Current as of: 3 May 2019

STATEMENT OF WORK

FOR

CRANE RENTAL FOR 436 MXS

The 436 MXS has a facility that was recently damaged due to structure fire, and scheduled to undergoing restoration for an extended period of time. While the hangar is under construction, the bases only overhead hoist will be unavailable for specific aircraft maintenance repairs. A contractor is needed to provide minimal 25 ton crane, with an 85 feet reach, and operator(s) on Dover AFB, Delaware. The crane, and operator(s), must be on site, setup, and ready to preform lifting operations no later than 48 hours of notification.

1. HOURS OF OPERATION. The hours of operations may continue around the clock, may extend over multiple shift, and must continue until the task is complete. The hours of operations, including a one hour lunch, are from 0700-1500, 1500-2300, and 2300-0700 on Monday through Sunday. The contractor may be required to provide service for emergencies on the following days: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

2. SECURITY REQUIREMENTS. In performing any work under this contract on premises which are under the direct control of the Government, the Contractor shall conform to all safety rules and requirements prescribed in Air Force Pamphlet 91-210, Contract Safety and Public Law 91-596, The Occupational Safety and Health Act of 1970. Effective on the date of this contract, the contractor shall take such additional precautions as the Contracting Officer may reasonably require for security, safety, traffic fire, personnel clearances and accident prevention purposes.

The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of the Contractor, Government Property and Government personnel performing or in any way coming in contact with the performance of this contract on such premises. These requirements are additional to and do not replace the standards promulgated by the Department of Labor under the Occupational Safety and Health (OSHA) Act. In the event of a conflict between the OSHA Standards and these requirements, the most stringent shall apply. Any violation of such rules and requirements, unless promptly corrected, as directed by the Contracting Officer, may be considered grounds for termination of this contract in accordance with the default provisions hereof.

3. SECURITY. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB.

Employees are responsible for safeguarding all government property provided for contractor use.

3.1. At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and windows secured.

3.2. The contractor and as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI).

3.3. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States.

Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.

3.4. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause.

Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

3.5. All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

4. SPECIAL QUALIFICATIONS. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in inspection of equipment. Proof of certification must be submitted to the Contracting Officer within 5 working days of signing the contract.

5. RECORDS MANAGEMENT. The contractor understands that when creating, handling and maintaining records for the Air Force, either electronic or paper, you must meet the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Management Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of Records. In order to meet the requirement established IAW the above mentioned regulations contact the Base Records Management Office (436 CS/SCXK, Bldg 310) at 677-3642 for guidance and to schedule records management training.

6. CONTRACTOR BADGE POLICIES. All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the requesting agencies base point of contact. The Contracting Squadron Office or base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW DAFBI 31-101. As a minimum the ORM will be submitted 72hours prior to the requested date of employment.

6.1. All contactor employees who’ll be granted unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the criminal background check.

6.2. Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction. Also before a new badge will be issued an ORM must be resubmitted to the Pass and Registration section for approval again.

In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor.

The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge before a new badge can be reissued.

6.3. Base Contracting Office or base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Office.

7. INSTALLATION ACCESS. The contractor shall obtain personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from Pass and Registration, for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their contractor badge.

7.1. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the installation. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or nonconsent by an employee will result in termination of their base access and immediate confiscation of this access badge.

7.2. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.

During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.

7.3. During Higher FPCONs (Charlie and Delta) the base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended as the direction of the Installation Commander.