SOW Vehicle Exhaust IWIMS 30041 B-687.doc
DOC document 36 KB Posted
- Solicitation number
- FA4484-11-R-0108
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation FA4484-11-R-0108.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
MODIFY VEHICLE EXHAUST SYSTEM BUILDING 687
AT
JOINT BASE MDL, LAKEHURST, NEW JERSEY
DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to install new exhaust system bay #5, manufacturer is Plymo Vent system.
· 1. quantity (1), part no. VSRA-50
· VSRA-50 Vertical stack rail includes: 47.5 feet of Aluminum profile 100 ft. rubber seal.
· 4 PCS. of suspension kits, including 2 brackets, 2 trolleys, 1 centering spring, 2 trolley stops,
· 1-catcher including gate damper, 1-back in connection 06.25”. Hose
· 2. Quantity (1), part no. FBC-6 Stack adapter 6”
· 3. Quantity (1), TRACK PAC , 1-19’ BOXLOC TRACK
· 4. Quantity (1), CAC material, duct, hardware, supports and miscellaneous items required for installation.
· 5. Labor
Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base by the contractor. The contractor or his representative (QAP) shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
A site visit of the facility will be scheduled and Contractor attendance is highly recommended.
SPECIAL REQUIREMENTS. The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.
POINTS OF CONTACT:
Tech POC: Brad Yanchek @ (732) 323- 1018, brad.yanchek@us.af.mil, Building 5 , Joint Base MDL, Lakehurst Contracting POC: Lynn McMiller @ (609) 754-2420, lynn.mcmiller.1@us.af.mil Building 2402, Joint Base MDL, McGuire.
The Contractor Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours, 7:30am to 4:15pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Personnel (QAP) with phone number for contacting purposes.
BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire, Dix, Lakehurst for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located on Rt. 547, Lakehurst, NJ.
SECURITY FORCE AND FIRE PROTECTION: The Base Security Police telephone number is 732-323-4000 and the Base Fire Department telephone number is 911 for reporting a fire.
PERFORMANCE PERIOD: All work shall be completed within a two (2) calendar day period, excluding holidays.
INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: A final inspection will be scheduled upon completion of all work. Contact the Quality Assurance Evaluator two (2) days prior to completion for a site visit.
Work Order #: 30041
PAGE
File details come from the government source that posted it. Updated .