Solicitation Amendment FA446021Q00030001 SF 30.pdf2.pdf
PDF 184 KB Posted
- Solicitation number
- FA446021Q0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications Washer_Dryer Service Contract final_10Nov2020.pdfpost.pdf | ||
| Solicitation - FA446021Q0003.pdf | ||
| DFARS 2019-D41(i).pdf | ||
| Addendum to 52.212-1.pdf2.pdf | ||
| 15-5117 revision 13.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
1 2
0001 08 Dec 2020
FA4460
FA4460 19 CONS LGC
19 CONS LGC
642 THOMAS AVE
CP 501 987 3303
LITTLE ROCK AFB, AR 72099-4971
UNITED STATES
Bessie White, Email: bessie.white@us.af.mil Telephone: 731-3728
FA446021Q0003
30 Nov 2020
See Section G
See Schedule
Arthur J. Brown III Email: arthur.brown.17@us.af.mil Telephone: 731-3303
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this Amendment is to respond to the questions from the Contractor sent on 12Block 14 (Description of Amendment/Modification):
/8/2020 for the Washer and Dryer solicitation. The solicitation has been not been extended.
Q: Commercial washers and dryers are no longer energy star rated. This program ended in 2017. If you want a frontload washer, it would be energy star compliant; however it would not have adjustable water levels on it.
A: See the two links below. The Energy Star Program is still in effect and the Air Force is required to comply. The first link lists energy star commercial washer and dryers. The second link lists the requirements.
https://www.energystar.gov/index.cfm?c=fed_agencies.fed_ag_required https://www.energystar.gov/productfinder/product/certified-commercial-clothes-washers/results
Q: I don't know of a stack washer and dryer under the brands of Speed Queen, Maytag, Whirlpool, GE or Frigidaire (at least in current production) that would be small enough to fit into the closet area for the stacks. Could you send us the brand and model of stack that is currently in the location?
A: We have two model stackable washer/dryer units. Some of them are Whirlpool Model #LTE5243DQ9 and the others are GE Model
#GUD24ESSJ0WW.
Two side notes.
1: We prefer top loading washers as the chance for leakage is greater with front load if the seal goes bad.
2: I HIGHLY recommend the contractor conduct a sight visit for each facility to see where the washers and dryers will be placed at, ESPECIALLY for building 846. The stackable washer/dryers that will have to go in the closet there do not have much space to play with and the dimensions of the units are critical....too big and they will not fit. This is already stated in the PWS but it is at the very end and I want to ensure the contractor is aware of this to ensure they have a plan to be able to install and connect the units without altering the building i.e. cutting holes in the wall.
1. There is a considerable difference in price between a front load washer and a top load washer. We have been installing top load washers in the last few years at bases to include Lackland AFB, TX and Ft. Sam Houston, TX.
ans. As for top load vs front load, we are more concerned with Energy Star compliance and the three water level selector vs top load and front load. Top load would be preferable and I believe more cost effective as front loaders are more expensive than top load.
1. She also wants to clarify that all dryers are electric and not gas including the stacked washer and dryer combination machines requested ans. All of our dryers are electric as well. The stackable washer/dryers are all electric as well.
The contractor is required to sign and return a copy on 12/11/2020 POC: Bessie White, Email: bessie.white@us.af.mil, Phone 501 987-3728
Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
INFORMATION FROM TO
CIN 00000000000005877006
INFORMATION FROM TO
CIN 00000000000005877007
File details come from the government source that posted it. Updated .