FA448425Q0071 - Vendor Questions.pdf

PDF 51 KB Posted

Attached to
Crisis Action Team Theatre Seating Replacement
Solicitation number
FA448425Q0071
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation FA448425Q0071, a Crisi Action Team Seating Replacement project. The solicitation involves replacing 22 Primo standard chairs in a facility, with specific requirements including 5 interconnected rows of seating, black or grey upholstered fabric, and installation on a single-story facility. The project will be a prevailing wage project, with work to be completed during normal business hours (0700-1700) and a desired completion date of 30 December 2025. Additional key details include the need for contractor-provided demolition and disposal of existing chairs, and confirmation that the entire project will take place on the first floor of the facility.

View the file

Other files

File Type Posted
CAT Seating layout.pdf PDF
CAT Seating photo.pdf PDF
Solicitation - FA448425Q0071.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA448425Q0071 – Crisi Action Team Seating Replacement Questions

1. Your spec states 22 Primo standard chairs. Are these to be built in rows and interconnected to each other? If yes how many rows?

A) Yes, 5 rows of interconnected seats (see attached photo)

2. Is the facility all 1st floor or is there a stair carry?

A) The facility is all on the 1st floor.

3. I will need pictures of the existing chairs in order to provide a price for demo and disposal.

A) Photo attached

4. A fabric specification is needed for pricing.

A) Black or Grey Upholstered fabric

5. Can we use our own standard open shop labor or is this a prevailing wage or union project?

A) Prevailing wage is applicable. There will be a wage determination attached to award.

6. Can all work be done during normal daytime hours M-F 6AM-6PM?

A) Work can be done during normal business hours 0700-1700

7. What is the desired date for this work to be completed?

A) 30 December 2025

File details come from the government source that posted it. Updated .