FA4460-16-B-0005_Q A.pdf
PDF 597 KB Posted
- Attached to
- Repair/sustain Roofs Buildings 536 & 540 LRAFB
- Solicitation number
- FA4460-16-B-0005
About this file
Questions and Answers to the Site Visit
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3_Bid_Opening_Date_Change_FA4460-16-B-0005.pdf | ||
| FA4460-16-B-0005_QA_Amendment.pdf | ||
| FA446-16-B-0005_Solicitation.pdf | ||
| Attachment_7.pdf | ||
| Attachment_10.pdf | ||
| Attachment_2.pdf | ||
| Attachment_8.pdf | ||
| Attachment_5.pdf | ||
| FA446-16-B-0005_Amendment_1.pdf | ||
| Attachment_3.pdf | ||
| Attachment_4.pdf | ||
| Attachment_6.pdf | ||
| Attachment_9.pdf | ||
| Attachment_1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4460‐16‐B‐0005 (Rpr/Sus Roofs CES Admin/Shops B‐536;Rpr/Sus Roofs CES Shops B‐540)
SOW 2.03. B.31. The DESIGN-BUILD Firm shall provide lighting protection. Lighting protection shall be attached using non-penetrating clamps.
Q: Is there a LRAFB standard of design for this request?
Q: Is the DESIGN-BUILD Firm to protect/incorporate the adjacent tower elements as well?
SOW 2.02 D- Remove all penetrations and associated equipment that are no longer in use as identified on Attachment 1 and/or verified on pre-bid site visit.
Q. Though this was not verified at site visit are there any record drawings specifying existing penetrations to be removed?
SOW 2.03 B 11. The DESIGN-BUILD Firm shall provide a roof slope no less than 4:12, and a roof system compatible with other sloping metal roofs in the area.
Q: The design impact of the new roof system sloping at 4:12 could increase lateral loading significantly on the existing framing. A new SSMR (Standing Seam Metal Roof) panel system can be installed at a slope of ½:12.
Can we reduce the min. slope to reduce the increase in lateral loading?
Q: If not ½:12, can we at least match the current SSMR slope of the east side of the building? (see attached image)
SOW 2.22. The DESIGN-BUILD Firm shall provide thermal insulation. Provide a thermal resistance “R” value of 38 or more. Flexible blanket, rigid, or semi-rigid faced with a flexible vapor retarder. Vapor retarder shall be an ice/water guard membrane underlayment. Insulation and facing shall have a flame spread rating of 50 or less in accordance with ASTM E 84.
Vapor retarder facing shall have a permeance rating of 0.05 perm or less.
Q: Reaching the R-38 insulation can be completed with several different material choices. However, by doing this and the results may establish different dew points if the existing kraft paper insulation is to remain (See attached image). Will LRAFB consider alternatives to this SOW once a team is established under Design Development?
SOE 2.33. The Design-Build Firm shall provide a permanent lighted catwalk and heat detectors in the design of the attic space. The roof design shall provide adequate access for
QUESTIONS AND ANSWERS
1239715393C Text Box Answer: Please see Section 01 10 01 paragraph 2.07 for lightning protection details required. Certification is required.
1239715393C Text Box Answer: Yes.
1239715393C Text Box Answer: No. This will have to be verified during the design process.
1239715393C Text Box Answer: Yes, it would be acceptable to match the existing slope and profile of the existing metal roof of B-540 and yes, the existing metal panels shall be replaced with new panels for a continuous roofing application, warranty, etc
1239715393C Text Box Answer: The D/B Firm shall be responsible for an R-38. Where and what materials used can be determined during the design process.
maintenance and removal of all mechanical, electrical, and communication equipment designed to be left in place on the existing roof.
Q: If approval for a lower slope roof is granted under SOW 2.03 B 11 can this item be deleted? Our proposed solution would be to place all equipment above the completed roof plane.
Q: Can LRAFB offer additional record drawings of any structural or roof conditions for Building 540 and 536?
Q: Roof decking is 6” wood plank decking and not metal decking as stated in SOW. Can we replace with like-kind wood decking?
Q: Please confirm that the SOW will require The DESIGN-BUILD Firm to extend the existing skylights through the new roof assembly? Will LRAFB allow the substitution of installing Solar Tubes in like for like locations with the D-B firm providing interior repairs where necessary to integrate the new size.
Q: Are the awnings above the doors (and below the main roof surfaces) included in the SOW?
Q: Are the canopy roofs included in the project?
Q: What are the intended access hours of the base?
Q: Is Rapid Gate access available for contractors?
Q: What are the contractor working hours and days of week?
Q: Does the base have any standard closures for working days?
1239715393C Text Box Answer: No, a lighted cat walk will still be required to check heat detectors, etc.
1239715393C Text Box Answer: As-builts are not available for either facility.
1239715393C Text Box Answer: Yes, replacing with similar material is acceptable.
1239715393C Text Box Answer: Extend the existing skylights, Solar Tubes are not acceptable.
1239715393C Text Box Answer: No, the awnings are not acceptable.
1239715393C Text Box Answer: No the canopies are not included.
1239715393C Text Box Answer: See SOW.
1239715393C Text Box Answer: No.
1239715393C Text Box Answer: See SOW.
1239715393C Text Box Answer: See SOW.
FA4460‐16‐B‐0005 Repair/Sustain Roofs Buildings 536 & 540 LRAFB
RFI’s
1.) Which penetrations are no longer in use?
a) The Design Build Firm shall verify exact number and location during the design process.
2.) Are the skylights to be removed?
a) No, they are to remain.
3.) If skylights stay, is a fall protection screen required over each?
a) The Design Build Firm is in charge of job site safety and shall take all safety precautions necessary.
3.) Is a slope less than 4:12 permitted, like the newer addition? If so, what is the minimum slope allowed?
a) Yes, it would be acceptable to match the existing slope and profile of the existing metal roof of B‐540.
4.) Is the standing seam at the new addition on the east end of BLDG 540 to be replaced?
a) Yes, the existing metal panels shall be replaced with new panels for a continuous roofing application, warranty, etc.
5.) Are door entry roofs and canopy roofs to be replaced as well?
a) No the entry roofs and canopies are not included.
6.) The dust collection system at the NW corner of BLDG 540 is less than two feet from the building wall, is the relocation of this unit to be included in bid?
a) If it has to be relocated due to the design and to meet the requirements of the SOW, then yes.
7.) Is a roof survey available for 540?
a) No, a survey is not available.
| FA4460-16-B-0005 20MAY16 (RFI Clarification Request)-signed |
| RFI FA4460-16-B-0005 part 2 |