This is the Performance Work Statement for the Small Arm Range

View the file

Other files for this federal contract opportunity

Other files attached to Small Arms Range (CATM), newest first.
File Type Posted
Doc1.pdf PDF
Amendment_for_Pictures.docx DOCX document
solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

CATM HAZARDOUS WASTE DISPOSAL AND RANGE INSPECTION/MAINTENANCE

LITTLE ROCK AIR FORCE BASE, ARKANSAS

20 July 2017

PERFORMANCE WORK STATEMENT

1. DESCRIPTION OF WORK. The following short work description shall serve as general information only, and shall not limit the contractor’s obligation to conform to all state and local regulations in accordance with standard industry practice.

1.1. GENERAL REQUIREMENTS. The contractor shall supply the necessary personnel, labor, materials, supplies, equipment, transportation, packaging, labels, placards, manifests and all other necessities for, or incident to, the performance of work. The contractor shall ensure all units, items and equipment in this statement are brought up to its full operational capability. The range is partially covered and is outside. There are 21 Firing positions for the M4 Range.

1.2. The contractor shall provide the necessary tools and equipment for the maintenance of the M-4 firing range at the Combat Arms Training and Maintenance (CATM) compound, Building 1392, on Little Rock AFB, AR, 72099. The maintenance shall be performed on a quarterly basis (i.e., four consecutive (4) quarters within the 12-month period of performance, plus the durations of the contract). Personnel performing the maintenance shall be fully trained to perform preventative maintenance checks of all equipment associated with the firing range and fully trained to clean hazardous debris and residue. They shall have a working knowledge of how the bullet trap system works, to include the ability to repair the auger, auger motor, Dust Collection Unit (DCU), and associated equipment used to keep the bullet trap operational. Additionally, they shall be required to fix all mechanical issues associated with the bullet trap/auger system. They shall wear the appropriate personal protective equipment (PPE). The contractor shall inspect bullet trap plates, baffle traps, joint strips, deflectors and chambers for wear. The contractor shall test air compressor and air lines for leaks and change oil as needed. Disposal of all removed components are the contractor's responsibility and we encourage recycling if possible. Copies of weight tickets for any items weighing 100 pounds or more recycled will be turned-in to the Contracting Officer’s Representative (COR).

1.2.1. If parts are needed beyond small, common parts (i.e. screws, nuts, bolts, etc.) to ensure continuous operation of the bullet trap system, the contractor shall notify the COR with a written estimate of parts and labor costs within three business days or as soon as practical. No repairs shall be accomplished other than routine preventative maintenance without the approval of the COR.

1.3. The contractor shall provide the appropriate Dust Collection Unit to replace the current one. The work shall include installation of one (1) 15hp Dust Collector Unit, with all required parts, as well as the fittings and plumbing to ensure the unit is up to its operational capacity. The contractor shall include but not limited to the DCU cycler boards, filters, and photohelic gauge. In addition, the electrical installation of the DCU. The work shall include demolition, cleaning and removal of the current DCU from the site.

1.3.1 The contractor shall provide replacement drums to collect residual lead and debris from the bullet trap and dust collection unit and shall ensure the drums meet all Department of Transportation (DOT) requirements for the type and weight of the material collected. The contractor shall test for leaks and functionality of the DCU. The filled drums from the bullet trap and DCU shall be placed on pallets, prior to handling and transporting them to an approved disposal site IAW Occupational Safety Hazards Administration (OSHA) and Environmental Protection Agency (EPA) standards. The contractor shall provide two (2) spare collection barrels at the beginning of each contract year in the event drums attain capacity prior to routine service.

1.4. The contractor shall be responsible for cleaning the range floor, bullet trap and gutter per Appendix A. This shall include removing all debris, casings, and standing water prior to High Efficiency Particulate Air HEPA vacuuming the entire range floor, walls, bullet trap plates, and gutter. If standing water is present, it should be squeegeed within the confines of the range allowing it to air dry. The contractor shall also wet wipe touchable surfaces at the firing line (barricades and all countertops and tables on the range and in the control tower). The contractor shall also clean and replace DCU filters as needed to ensure proper operation of the DCU and supporting equipment. Waste minimization techniques will be used during the cleanup process. Every effort will be made to ensure waste generation is kept to a minimum i.e reuse gear/protective paper as much as possible, ensure no trash gets placed into hazardous waste containers, and use the minimum amounts of materials to get the job done. Prior to the start of any work, the contractor will meet with 2 CES/CEIE personnel to discuss cleaning process and identify waste streams.

1.5. Successful cleaning of the range shall be accomplished after submission of independent third party testing results of cleaning swatch samples taken after vacuuming has been completed at 15 random locations as follows: The testing areas and standards of successful cleaning shall be at: Inside the Control Tower at one (1) random locations measuring less than 200 ug/sf, Firing Line at three (3) random locations shall below 200ug/sf, East and West walls at two (2) random locations on each wall, range floors at three (3) random locations, front of the bullet trap at three (3) random locations, and rear of the bullet trap at three (3) random locations shall all be less than 400ug/sf.

