Base Paving IDIQ 1 Oct 16
SOLICITATION NO.: FA4497-17-R-0006
CONTRACT NO.:
Attachment 6
MANDATORY VERIFICATION SCHEDULE
PROJECT NUMBER: 141085
The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor's inspection program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification at least four hours prior to the desired verification date unless indicated otherwise below.
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION COMPLETED
Removal of Existing Pavements 02110/1.2 24 hours
Borrow 02610/1.2 24 hours
Graded Aggregate 02600/1.2 24 hours Base Course
Open Graded Aggregate 02600/1.3 24 hours Base Course
Concrete Structures 02622/1.2 48 hours
Cracking and 03200/1.4 24 hours Seating of Nonreinforced Portland Cement Concrete
Hot-Mix, Hot-Laid 03000/1.3.1 48 hours Bituminous Concrete Pavement
Bituminous Tack Coat 03000/1.4 24 hours
Coal-Tar 03060/1.4.1 48 hours Sealer/Rejuvenator
Pipe Bollards 03500/1.3 48 hours
Pavement Markings 02900/3.0 48 hours