Amendment 0001.pdf

PDF 232 KB Posted

Attached to
B753 Renovation, Pope AAF, NC Federal contract opportunity
Solicitation number
FA445222Q0017
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to B753 Renovation, Pope AAF, NC, newest first.
File Type Posted
B753 Site Map.pdf PDF
FA445222Q0017 Combined Synopsis Solicitation.pdf PDF
B753 Lactation Wall Floor Plan.pdf PDF
B753-Statement of Work-room 211 divided -JUL 22.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

763D ENTERPRISE SOURCING SQUADRON

SCOTT AIR FORCE BASE ILLINOIS

Warfighter Acquisition… Innovation, Excellence, Victory!

09 September 2022

ALL INTERESTED PARTIES

SUBJECT: FA445222Q0017, Amendment 0001

1. The purpose of this Amendment is to extend the quote due date from 09 September to 14 September at 1400 CDT. All other details remain unchanged.

2. Additionally, see the below requested Questions and Answers.

a. Q: Please confirm that all existing flooring is to be removed and replaced with a

2x2 carpet tile not limited to 211A, 211B, and 210.

Per SoW, only 211A and 211B will have flooring removed and replace with new 2x2 carpet tiles. No flooring work in 210 conference room.

b. Q: Please confirm that there are no services/utilities/obstacles located where the doorways cut openings are to be performed. (Rooms 211A and 210) Did not see any obstructions or utilities that would be in the way of the doors.

c. Q: Please confirm the replacement of existing sheetrock where there is wallpaper removal damage.

Confirmed.

d. Q: Please specify metal framing gauge.

Use 20 Gauge with 1 5/8 in flanges in case those walls are load bearing. Door framing should be similar within 2 gauge difference.

e. Q: Please confirm that four cabinets are to be installed as shown in the provided drawings.

Confirmed. Cabinets should be centered around the existing plumbing connections. See SoW pictures for details.

f. Q: Please confirm that the hardware for the new door includes door closers to match existing door hardware.

Confirmed. Match existing. Contractor will verify that locks come with a core for DPW keying.

g. Q: Can team members use your bathroom facilities?

Confirmed.

Cassie Blair, TSgt, USAF Contracting Officer 763 ESS/OL-Pope AAF, NC

File details come from the government source that posted it. Updated .