Attachment 5 Technical Acceptance Criteria.doc

DOC document 29 KB Posted

Attached to
RECOVERY--QJVF070079- Repair Electrical Feeder - Dorms
Solicitation number
FA4528-09-R-0011
Issued by

About this file

Attachment 5 Technical Acceptability

View the file

Other files

File Type Posted
07-0079 T-1 24 X 36 —
07-0079 E-2 24 X 36 —
07-0079 E-6 24 x 36 —
P0001.doc DOC document
07-0079 E-3 24X36 —
07-0079 E-7 24X36 —
07-0079 E-1 24 X 36 —
07-0079 E-4 24X36 —
07-0079 E-8 24 X 36 —
07-0079 E-5 24 X 36 —
E-7.cal —
Specifications.pdf PDF
E-5.cal —
E-4.cal —
E-8.cal —
E-3.cal —
Solicitation.doc DOC document
T-1.cal —
ATTACHMENT 4 RESPONSIBILITY.doc DOC document
E-1.cal —
General Wages ND15.doc DOC document
E-6.cal —
E-2.cal —
CALS.SVD SVD file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4528-09-R-0011

ATTACHMENT 5

Technical Acceptance Criteria

Note: The information obtained in this attachment will be used in the technical evaluation of your proposal. Complete and submit this attachment with your proposal.

I. Is your firm actively engaged as a contractor performing commercial building construction as defined by North American Industry Classification System Code (NAICS CODE) 238210?

_______________Yes ________________No

II. List a minimum of two (2) projects of similar size and nature, which your firm has successfully completed within the last five - (5) years. Include:

Name of Project Work Location Contract Amt.

Owner / Phone No. of Contact

1)

2)

3)

4)

5)

NOTE: Offeror is afforded the opportunity to provide information on problems, which may have been encountered, on the identified contracts, and describe any corrective actions taken by them to remedy these problems. This information will be used in evaluation.

File details come from the government source that posted it. Updated .