1.6. Hours. The period of time required to perform maintenance actions will be one week. The duty hours to accomplish this work shall take place between the hours of 8:00 a.m. and 4:00 p.m. Central Standard Time (CST), Monday through Friday. Maintenance shall be conducted once every quarter. The contractor shall coordinate the exact dates for cleaning/service at least 30 days prior to the actual scheduled date of service with Range personnel and inform the COR of the maintenance dates. In the event of re-performance, the contractor shall schedule with CATM personnel for the earliest possible date.

1.7. Pick-up and Removal Schedule. The contractor shall retrieve all equipment it provided upon completion of the job.

2. SERVICES SUMMARY

2.1. Services Performance. The contract service requirements are summarized in performance objectives relating directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

Performance Objective
PWS Para
Performance Threshold
Remedy

SS-1

Preventative Maintenance/Inspection 1.2 inclusive

No more than 1 valid defects per quarter
Re-performance

Within 24 hours of notification

SS-2

New Filter and DCU Installation/Demolition, Cleaning, and Removal of current DCU from site)/Projectile/DCU Collection Barrel Change-Out/Replacements/Parts

1.3
No more than 1 defects per visit
Re-performance

Within 24 hours of notification

SS-3

De-leading (Removal of Frangible Copper Dust)/Range Cleaning (Walls/Floors/Barricades/Countertops/Barrels/ Control Tower)

1.4, 1.5., inclusive
No more than 3 valid defects per cleaning (0 allowed for the Control Tower and Firing Line)
Re-performance

Within 24 hours of notification

2.1. QUALITY CONTROL. The contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used, such as those of the American National Standards Institute (ANSI), OSHA. Include the inspection system requirements of FAR 52.246-4 in this document. The contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. A written Quality Control Plan shall be submitted to the contracting officer for review and feedback within 15 days after contract award. The plan shall be submitted no later than the pre-performance conference. The plan shall specifically address the contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.

2.2. QUALITY ASSURANCE. The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The CO or COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The CO or COR will use the contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the Contracting Officer a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the Contracting Officer within 10 calendar days of receipt.

2.3. PERFORMANCE ASSESSMENT. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service at no additional cost to the Government after notification by the CO or COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one quarterly period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive quarterly periods during a contract year shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.

2.4. PERIODIC PERFORMANCE MEETINGS: The CO, Functional Commander, COR, other government personnel as appropriate, and the Contractor shall meet once a quarter to discuss the Contractor’s performance. The following issues shall be discussed, opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.

The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: Government will meet all customer required support needed for the contractor to fulfill this contract. The Government will provide water, electric and lighting. Restroom facilities will be made available to the contractor in the performance of their work.

3.1. Government Remedies: The Contracting Officer will follow FAR 52.212-4, Contract Terms and Conditions- Commercial Items, for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

3.2. All solid and liquid waste accumulated in the performance of this PWS shall be properly collected and secured by the contractor with containers moved to a Government directed location on-site. Disposal activities of non-hazardous and hazardous waste shall be accomplished by the contractor IAW OSHA and EPA standards.

4. GENERAL INFORMATION.

4.1. RECOGNIZED HOLIDAYS: New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

***NOTE: No work shall be performed on Saturdays, Sundays, or any day the Base is closed due to exercise, elevated security posture, inclement weather causing closure of the base to non-essential personnel, and/or declared down days.

4.2. SECURITY REQUIREMENTS. All personnel employed by the contractor in the performance of this contract, or any representative of the Contractor entering the government installation shall abide by the security regulations of the installation. Contractor vehicles driven onto the base will be subject to inspection at entry gate, including but not limited to, military working dog searches. All vehicle drivers must possess a valid driver’s license, current vehicle registration and insurance for base entry. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Those found to be undocumented or illegal aliens will be incarcerated to the proper authorities.

4.2.1. All contractor vehicles shall be identified with company name and phone contact information located on the driver and passenger sides of the vehicle, with the exception of special purpose vehicles (forklifts and trailers).

4.3. RESPONSIBILITY. The Contractor is responsible for non-foreseeable damage caused by negligence.

4.4. SAFETY. The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all local, state and federal requirements. All personnel shall be instructed to be mindful of maintaining a safe environment for the base and the CATM compound occupants. The contractor shall ensure all personnel involved in handling and packaging any materials or wastes be trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures and spill response. Waste handling equipment and personal protective equipment shall be provided by the contractor and shall be appropriated to ensure safe handling of all materials and wastes. Contractor personnel and equipment shall be subject to OSHA while on Little Rock AFB property.

4.5. Spill Responsibility. The contractor shall be solely responsible for any and all spills or leaks, and subsequent cleanup, which occur as a result of, or are contributed to by, the actions of the contractor, the contractor’s agents, employees, or sub-contractors. The contractor shall clean up such spills or leaks following industry standard practice and in a manner that complies with OSHA standards and applicable federal, state, and local regulations, at no additional cost to the government. Immediately upon discovery, the contractor shall contact the base Fire Department and notify them of any spill or leak which occurs during the performance of work under this contract, regardless of the spill quantity.

APPENDIX A

Estimated Workload Frequency

Description Frequency/Interval

Preventative Maintenance/Inspection/Services Quarter

New Filter and DCU Installation/Demolition, Cleaning, and Removal of current DCU from site)/Projectile/DCU Collection Barrel Change-Out/Replacements/Parts Quarter

De-leading/Range Cleaning (Walls/Floors/Barricades/Counter Tops Semi-Annual Buckets/Control Tower)