SOW_-_B479_Renovation,_Revision_8_(11_Oct_19).pdf

PDF 343 KB Posted

Attached to
Repair Finishes & Flooring Consolidated Club B479
Solicitation number
FA449720R0002
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Wage_Determination_(26_July_2019).pdf PDF
Attachment_1a_B479_Office_PA_Walls.pdf PDF
Attachment_1_Floorplan.pdf PDF
Solicitation_-_FA449720R0002.pdf PDF
Cost_Breakdown.xlsx XLSX spreadsheet
Attachment_2_Carpet_Program_Ordering_Procedures.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Repair Finishes and Flooring in NAF Portion of Consolidated Club B479

PROJECT NUMBER 1055011

11 October 2019

Revision 8

Table of Contents

PART I – PROJECT SPECIFIC GUIDANCE

1. SCOPE

2. POINTS OF CONTACT

3. GOVERNMENT-FURNISHED ITEMS

4. HAZARDOUS MATERIALS AND HAZARDOUS WASTE ACTIVITIES REQUIREMENTS

PART II – GENERIC REQUIREMENTS

1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS

2. DESIGN REQUIREMENTS

3. CONSTRUCTION REQUIREMENTS

4. CONTRACT ADMINISTRATION

5. SECURITY

6. TABLE OF DELIVERABLES

PART I – PROJECT SPECIFIC GUIDANCE

1. SCOPE

A. OBJECTIVE- The Contractor shall provide all design, labor, materials, tools, and equipment to provide various repairs within the non-appropriated fund (NAF) portion of Dover's Consolidated Club to include replacing/cleaning floors, repainting walls, replacing ceiling tiles and construction of new partition wall to enclose public announcement (PA) system equipment.

B. LIMITATIONS

1. The user will vacate areas of the facility where work is to be performed. Other areas of the facility will remain occupied.

2. The Kitchen floor shall be completed in 2 phases allowing 1 week between phases for the user to move equipment.

C. LOCATION- Location of work is at Building 479, Dover Air Force Base located in Kent County the city of Dover Delaware.

D. MAIN KITCHEN

1. Patch and float concrete floor as necessary to replace broken tile. Replace approximately

50 square feet of broken/missing quarry tile. Clean and refinish all floor tile to restore the tile and grout to a like new condition. Clean and prep the entire surface and etch the grout, install a protective grout coating over the existing grout, and install a protective surface shield over the entire surface. The Kitchen is to be done in two phases.

2. Correct overloaded circuit in the Kitchen serving two double-stacked ovens such that both sets may be operated at the same time.

E. BAR KITCHEN

1. Clean and refinish all floor tile. The same process as outlined in D.1.above is to be utilized on the bar kitchen floor tile. Clean and paint the steel grease trap lid to reasonably match the floor tile.

2. Replace existing double acting swing doors with new. Install stainless steel half base plate.

Door finish shall match adjacent doors with laminate finish. Replacement doors shall have a flush finish and shall be, commercial grade manufactured dual acting swing doors.

F. WAREHOUSE

1. Remove existing floor paint and apply new epoxy floor coating throughout (to include the exposed center section of the laundry room). All washer/dry appliances shall remain in place.

2. Provide two ea. 20 ft. long exterior grade storage container as part of the contract to store shelving and other items located in the kitchen warehouse. The user will move the shelving and other items into the exterior grade storage container and back into the warehouse at the completion of the epoxy coating application

G. HALLWAY TO KITCHEN

1. Demo existing Vinyl Composite Tile (VCT) and Vinyl Cove Base (VCB)

2. Install new VCT and VCB. The new VCB shall have a 6” height profile. Any associated floor prep shall be included.

H. DINING ROOM

1. Demo approximately 1550 square feet of existing carpet and associated vinyl cove base.

2. Install new broadloom carpet. Install new VCB to match existing toeless style base. NOTE:

The new carpet shall be purchased from one of the four approved carpet vendors listed in

Attachment 2. Carpet selections with a linear pattern shall be installed so that the pattern is parallel with the length of the dining room. This may require increasing the total required square foot quantity due to additional waste.

3. Paint lower wall (wainscot) up to and including the chair rail molding

4. Remove recessed fire extinguisher box. Patch and paint wall to match adjacent walls (see item K below).

5. Replace three outlet wall covers along upper wall, with blank cover plate. This work shall be performed after receptacle devices have been removed. (paragraph I.3. below)

I. DINING ROOM STORAGE

1. Demo existing surface mounted electrical components (junction boxes, outlets, light fixtures, and three outlet feeds) located through and along upper section of wall. Demo circuits back to the electrical panel K-3, breaker 17 A, B. Include circuit breaker then cap the panel where the breaker was removed.

2. Repair and patch walls where electrical demo and wire removal was performed. Paint patches to match existing walls.

3. Install blank cover plate over hole in southeast wall where metal-clad cable will be removed.

J. OFFICES

1. Construct two-sided “L-Shaped” partition to conceal the PA system rack. The partition wall shall be no higher than 6 ft. tall, and shall include a 3 ft. wide door. Door shall include a lockset with interchangeable core, hinges, and a floor mounted doorstop. The walls shall be painted to match existing room finish.

2. Paint all walls and trim in area identified on the drawing as offices, to include smaller corner office. Paint shall match the existing color. Paint all office walls Attachment 1.

3. Clean Existing suspended ceiling grid. Replace all dissimilar and damaged ceiling tile to match the existing light grey/platinum colored acoustical ceiling tile. Supply two boxes of replacement ceiling tile.

K. REMOVE FOUR FIRE EXTINGUISHER BOXES- Remove existing wall mounted fire extinguisher cabinets at four locations (see drawing). Patch wall and paint to match existing color.

Terminate paint at nearest transition point.

2. POINTS OF CONTACT- POC(s) will be provided at the time of contract award.

3. GOVERNMENT-FURNISHED ITEMS

A. INFORMATION – The Government may provide information in the form of available plans, reports, maps, and drawings as necessary to facilitate accomplishment of the work required in this Statement of Work. The Government will furnish electronic copies of available As- Built drawings that are pertinent to the facility involved upon request after contract award. However, these drawings are not warranted to show conditions as they actually exist. The designer shall field verify the information shown on the As-Built drawings as necessary to produce a quality-designed project.

B. EQUIPMENT – None provided.

C. MATERIAL – None provided.

D. PROPERTY – None provided.

4. HAZARDOUS MATERIALS AND HAZARDOUS WASTE ACTIVITIES

REQUIREMENTS

A. To the extent required by other sections of this Statement of Work, the Contractor shall sample, test, remove, and dispose, all hazardous material and hazardous waste debris generated in the course of the work in accordance with applicable Federal, State, Local and these contract requirements. All hazardous materials utilized and waste generated by the Contractor shall be handled in accordance with applicable Federal, State, Local and these contract requirements. The Contractor shall provide all hazardous materials use and hazardous waste disposal documentation to the Base Civil Engineer, and shall register with the Hazardous Materials Pharmacy program (if available) at the installation to ensure appropriate and efficient tracking of the Contractor’s hazardous material purchases, inventories, use, and releases such as required by the Emergency Planning and Community Right-to-Know Act (EPCRA), EOs, or any installation reporting requirements. The Contractor shall also comply with Federal, State, and Local requirements for any task involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage, and/or disposal facilities. This includes 40 CFR 260, 49 CFR 172, 173, 178, and 179, and all other applicable Federal, State, and Local transportation regulations.

B. For any areas where hazardous materials will be disturbed, the material must be handled in accordance with the requirements of the Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), and the State of Delaware regulations.

There is no requirement to remove hazardous materials prior to demolition activities for this type of building in the State of Delaware, but contractors need to be made aware of the possible existence of hazardous materials so their workers and the environment can be adequately protected. Regulations established by OSHA must be adhered to during work which involves building components containing hazardous materials in detectable amounts. Employers are required to use engineering controls and special work practices to reduce worker exposure at or below the permissible exposure level (PEL). It also triggers several requirements regarding exposure monitoring, biological monitoring, and employee training when a worker is exposed to airborne levels at or above the PEL. All hazardous materials are to be handled and disposed of as hazardous waste unless toxic characteristic leaching procedure (TCLP) testing is performed and indicates otherwise. Whenever renovation or demolition is performed on painted components, an attempt should be made to control dust. Any component containing hazardous materials in detectable amounts also has the ability to produce hazardous dust when it is disturbed. All costs associated with engineering controls and special work practices are to be included in the contractor’s bid amount in item 0002. If the contractor chooses to remediate paint containing detectable levels of lead below the lead based paint standard of 0.5% by weight it shall be included in the bid amount in item 0002.

