SOW- FY24 Active Vehicle Gate Repair Dated 10JULY24.pdf

PDF 202 KB Posted

Attached to
FY24 Active Vehicle Gate Repair
Solicitation number
FA442724Q0127
Issued by

About this file

This document is a Statement of Work (SOW) for the FY24 Active Vehicle Gate Repair project. The contractor will be responsible for providing all materials, labor, supervision, and equipment to complete welding of trap plates on necessary gates, dispose of damaged plates, repair damaged hydraulic trap actuator base plates, replace damaged trap actuators, and purchase and install new springs at the Main Gate, Hospital Gate, and North Gate locations. All work must comply with UFC 4-022-01 and AFI 32-1001 Chapter 11 requirements. The contractor shall clean up and dispose of all debris appropriately, and the work will be conducted during the week between 0600-1800 hours. This SOW is related to Solicitation Number FA442724Q0127 issued by the Department of the Air Force Air Mobility Command for the FY24 Active Vehicle Gate Repair project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 JUL 24

STATEMENT OF WORK

FY24 ACTIVE VEHICLE GATE REPAIR

GENERAL DESCRIPTION:

The contractor shall provide all materials, labor, supervision, and equipment to complete welding of trap plate on necessary gate, dispose of damaged plates, repair damaged hydraulic trap actuator base plate and ensure proper mounting, replace damaged trap actuators, purchase, and install new springs, dispose of all hazardous material and waste. All work shall conform in accordance with any UFC 4-022-01 and AFI 32-1001 Chapter 11 Section.

DESCRIPTION OF WORK: FY24 ACTIVE VEHICLE GATE REPAIR

Location Description

Main Gate

• Removal of both sides (4 total) OEM horizontal sliding bar springs

• Installation of new custom manufactures springs

Hospital Gate

• Remove damaged hinge trap plate

• Weld new stainless-steel trap plate

• Replace Damaged hydraulic actuator

North Gate • Repair damaged hydraulic trap actuator base plate

ADDITIONAL REQUIREMENTS:

Clean up and dispose of all debris appropriately on a daily basis. Site is to remain tidy at all times and cleaned up on completion of works. Contractor shall comply with all local, state, federal and base environmental requirements. All waste materials shall become the property of the contractor and shall be transported, disposed of, and recycled in accordance with all federal, state, and local regulatory requirements and laws.

PERIOD OF PERFORMANCE:

All work will be conducted during the week (Mon-Fri) between the hours of 0600-1800