Drawing.pdf

PDF 143 KB Posted

Attached to
Skid Boards (BPA) Federal contract opportunity
Solicitation number
FA4460-23-Q-0289
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains a solicitation for a blanket purchase agreement and technical drawing specifications. The Air Force Air Mobility Command is seeking to establish multiple BPAs for skid boards manufactured according to an attached technical order. Vendors would provide skid boards on an as-needed basis, with estimated quarterly requirements ranging from 400 to 1200 units and a minimum of 480 units per month. Pricing must be entered for a single skid board, and will be used to order quantities under the BPA throughout its term. The maximum allowed for a single order is $50,000 and the contractor's total obligation may not exceed $250,000. Preference will be given to suppliers able to deliver 500 units quarterly with surge flexibility.

View the file

Other files for this federal contract opportunity

Other files attached to Skid Boards (BPA), newest first.
File Type Posted
Questions and answers .pdf PDF
Combo Solicitation.pdf PDF
Provisions and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chapter 8

8-2 TM 4-48.03/ MCRP 4-11.3C/TO 13C7-1-11 15 March 2016

Notes.

This drawing is not drawn to scale.

All dimensions are given in inches.

Use only AC grade plywood for skid boards.

① Place a ¾- or 1- by 48- by 48-inch piece of plywood on a flat surface.

② Drill four ½-inch holes on each side as shown above.

③ Measure 3 inches in from each corner of the skid board and make a diagonal cut.

④ Cut eight 8-foot lengths of ½-inch tubular nylon webbing. Route one length through hole A from the bottom and the other end through hole B from the bottom. Even the ends.

⑤ Repeat step 3 for holes C and D and remaining sides.

Figure 8-1. Locally fabricated skid board prepared for single A-22 load

D

C B A

18 18 2 5 5

File details come from the government source that posted it. Updated .