FA4484-11-R-9999 Bird Netting Solicitation Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Sep-2011 10:00 AM to 22-Sep-2011 10:00 AM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN extended description has changed from INSTALL BIRD NETTING PROTECTION SYSTEM, BLDG 1751, 1755 AND 1757 AT MCGUIRE AFB, NJ(TWCF FUNDS) to INSTALL BIRD NETTING PROTECTION SYSTEM, BLDG 1751, 1755 AT MCGUIRE AFB, NJ(TWCF FUNDS).

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

STATEMENT OF WORK REV 1

STATEMENT OF WORK

FOR

ALTERATIONS TO BUILDINGS 1751, 1755, and 1757

AT

MCGUIRE AIR FORCE BASE, NEW JERSEY

I. DESCRIPTION OF SERVICES.

A. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to install bird-prevention netting, both inside and outside portions of three (3) buildings, 1751, 1755, and the Freight Terminal, Building 1757. No bird-deterrent materials, other than netting, are included in this Statement of Work.

B. The repairs to these facilities shall include, but may not be limited to: Power washing and sanitizing all areas where bird droppings are found, and installation of ¾-inch mesh bird netting, US Netting Part # Multi use “M”, ¾” x ¾” or approved equal, as directed in this Statement of Work.

C. Bird netting installations to all buildings include support cabling, turnbuckles, plastic ties, zippered access panels under lights or other equipment, and other hardware as required to provide a sturdy, useful, and complete barrier to bird nesting in the aforementioned buildings. Bird netting to be installed below building roof support beams, tie rods, utility lines, lights, rain downspouts, and other equipment as found. However, bird netting is to be installed above suspended lighting fixtures, heaters, roll-up door operating mechanisms, and other devices where feasible and as directed. In addition, bird netting is to be installed in Building 1757 over exterior louvers and vents, as well as all interior horizontal beams on walls in the cargo roller areas.

D. The scope of this project includes Building 1751, 2,800 square feet of netting, Building 1755, 6,900 square feet of netting, and Building 1757, and 43,000 square feet of netting, for a total of 52,700 square feet of bird netting. These measurements are approximate, and bidders are cautioned to make their own measurements. In Building 1757, the bird netting shall be installed below the bottom of beams, above all cargo rollers. Contractor shall ensure that all netting shall terminate not less than two (2’) feet short of the rolling Cargo Mover Trolley’s power raceway, and all netting shall in no way interfere with the Cargo Mover Trolley’s travel.

E. Any adjacent areas dissembled, damaged, or removed by the Contractor during installation shall be properly repaired and reinstalled by the Contractor at no expense to the Government. Any and all debris/ trash generated by this project shall be removed and properly disposed of off-Base by the Contractor. The Contractor or the Contractor Quality Control representative (CQC) shall be on site during duty hours or the hours of work being accomplished. The Contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The Contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes. A site visit of the facility is required.

II. SPECIAL REQUIREMENTS.

A. No tie lines are to be connected to the Cargo Mover Trolley power supply raceway in Building 1757. Netting, which would terminate at a wall, shall be installed continuously down the wall to a distance which will prevent birds from roosting. Adjust all netting in tension to prevent sagging. All lights and equipment above the netting shall have netting access panels installed, large enough to provide lamp-changing or equipment repair access, and fastened with zippers.

B. The netting installation work shall not interfere with ongoing cargo operations. The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.

END OF STATEMENT OF WORK

The following have been deleted:

STATEMENT OF WORK

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 days after the contractor receives the notice to proceed. * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .