3 Inspections and Reporting: The Contractor shall be
responsible for all inspections and reporting required under the NDPDES general permit. Copies of each Inspection Report Form shall be furnished to the Contracting Officer.
3.13.4 Retention of Records: The Contractor shall retain copies of the storm water pollution prevention plan and all reports in accordance with the NDPDES general permit.
3.13.5 Notice of Termination: The Contractor shall complete and submit a Notice of Termination (NOT) in accordance with the NDPDES general permit. A copy of the submitted Notice of Termination shall be furnished to the Contracting Officer.
01430-6
3.13.6 Renotification: If the current NDPDES general permit
expires prior to completion of construction, the Contractor shall request to retain coverage under a renewal of the permit in writing to the State at least 15 days prior to the expiration date of the permit. Upon request by the State, a new NOI shall be submitted. The Contractor shall provide certification to the State that the SWPP plan is accurate. The certification shall be submitted within 90 days after the coverage under the permit begins.
A copy of all submissions to the State shall be furnished to the Contracting Officer.
3.14 ENVIRONMENTAL REQUIREMENTS FOR HAZARDOUS MATERIAL AND HAZARDOUS
WASTE: This section specifies requirements/procedures for hazardous material authorization/use, hazardous waste management, spill procedures, and reporting.
3.14 1 Hazardous Materials (HM): This contract may require the Contractor to procure and use hazardous materials. HM is products and chemicals that pose a risk to human health and the environment. HM may be flammable, combustible, toxic or corrosive. HM will be tracked from the time it is brought on base until it has been dispositioned into one of four possible conditions: completely consumed, turned in to a recycler, removed from the base for reuse, or turned in as hazardous waste. Strict adherence to Government regulations concerning the use of HM must be observed. Additional USAF requirements exist for the procurement, storage, usage, and disposal of HM. The Contractor is expected to be familiar with and comply with applicable regulations. The following sections outline USAF requirements for procurement, usage, storage, and disposal, but are not complete with respect to Contractor obligations for worker safety. These environmental requirements are not intended to describe all OSHA requirements.
3.14.1.1 Selection of Materials: Environmentally friendly
materials are preferred when possible. Environmentally friendly chemicals do not contain metals such as lead, chromium, cadmium, barium, arsenic, mercury, selenium, or silver. Environmentally friendly chemicals do not contain flammable solvents such as Methyl Ethyl Ketone, Acetone, Xylene, or Toluene.
Chemicals that contain metals or flammable solvents will generate hazardous waste (HW) when the HM is no longer usable. Brushes, rollers, and other painting applicators that come in contact with hazardous characteristic material will also become hazardous waste when no longer usable. Mineral spirit, turpene, and oil based paints are acceptable; however, the resulting thinners/solvents might be flammable and may result in HW. Therefore, these must be handled and disposed as HW in accordance with federal regulations. In most cases, non-flammable or water-based products are non-hazardous and are the preferred type of product. When selecting a product for a given application, consider performance as a major factor when making a selection, 01430-7 but strike a balance between environmental impact and performance of the product. Environmentally friendly material should not result in poor deliverables.
3.14.1.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .