VTE_PWS_LRAFB_22_Jun_16__(Atch_1).docx

DOCX document 47 KB Posted

Attached to
Vertical Transportation Equipment Maintenance Federal contract opportunity
Solicitation number
FA4460-16-T-0012
Issued by
Department of the Air Force Air Mobility Command

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Transportation Equipment Maintenance, newest first.
File Type Posted
VTE_Amendment_2.pdf PDF
Amendment_1_VTE.pdf PDF
SCA_WD_VTE.docx DOCX document
VTE_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR AND INSPECTION SERVICES

LITTLE ROCK AIR FORCE BASE

22 June 2016

SOLICIATION FA4460-17-X-XXXX

PERFORMANCE WORK STATEMENT (PWS) FOR

VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR, & INSPECTION SERVICES

1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas 72099 in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2 below). The VTE and their locations will be listed in Appendix B. NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix B: freight and passenger elevators, and may include escalators, wheelchair/stair lifts, dock levelers, and dumbwaiters as needed.

1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, replacements, and routine and emergency service calls to include monthly fire testing. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.

1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2007 (or applicable code for year VTE put in service), Safety Code for Elevators and Escalators (ASME A17.1), ANSI/ASME A17.2-2010, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment), A17.3-2011, Safety Code for Existing Elevators and Escalators (applicable to equipment), National Fire Protection Association Standards (NFPA), Unified Facilities Criteria (UFC) 3-600-01, Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards State of Arkansas regulations and the recommendations of the original equipment manufacturer (OEM).

1.3. NON-PERSONAL SERVICES AND/OR INHERENTLY GOVERNMENTAL SERVICES. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the PCO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.

2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a. modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)

2.2. Acts by parties other than the contractor of vandalism, abuse, negligence, major damage resulting from rescue and recovery operations, acts of God (major facility damage) are not included in the contract.

2.3. Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, main communication feeders to controller, security systems and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.

2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service. (custodial service)

2.5. In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the Contracting Officer’s Representative (COR). The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

3. DEFINITIONS:

3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2 Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Any alteration, modernization or upgrade to equipment shall be by a separate contract or modification to an existing contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

4. MAINTENANCE AND INSPECTION SERVICES:

4.1. The Contractor with the COR (or representative) shall determine the working order and condition of all VTE listed in Appendix B within thirty (30) calendar days of contract award. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).

4.2 The Contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements.

4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required.

4.5. The Contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators (see appendix B for due date). The three- (3) - year tests shall be scheduled in conjunction with the annual tests (see appendix B for due date)

4.6. The Government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.

4.7. The Contractor shall prepare and submit a written report within two (2) business days of work. The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.

4.8. The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the COR. The index and copies of certificates shall be delivered to the COR upon request; however, no later than one (1) business day of a request to review.

5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency. The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.

5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.1. All work requests for repairs outside normal maintenance shall be called in to the contractor by the COR. Work will be identified by a CE work order number.

5.1.2. The Contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the Government within 24 hours after receipt of the call on regular scheduled work days/hours.

5.1.3. The Contractor shall report to the work location, survey the repair, and provide the COR an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the COR. The Contractor shall prepare and submit to the COR a written report within two business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.

5.2.1. All work requests for emergencies shall be called in to the contractor by the COR. Work will be identified by a CE work order number.

5.2.2. The Contractor shall respond in person to the VTE and begin work on emergency service calls within two (2) hours after receipt of the call.

5.2.3. The Contractor shall report to the work location, survey the repair, and provide an estimate of time to repair and cost of repairs if not covered in the basic full maintenance service contract but necessary to bring the VTE back to operation (alteration). The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

6. SERVICES SUMMARY.

The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.

Contracting Officer may tailor the performance objectives to meet the individual installation needs. The following are offered as suggested areas.

Performance Objective
PWS Para
Performance Threshold

1. Adherence to Written Maintenance Control Program (MCP) for each VTE for all equipment.

MCP identifies all maintenance intervals to include safety inspections.

4
MCP in accordance with ASME A17.1 delivered to COR in 30 calendar days of contract award.

Inspections 1 decrepancy per month

2. VTE Service Availability
4
VTE availability is 95%.

3. Repair Service Call Routine – Response Time.

Response to routine calls within time specified in paragraph 5.1.2.

5.1.2.
Response to routine service calls are on-time 2 decrepancies on a monthly basis.

4. Repair Service Call Emergency – Response Time.

Response to emergency calls within time specified in PWS

5.2.2.
Response to emergency service calls are on-time 1 decrepancy on a quarterly basis.

5. Service Call Repairs – Repair Quality.

Repairs are of high quality resulting in reduced call backs.

5
Only three call backs of the same problem (same instance) each month.

6. Preventative Maintenance - MCP Adherence

4.7., 5.1.3, 5.2.3.
Preventative maintenance performed to MCP 2 decrepancies per month.
7. Reporting
2, 4, 5
Submit reports in a manner consistent with PWS 1 decrepancy per quarter

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government does not anticipate providing any government furnished property (GFP). None

8. GENERAL INFORMATION.

8.1. (Reserved)

8.2. QUALITY ASSURANCE. The Government shall periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

8.3. HOURS OF OPERATION. Normal Duty Hours are 0700-1600 Central Standard Time. Elevator contract maintenance workers shall have 24 hour passes, 7 days a week for emergency access.

8.4. SECURITY REQUIREMENTS.

8.4.1. Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes. The contractor shall comply with all requirements and procedures of Contractor Access to Air Force Installations.

8.4.2. Vehicle and IDs. The contractor is responsible for complying with all security requirements, including vehicle registration and personnel passes, for all vehicles and personnel requiring access to military installation. The contractor shall obtain a Base Identification Card for all employees. Revocation of a registration or pass shall not be grounds for failure to perform, and changing of security requirements shall not be grounds for adjustment in price.

8.4.3. Flight Line Driving. Base Ops require all contractor employees to report to building 120 before proceeding to any part of flight line area including any facility south of Chief William’s Road. The contractor should be prepared to state their business, destination, and estimated time. The contractor will be required to pick up a cone to place on top of their vehicle and to return the cone to Base Ops before leaving the area.

8.4.4. Contractor Personnel. Contractor personnel shall be easily identified by company name or logo on a badge, uniform, jacket, shirt, hat, or other means determined by the contractor. All employees shall comply with this requirement at all times while providing services on Little Rock Air Force Base.

8.5. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER. None

8.6. SPECIAL QUALIFICATIONS. The Contractor will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to COR upon request) in maintenance of VTE.

8.7. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.

8.8. ENVIRONMENTAL CONTROL. The Contractor shall comply, and assure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals. A copy of all MSDS will be provided to the COR. The MSDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The Contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.

8.9. ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j)(7)(iv). VTE may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.

APPENDICES.

A. Include Maps and/or Site Plans

B. Include VTE Equipment Listing

Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair and Inspection Services Appendix A Location Map

Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair and Inspection Services Appendix B VTE Equipment Listing

ELEVATOR SYSTEMS

Number of Elevators
Building Number
Equipment Type
Monthly Fire Inspections
State Semi-Annual

Inspections Due Perform 3 or 5 Year Full Load Test

1
214
Thyssen-Krupp TAC50 Traction
Yes
Aug & Feb
5 YR Due 2020
1
232
Thyssen-Krupp Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
285
Schindler Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
318
Thyssen-Krupp TAC20 Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
481
Otis Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
882
Thyssen-Krupp Traction
Yes
Aug & Feb
5 YR Due 2020
3
952
Schindler Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
1231
Minnesota Elevator Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
1250
Dover Hydraulic
Yes
Aug & Feb
3 YR Due 2017
1
1255
Dover Hydraulic
Yes
Aug & Feb
3 YR Due 2017

File details come from the government source that posted it. Updated .