Attch 5- Questions and Answers.pdf
PDF 79 KB Posted
- Attached to
- Frequency Converter Maintenance Service Federal contract opportunity
- Solicitation number
- FA449723Q0035
About this file
This document provides answers to questions about Solicitation FA4497-23-Q-0035 for Frequency Converter Maintenance Service. The solicitation requires annual preventative maintenance inspections for four frequency converters from various manufacturers, including ITW GSE, Piller, FCX Systems, and Hobart Power Master. One frequency converter currently has a broken circuit breaker and emergency stop switch requiring remedial maintenance. An electrical license is not strictly necessary but a general license demonstrating capability to operate and repair the equipment is sufficient. Inspections are required annually during preventative maintenance as well as whenever remedial maintenance is needed to repair equipment malfunctions outside the preventative maintenance schedule. Load banking during preventative maintenance is only necessary if required by the original equipment manufacturer's specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Updated Combined Synopsis_Solicitation for Frequency Converter.pdf | ||
| Attch 4- Wage Determination.pdf | ||
| Attch 2- Pricing Sheet.pdf | ||
| Attch 3- Clauses and Provisions.pdf | ||
| Attch 2- Pricing Sheet.pdf | ||
| Attch 4 - Wage Determinations.pdf | ||
| Attch 3- Clauses and Provisions.pdf | ||
| Combined Synopsis for Frequency Converter.pdf | ||
| Attch 1-PWS Frequency Converter Maintenance Service.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FA4497-23-Q-0035 FREQUENCY CONVERTER MAINTENANCE SERVICE
QUESTIONS AND ANSWERS
1. Can the government provide the model numbers for the Frequency Converters so we can pull up the specific PM requirements per the manufacturer?
Model Numbers of the Frequency Converters are as follows:
FC-400-90-1-90 (ITW GSE)
AJS C8-1-R-90-400/200-5/40-G-B (Piller)
FCX PFC072-V-40-FM-12P-2 (FCX Systems)
3GWF–200/260-N (Hobart Power Master 2300) *We have 3 of these*
2. Is the government aware of any Remedial Maintenance or repairs needed once the contract is awarded on any of the Frequency Converters? We are not looking for in depth detail, just to be aware that 1 is not working at the moment, etc.
Yes. One of the Frequency converters currently has a broken circuit breaker and emergency stop switch.
3. Is possession of electrical license truly required?
The Requirement Owner (RO) is unaware of the specific categories pertaining to electrician licenses however a general license that showcases the contractor’s capability operate and fix the Frequency Converters would be sufficient for what is being required.
4. Number of inspections per year.
The Frequency Converters will require an annual inspection as part of its Annual Preventative Maintenance. However, an inspection is REQUIRED any time a REMEDIAL MAINTENANCE (RM) is needed. RM is only needed if the system malfunctions outside the PM schedule and the RO needs the equipment fixed before the scheduled PM. Per Para 1.4.1 RM Procedures (B) An inspection is required so the contractor can assess the malfunctioning equipment and to also help the contractor to produce the proper quote for its repair.
5. Load banking during PM.
Load banking is only required if it is included in the OEM specifications for the PM. Load banking is only needed when conducting the remedial maintenance.