C. The facility underwent an extensive abatement for asbestos in 1995 as part of the Alter/Repair

Collocated Club project. Additional screening for Asbestos Containing Material (ACM) has been conducted on the kitchen hallway floor tile and mastic in this facility. No ACM was detected in these samples. There is no reason to believe there is any existing ACM involved in the work. The Contractor should not include costs for sampling and testing for ACM in their proposal. In the event the contractor uncovers suspicious material in the course of performing the work they should contact the Project Manager or Contracting Officer.

D. The facility underwent an extensive abatement for Lead-based paint (LBP) in 1995 as part of the

Alter/Repair Collocated Club project. Additional Screening for LBP has been conducted on the kitchen warehouse floor in this facility. Lead was detected at levels below the EPA/HUDD threshold of 0.5% by weight in these samples. There is no reason to believe there is any existing LBP involved in the work. The Contractor should not include costs for sampling and testing for LBP in their proposal. In the event the contractor uncovers suspicious material in the course of performing the work they should contact the Project Manager or Contracting Officer.

PART II – GENERIC REQUIREMENTS

1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS

A. Department of Defense specifications and criteria located at http://wbdg.org/ffc/dod.

B. Air Force specifications and criteria located at http://wbdg.org/ffc/af-afcec.

C. Dover AFB Installation Facility Standard is located at: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs.

D. Dover Air Force Base specifications listed below are provided as solicitation/contract attachments:

1. Dover Air Force Base Local Design Guide with Appendix D

2. Dover Air Force Base Architectural Compatibility Plan

3. Dover Air Force Base Standard Specifications

4. 01 11 10 Dover Air Force Base General Requirements

5. Dover Air Force Base Environmental Control

6. Operational Climatic Data

7. 31 25 10 Dover Air Force Base Sediment and Erosion Control

2. DESIGN REQUIREMENTS

A. Project Management Plan (PMP) – Due within 14 calendar days after contract award.

B. Pre-Performance Conference – The Contracting Officer or designated representative shall conduct a Pre-Performance Conference at Dover Air Force Base, Delaware. This meeting will involve all stakeholders, allowing the Government and Contractor to discuss a complete overview of the project and any specific concerns. Importantly, a Notice to Proceed (NTP) may be issued at this meeting.

C. 100% Design Submittal – Due within 14 calendar days after Pre-Performance Meeting. To include redlined specifications, complete drawings, and Basis of Design. Design document submissions shall include the following:

1. Table of Contents

2. Executive summary of the scope of all work

3. Minutes and sign-in sheets of all meetings pertaining to the development of the design

4. Previous Government review comments and Contractor responses

5. Design Analysis (Basis of Design) and appropriate engineering calculations

6. Design drawings and specifications

7. Schedule of submittals for material approval.

D. 100% Design Review Meeting – Due 10 calendar days after the 100% Design Submittal.

These meetings will include all relevant Base Points of Contact (POC) and Contracting Personnel on an as needed basis. These meetings will cover the design review comments made on the current design submittal and will include any pertinent issues which could affect future task order progress. The following items shall be covered:

1. Meeting attendees and contact information http://wbdg.org/ffc/dod http://wbdg.org/ffc/af-afcec http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs

2. Review and resolution of design review comments

3. New business

4. Schedule

E. Final “Issued for Construction” Design Submittal – Due within 14 calendar days after 100%

Design Review Meeting. Includes signed and sealed final specifications, drawings, and Basis of Design. Submit all items electronically as well as the following hard copies: 1 full size drawing set, 1 half size drawing sets, 1 copy of specifications, and 1 copy of the Basis of Design. Drawing sets should include updated drawings to reflect changes of any systems that have been altered.

3. CONSTRUCTION REQUIREMENTS

A. In accordance with (IAW) United Facilities Guide Specifications (UFGS) 01 33 00

Submittal Procedures shall govern construction submittals.

B. PERMITS – The Contractor is responsible for all applicable permits, licenses, and certificates required to perform and execute this contract.

