2. 60 FSS Reach - In Warmers and Coolers SOW (Statement of Work).pdf

PDF 165 KB Posted

Attached to
60 FSS Reach-In Warmer and Cooler, Travis AFB CA
Solicitation number
FA442726QZ064
Issued by

About this file

This is a Statement of Work for the removal and installation of commercial-grade warming and refrigeration equipment at the Monarch Dining Facility, Travis AFB, California. The 60th Force Support Squadron (60 FSS) requires the contractor to remove two existing Traulsen warmers and two existing Traulsen coolers, dispose of the old equipment, and install two new two-door Traulsen reach-through warmers and two new two-door Traulsen coolers. The contractor must provide all labor, materials, specialized equipment, and off-site waste disposal at no additional cost to the government.

The specific equipment to be installed includes Traulsen Warmer Model RHF132WP-HHS and Traulsen Refrigerator Model RHT132WPUT-HHS units with half doors, dimensions of 29 7/8" width by 83 ¼" height by 37 15/16" depth, 60 Hz, single-phase, 115/208 voltage, 208v/60/3-phase, 16.2kw, 45.0 amps rating, and standard one-year manufacturer limited parts and labor warranty. Delivery must occur within 30 days after contract award to 600 Burgan Boulevard, Building 1301, Travis AFB, CA. Installation must be completed during business hours between 7:00 AM and 4:30 PM, Monday through Friday. The contractor must coordinate with the government point of contact at least 48 hours prior to delivery and installation, is responsible for any property damage caused by contractor activities, and must ensure all debris is removed from the base. Materials damaged during handling, storage, or construction traffic will be rejected and replaced at the contractor's expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for Monarch Dining Facility

Pass through Warmer/Refrigerator Removal and Installation

9 July 2026

The 60 FSS on Travis AFB, CA has a requirement for a 2-two-door reach through warmers and 2 two-door Traulsen coolers. (brand name or equal). The requirement is to remove and dispose of the existing Traulsen warmers/coolers and installation of the new commercial grade Traulsen warmers/coolers in the Monarch dining facility kitchen. The Contractor must provide all labor, materials, and specialized equipment as necessary to perform the work described herein as well as disposal of the removed items.

1. Description of Work:

All work to be accomplished includes the following:

Disposal of existing Traulsen warmers/coolers which may require disassembly of the structure including any anchors and dispose of all materials. Install new Traulsen warmer/coolers to include proper installation of the equipment and any related requirements.

2. Reach-In Warmer/Cooler

2.1 • Traulsen Warmer Model RHF132WP-HHS Traulsen Refrigerator Model RHT132WPUT-HHS Half Door(Each) Width 29 7/8 Inch Height 83 ¼ Depth 37 15/16 Hertz 60 Hz Phase 1 Phase Voltage 115/208

• 1 ea. 1-year limited parts & labor warranty, standard

• 1 ea. (2) 208v/60/3-ph, 16.2kw,45.0 amps

Warranty - Standard Manufacturer Warranty

3. Installation

Installation for Traulsen Stainless Steel Solid Half Door Single Reach-In Pass Through Heating/Holding Cabinet.

• Disconnect and remove existing Traulsen warmer/coolers and haul away old equipment for proper disposal.

• New warmers/coolers will be delivered directly to Travis AFB and off loaded and stored in a safe place until installation takes place.

Installer shall uncrate the griddle, set in place, hook up to existing utilities and make ready for use.

4. Installation Requirements

Contractor must supply all, labor, and equipment necessary to install the new warmers/coolers.

Contractor will coordinate with Government POC at least 48 hrs. prior to delivery and installation.

• The Contractor is responsible to secure additional storage off-site, if required, at no additional cost to the Government. Materials damaged in handling, storage, construction traffic, etc., will be rejected and replaced at the Contractor’s expense.

• The Contractor is responsible for any damages to property caused by the Contractor's activities.

• Facility Is equipped with standard height loading and unloading dock.

• Any debris or trash created by the vendor on the jobsite will be disposed of by the vendor off

Travis AFB. Contractor personnel are only to be in their assigned areas and are not allowed in other areas without section supervision approval and/or escort.

• Removal and installation must be completed during business hours between 07:00 am thru 4:30 pm Monday through Friday.

Delivery:

• 30 days after contract award

• 600 Burgan, Blvd. Bldg. 1301, (Monarch Dining Facility) Travis AFB, CA