Q A.doc
DOC document 24 KB Posted
- Attached to
- PA System Federal contract opportunity
- Solicitation number
- FA4484-13-T-0029
About this file
Q A for PA System
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clerification_.doc | DOC document | |
| Q A_2.doc | DOC document | |
| FA4484-13-T-0029-0001_-_Amendment.doc | DOC document | |
| FA4484-13-T-0029_-_Diagram.pdf | ||
| FA4484-13-T-0029_-_PA_System_Solicitation.pdf | ||
| Presolicitation_-_PA_System.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A FOR PA SYSTEM
1. Is Bogen the only acceptable solution for the overall PA system?--Not Sure
2. How many discreet paging zones are required?--None
3. Does the system need to be a room by room paging system?--Yes
4. How many simultaneous pages are required by the new paging system?--None
5. Please describe the functionality required at the main office location for the new paging system.--Control of turning on and off of the system.
6. What is the existing make and model phone system?--Several different types
7. Is the existing phone system a VoIP system?--Not sure
8. If the existing phone system is a VoIP system will this system provide the required dedicated analog voice lines over to the new paging system via an Analog Gateway or dedicated Analog interface ports?
9. Will the current service provider for existing phone system be present for phone system programming if required when paging system is ready to be connected to the new paging system?-- Yes
10. Is there any requirement for outdoor paging?-- No
11. Is plenum rated cabling required for the building?--Not Sure
12. Are there currently cable trays above the ceilings in the corridors to run the paging cable in or will J hooks be required for the cable path for the new paging system cable?--Cable Trays in ceiling in hall
A: If there is only 1 zone for paging then any page that is made will be heard out of all 85 speakers with no choice for users to page different zones within the building. Is this correct? -- Yes this is correct.
B: If A is not correct how many zones will be required in the building. -- There will only be one (1) zone
File details come from the government source that posted it. Updated .