C. CONSTRUCTION PROGRESS MEETINGS – The Contractor shall perform Construction

Progress Meetings with meeting minutes provided to construction team Government representatives. These meetings will include all relevant Base POCs and Government representatives on an as needed basis. The following items shall be covered:

1. Meeting Attendees and Contact Information

2. Change Orders

3. Requests for Information

4. Material Submittals and Updated Submittal Register

5. Updated Schedule

6. Progress Made in Past Period

7. Project Issues Affecting Future Work Progress

D. WORKSITE ACTIVITIES AND COORDINATION – The Contractor shall coordinate worksite activities with all applicable personnel to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions.

The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site; preventing damage to property, materials, supplies, and equipment, avoiding work interruptions and complying with Occupational Safety and Health Administration (OSHA) and local safety office requirements. The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner and conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. The Contractor shall maintain documentation supporting training records on site and have written Health and Safety Plans on site and available for workers and/or regulatory review. The Contractor shall provide the Contracting Officer (CO) copies of any OSHA report(s), regarding a project site, submitted during the duration of the contract.

The Contractor shall record and report promptly (within 24 hours) by telephone, facsimile or other direct means to the CO, Contracting Officer Representative (COR), the Base POC, and to the military installation’s Safety Office, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the CO, and immediately report the incident to the Fire Department at 911. If the Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in conducting of the investigation until it is completed.

The Contractor agrees that his personnel and equipment are subject to safety inspections by Government personnel while on federal property.

E. QUALITY CONTROL – In addition to the requirements specified in the FAR clause 52.246-

12--Inspection of Construction, the Contractor shall designate in writing, an individual responsible for managing the Contractor's inspection program. Such designation shall be made to the Contracting Officer prior to commencement of work on the job site.

F. SITE MANAGEMENT

1. The Contractor shall submit for approval a detailed plan drawing showing the layout of the construction site prior to starting work. The drawing shall include the locations of storage trailers, equipment storage and material staging areas, contractor employee parking areas, temporary construction fence including placement of safety signs (i.e.

hard hat area, etc.), and trash dumpsters and containers, as applicable. The submittal shall also include photographs of the site prior to disturbance by the start of work.

2. MATERIALS DISPOSAL – The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the performance of work under this contract. All such materials shall be removed from Dover AFB by the Contractor and disposed of in a State approved permitted landfill. The Contractor shall recycle concrete, untreated wood and other demolition debris. The Contractor is not permitted to deposit any such materials in base trash collection containers or at any on-base location without prior approval of the Contracting Officer. The Contractor is responsible for remediating and/or reimbursing the base for any spills caused by them, their personnel, their subcontractors and/or their equipment. The contractor shall provide their own waste receptacles and dispose of waste in accordance with the requirements set forth in the Dover AFB General Requirements, dated 9 April 2018.

3. SITE RESTORATION – The Contractor shall demobilize facilities as necessary, and restore the site. Except as otherwise required by the contract, all disturbed or damaged landscaping, paved areas, curbs or sidewalks shall be restored to the original condition. This condition will be as documented in the photographs of the undisturbed site submitted with the site layout plan. The Contractor shall implement erosion control measures as applicable such as seeding, mulching, sodding, and erosion control fabrics; restore roads, structures, and utilities; and plant trees, shrubbery, grasses, and other vegetation.

G. ENVIRONMENTAL

1. HAZARDOUS MATERIAL USAGE – If any hazardous material is used, Contractors must submit to the Contracting Office the information and supporting documentation (including Material Safety Data Sheets (MSDSs)) necessary to obtain HAZMAT usage authorization. Report data on HAZMAT used during the performance of the contract at intervals and in the format specified by Dover AFB.

2. AFFIRMATIVE PROCUREMENT – Affirmative Procurement (AP) is the name given to the federal program to strengthen efforts to protect the environment and promote economic growth through the purchase of recycled and other environmentally preferred products. Federal government procurement and use of recycled products, especially re-refined oil, can reduce our nation's dependency on foreign governments for raw materials.

3. RECYCLING OF CONSTRUCTION DEBRIS – The Contractor and Dover AFB representatives shall make every attempt to recycle as much construction debris as possible and within financial reason. The Contractor shall utilize the provided Dover AFB recycling avenues for scrap metal and recycle other recyclable materials through own means.

4. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEM – The Contractor shall perform work under this contract consistent with relevant policy and objectives identified in the Dover AFB environmental management system (EMS) applicable for this contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the Dover AFB EMS and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals.

5. AIR PERMITTING – State of Delaware regulations pertaining to air pollution require the permitting of permanent placed equipment prior to installation. The following items require a construction permit prior to equipment being placed on the construction site:

a. Emergency generators with capacity greater than 450 kilowatts.

b. Boilers supplied by Natural Gas, LP gas, or other desulfurized fuel gas and have a rated heat input of less than 15 million British-Thermal Units (BTUs) per hour.

c. Boilers utilizing any petroleum based fuel with a rated heat input of less than 10 million British-Thermal Units (BTUs) per hour.

d. Project specific equipment identified in the construction documents.

6. HAZARDOUS MATERIALS AND HAZARDOUS WASTE ACTIVITIES

REQUIREMENTS

a. To the extent required by other sections of this Statement of Work, the

Contractor shall sample, test, remove, and dispose all hazardous material and hazardous waste debris generated in the course of the work in accordance with applicable Federal, State, Local and these contract requirements. The Contractor shall provide all hazardous materials use and hazardous waste disposal documentation to the Base Civil Engineer, and shall register with the Hazardous Materials Pharmacy program (if available) at the installation to ensure appropriate and efficient tracking of the Contractor’s hazardous material purchases, inventories, use, and releases such as required by the Emergency Planning and Community Right-to-Know Act (EPCRA), Executive Orders, or any installation reporting requirements. The Contractor shall also comply with Federal, State, and Local requirements for any task involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage, and/or disposal facilities. This includes 40 CFR 260, 49 CFR 172, 173, 178, and 179, and all other applicable Federal, State, and Local transportation regulations.

b. For any areas where hazardous materials will be disturbed, the material must be handled in accordance with the requirements of the Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), and the State of Delaware regulations. There is no requirement to remove hazardous materials prior to demolition activities for this type of building in the State of Delaware, but contractors need to be made aware of the possible existence of hazardous materials so their workers and the environment can be adequately protected. Regulations established by OSHA must be adhered to during work which involves building components containing hazardous materials in detectable amounts. Employers are required to use engineering controls and special work practices to reduce worker exposure at or below the permissible exposure level (PEL). It also triggers several requirements regarding exposure monitoring, biological monitoring, and employee training when a worker is exposed to airborne levels at or above the PEL. All hazardous materials are to be handled and disposed of as hazardous waste unless toxic characteristic leaching procedure (TCLP) testing is performed and indicates otherwise. Whenever renovation or demolition is performed on painted components, an attempt should be made to control dust.

Any component containing hazardous materials in detectable amounts also has the ability to produce hazardous dust when it is disturbed.

c. Asbestos abatement is not an expected requirement for this project. If any potential asbestos containing material is found during construction, cease work immediately and notify the project manager for direction.

d. Lead-based paint (LBP) abatement is not an expected requirement for this project. If any potential LBP is found during construction, cease work immediately and notify the project manager for direction.

5. CONTRACT ADMINISTRATION REQUIREMENTS

A. PROGRESS SCHEDULE, AF FORM 3064 – The Contractor shall prepare and submit, for approval, by the Contracting Officer (CO), a work breakdown structure. The work breakdown structure shall be used to report the cost and schedule status for this project. All tasks required under this type of contract shall be included in the work breakdown structure.

B. PROGRESS REPORTS, AF FORM 3065 – The Contractor shall complete biweekly

Contract Progress Reports throughout the contract period. The work elements and percentages of the total job identified on the AF Form 3065 shall be identical to the work elements and percentages indicated on the AF Form 3064. Each invoice should be based on the most recent approved AF Form 3065 and will be entered through Wide Area Work Flow (WAWF). The AF Form 3064, AF Form 3065, and invoice shall all cover the same period of time.

C. NOTIFICATION REQUIREMENT – The Contractor is required to notify the Contracting

Officer and the Project Manager of critical issues that may affect life, health, safety, contract performance, or the environment. Verbal notification should be made immediately followed by written notification as soon as practical.

D. TRANSMITTAL FORM – The Contractor is required to use AF Form 3000 Material

Approval Submittal as the transmittal form for both design and construction submittals.

E. SUBMITTAL FORMAT – Provide submittals in electronic format, with the exception of material samples required for Submittal Description (SD)-04 Samples items. In addition to the electronic submittal, provide one hard copies of design submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use Portable Document Format (PDF) as the electronic format, unless otherwise specified or directed by the Contracting Officer.

Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature. Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer.

Provide electronic documents over 10MB on an optical disc, or through an electronic file sharing system such as the DOD SAFE Web Application located at the following website:

https://safe.apps.mil/. Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional cost to the Government.

6. INSPECTIONS

A. PRE-FINAL INSPECTION – The Pre-final inspection shall be coordinated by the

Contractor to conduct a detailed inspection to identify construction deficiencies and remaining contractual items (such as systems operating manuals, spare parts lists, as-built drawings and training requirements). The Contractor shall compile the list of deficiencies (punch list) which have been identified before or during the Pre-Final Inspection. A copy of the punch list shall be provided to the BCE, as well as the Contracting Officer.

B. FINAL INSPECTION – The Contractor shall conduct a final inspection with applicable

Government officials.

C. FINAL ACCEPTANCE – This occurs when all punch-list items have been corrected by the Contractor and the Government accepts the work as complete. If there is no follow-on work under another contract, then Final Acceptance would also be the Physical Completion date.

D. WARRANTY – A warranty shall be issued in accordance with FAR 52.246.21 (Warranty of Construction). A standard one-year warranty shall be issued for all work.

7. SECURITY

A. SECURITY INSTRUCTIONS: All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Installation shall abide by all security instructions and directives of Dover Air Force Base.

1. At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and windows secured.

2. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the Installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Investigation (CBI).

3. Contractors shall ensure their employees and those of their subcontracts have the https://safe.amrdec.army.mil/safe/ proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented workers will be remanded to the proper authorities.

4. All contractors and subcontractors when working in a Controlled, Restricted, or other sensitive area must be escorted at all times. The military agency or unit responsible for the project is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

B. CONTRACTOR BADGE POLICIES: All requests for contractor badges will be submitted through the 436th Contracting Squadron (436 CONS) and/or the requesting agencies base point of contact. 436 CONS or base point of contact will then complete an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the 436 SFS Pass and Registrations section for approval in accordance with Operation Plan (OPlan) 31-101. As a minimum the ORM will be submitted 10-days prior to the requested date of employment. At no time will a contractor contact 436 Security Forces Squadron (436 SFS) directly regarding badge denial.

1. All contactor employees requesting unescorted access to the Installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the Installation. Continued employment is contingent upon successful completion and favorable reporting of the CBI.

2. Dover Air Force Base (DAFB) Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to 436 SFS, Pass and Registration for destruction. Prior to reissuing a badge an ORM must be resubmitted to the 436 SFS Pass and Registration section for approval. In the event a badge is lost or stolen, immediately contact the 436 SFS, Pass and Registration office. The badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436 CONS and 436 SFS, Pass and Registration office. A new request for a badge must be completed prior to a new badge being reissued.

3. The 436 CONS or base POC will immediately notify 436 SFS, Pass and Registration when a contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the contractor’s badge to 436 SFS Pass and Registration when this occurs.

C. INSTALLATION ACCESS: The contractor shall obtain a personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto DAFB from 436 SFS, Pass and Registration, for the duration of the contract.

1. Employees are only permitted to enter the Installation during the date and time periods indicated on their contractor badge. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the Installation.

All vehicles entering the DAFB Main Base, Military Family Housing or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.

2. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.

3. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.

4. During Higher FPCONs (Charlie and Delta) the base will normally curtail non-essential operations/functions; access by non-essential Contract operations will be suspended at the direction of the Installation Commander.

5. Department of Defense (DoD) contractors or subcontractors without a Common Access Card (CAC) or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction on the installation should consider completing Anti-Terrorism (AT) Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html IMPORTANT: The standalone course MUST be completed on the computer in which it is started. Course progress is not transferable between computers. The standalone course does provide a completion certificate but will not be tracked on JKO and no record will be maintained. AT Awareness Level I Training should be provided by the requiring unit after contract award or the sponsoring organization.

D. FLIGHTLINE DRIVING: Not applicable to this project.

ATTACHMENTS (3):

1. B479 FLOORPLAN EXTINGUISHER CABINETS

1a. B479 OFFICE PA WALLS

2. CARPET ORDERING PROCEDURE

http://jko.jten.mil/courses/atl1/launch.html

8. TABLE OF DELIVERABLES

TABLE OF DELIVERABLES

Document Title

Copies Per Addressee

Delivery Date C on tr ac tin g

B as e C iv il

E ng in ee r

N ot

U se d

El ec tro ni c

H ar d C op y

El ec tro ni c

H ar d C op y

El ec tro ni c H ar d

C op y

DESIGN

Project Management Plan (PMP) 1 1 Within 14 calendar days after Award. One for entire contract.

Pre-Performance Conference Time, date, and location to be determined after contract award.

Pre-Performance Conference Minutes

1 1 Within 7 calendar days after conference.

100% Design Submittal 1 1 1 Within 14 calendar days after Pre-

Performance Conference. 1 half size set of drawings. 1 set of redlined specs. 1 set of the Basis of Design.

The Government will provide review comments within 14 calendar days of receipt of the 100% Design Submittal.

100% Design Review Meeting Approximately 10 calendar days after the

100% Design Submittal Review

Final “Issued for Construction”, signed and sealed, Design Submittal

1 1 1 Within 14 calendar days after 100% Design Review Meeting. 1 half size set of drawings, 1 full size set of drawings. 1 set of specifications. 1 set of the Basis of Design.

CONSTRUCTION

Construction Progress Meeting Bi-weekly.

Construction Progress Meeting Minutes

1 1 Within 3 working days after each meeting with minutes by Contractor.

Progress Schedule (AF Form 3064)

1 1 Prior to the start of construction activities.

Progress Report (AF Form 3065) 1 1 Bi-weekly, initiated by Contractor with Base Civil Engineer (BCE) inspector support and

TABLE OF DELIVERABLES

Document Title

Copies Per Addressee

Delivery Date C on tr ac tin g

B as e C iv il

E ng in ee r

N ot

U se d

El ec tro ni c

H ar d C op y

El ec tro ni c

H ar d C op y

El ec tro ni c H ar d

C op y sent to BCE and Contracting via email.

Material Submittal Form AF 3000 1 1 1 1 Within 30 calendar days prior to requirement.

“Red Zone” Meetings 1 1 Bi-weekly in conjunction with Progress

Meetings with minutes by Contractor, to track end of project requirements such as punch list, as-built drawings, et cetera. To begin no later than 1 month prior to scheduled construction completion date.

Requests for Information (RFI) 1 1 Same day as issue or occurrence.

Pre-Final Inspection Report Performed by contractor.

Final Inspection Report Performed by contractor.

As-Built Dwgs & Specifications (Digital Scan of Red-Line Dwgs and Final Updated CAD Dwgs)

1 1 1 Within 30 calendar days after Final Inspection.

Final Approved Submittals AF Form 3000

1 Within 30 calendar days after Final Inspection.

O & M Manuals 1 1 1 Within 15 calendar days prior to Commissioning. Prior to required training to allow maintainers time to review.

Commissioning Reports 1 1 Within 30-60 calendar days after commissioning.

Warranties 1 1 Within 15 calendar days after Final Inspection.

Repair Finishes and Flooring in NAF Portion of Consolidated Club B479
PART I – PROJECT SPECIFIC GUIDANCE
1. SCOPE
B. LIMITATIONS
D. MAIN KITCHEN
E. BAR KITCHEN
F. WAREHOUSE
G. HALLWAY TO KITCHEN
H. DINING ROOM
I. DINING ROOM STORAGE
J. OFFICES
3. GOVERNMENT-FURNISHED ITEMS
4. HAZARDOUS MATERIALS AND HAZARDOUS WASTE ACTIVITIES REQUIREMENTS
PART II – GENERIC REQUIREMENTS
2. DESIGN REQUIREMENTS
3. CONSTRUCTION REQUIREMENTS
5. CONTRACT ADMINISTRATION REQUIREMENTS
6. INSPECTIONS
7. SECURITY
8. TABLE OF DELIVERABLES

File details come from the government source that posted it.