This document is a combined synopsis/solicitation for a Firm Fixed Price contract for a Cost Per Reportable (CPR) Automated Chemistry and Immunoassay system for the David Grant Medical Center at Travis Air Force Base, California. The Department of the Air Force Air Mobility Command is seeking to award a contract with a base year and four 12-month option periods, with a possible 6-month extension. The NAICS code is 334516 - Analytical Laboratory Instrument Manufacturing, with a small business size standard of 1,000 employees. Contractors must provide quotes by 12 July 2024 and attend a site visit on 18 June 2024. The contract will be priced on a Cost Per Reportable basis, and the selected contractor will be responsible for providing all equipment. The government will use simplified acquisition procedures under FAR Part 13.5.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
120/208V MAIN CB: 100A
ROOM # 2B316 C.B. CKT CKT C.B. FED FROM: 2AY2
R/2B316 REFRIGERATOR 20A 1 2 20A R/2B316 REFRIGERATOR
R/2B316 REFRIGERATOR 20A 3 4 20A R/2B316
R/2B316 20A 5 6 20A R/2B316
R/2B316 20A 7 8 20A R/2B316
R/2B316 20A 9 10 20A R/2B316
R/2B316 20A 11 12 20A R/2B316
R/2B316 20A 13 14 20A R/2B316
R/2B316 20A 15 16 20A R/2B316
R/2B316 20A 17 18 20A R/2B316
R/2B316 REFRIGERATOR 20A 19 20 20A R/2B316
R/2B316 20A 21 22 20A R/2B316
23 24
25 26
R/2B316 REFRIGERATOR 20A 27 28 20A R/2B316
SPARE 20A 29 30 20A SPARE
SPARE 20A 31 32 20A SPARE
SPACE 33 34 SPACE
SPACE 35 36 SPACE
SPACE 37 38 SPACE
SPACE 39 40 SPACE
SPACE 41 42 SPACE
L = Lighting E = EquipmentR = Receptacles
PREVIOUS UNIDENTIFIED CIRCUITS WERE INVESTIGATED AND LOADS IDENTIFIED
ON 4-6-15. HOWEVER, DUE TO THE AGE OF THE BUILDING AND NUMBER OF PROJECTS
THAT HAVE TAKEN PLACE, NO CIRCUIT SHOULD BE CONSIDERED GUARANTEED.
REVISIONS/COMMENTS
100A
PANEL SCHEDULE
3P4W
PANEL: 2ALY5
2B316 BLOOD STORAGE
FREEZER
20A 2P
2B316 BLOOD STORAGE
FREEZER
California Proposition 65 WARNING The vinyl holder may contain a chemical known to the State of California to cause
Cancer or Birth Defects or Other Reproductive Harm.
2ALY5
120/208V MAIN CB: 100A
R/2B316 20A 1 2 20A R/2B316
R/2B316 20A 3 4 20A R/2B316
R/2B316 REFRIGERATOR 20A 5 6 20A R/2B316
R/2B316 20A 7 8 20A R/2B316
R/2B316 20A 9 10 20A R/2B316
R/2B316 20A 11 12 20A R/2B316
R/2B316 20A 13 14 20A R/2B316
R/2B316 20A 15 16 20A R/2B316
R/2B316 20A 17 18 20A R/2B316
R/2B316 20A 19 20 20A R/2B316
R/2B316 20A 21 22 20A R/2B303
R/2B303 20A 23 24 20A SPARE
R/2B316 REFRIGERATOR 20A 25 26 20A SPARE
SPARE 20A 27 28
29 30
31 32
33 34 20A R/2B303
R/2B316 20A 35 36 20A SPARE
R/2B316 20A 37 38 20A SPARE
SPARE 20A 39 40 20A SPARE
L = Lighting E = Equipment
3P20A
3P
NOT ON THE ONE LINE
R = Receptacles
PANEL: 2ALY6
R/2B303
R/2B303
2ALY6
120/208 MLO: 100A
1 2 20A R/2B316
3 4 20A R/2B316
5 6
7 8
9 10 UNKNOWN
11 12 UNKNOWN
R/2B316 20A 13 14 UNKNOWN
SPARE 20A 15 16 UNKNOWN
17 18 UNKNOWN
19 20 UNKNOWN
21 22 UNKNOWN
23 24 UNKNOWN
SPACE 25 26 UNKNOWN
SPACE 27 28 UNKNOWN
SPACE 29 30 UNKNOWN
SPACE 31 32 UNKNOWN
SPACE 33 34 UNKNOWN
SPACE 35 36 UNKNOWN
SPACE 37 38 UNKNOWN
SPACE 39 40 SPACE
L = Lighting E = Equipment
PANEL: 2ALY7
E/2B316 COBAS ANALYZER
30A
R = Receptacles
E/2B316
E/2B316
2ALY7
ARCHITECT
i2000SR
Flammable Cabinet
Frig Freezer
A l i n t y
U
P S
K v a
Heme Bench
CCC
PPPP
ELGA
MEDICA
Pro
PP
Existing Power pole and DI water valve
PNEUMATIC PLATE
Existing Compressed airline
Will need to be removed
Existing Drain
ST
A-
R
STA-R
IOM TIM
(tube identification module)
Sealer Desealer
Decapper
CentrifugeCentrifugeCentrifuge
WASTE
BIN
SRM 9000
i n i n i
C
I i n i n i
CISCO
ROUTER
HUB
AUX-BOX
MAIN POWER DISTRIBUTION
PLATE
400V
Architect/Alinity
UPS 4Kva SP2
G
D
D D
T
Summary from Utility on Pole
400V Service from track UPS/Transformer
(3) 208V 30A L6-30R Analyzer UPS Power: "E" Power
(6) 120V 20A 5-20R General Power: "E" Power
(11) Data Lines
Compresses Air Feed
DI Water Loop with 2 valves
400V Distribution Panel
This is included with the track hardware
Track Pneumatic Panel
This is included with the track hardware
(11) Data lines
Terminated using using armored flex conduit with 4x4 "J" box w/cover plate
Mounted on lower shelf in track
General Power: "E" Power
(2) 120V 20A Quad 5-20R per location
(Dedicated circuit per location)
Terminated using armored flex or sealtite conduit with 4x4 "J" box w/cover plate.
Compressed Air supply
Pipe and termination Detail:
" Feed line from compressor terminated 18" from floor with
" ball valve FNPT and gauge 0-150psi
Abbott to provide tubing between supply valve at pole and the track main input air panel
9"
120V 20A r c u e d a t
5-20R
400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a
208v 30a 208v 30a 208v 30a 208v 30a 208v 30a
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a
120v 20a 120v 20a r a t
Quad 5-20R
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a r a t r a t
DataData
X 11
Terminated using armored flex or sealtite
(2) DI Water Feed Valve
Each terminated with Ball valve, pressure regulator 0-30 psi and gauge 0-30 psi
208v 30a 208v 30a 208v 30a 208v 30a 208v 30a
208v 30a 208v 30a 208v 30a
Air Compressor
Power requirements:
208v
3 phase service
Air tank drain and Disiccant dryer
Power requirements:
(1) 120V 20A Duplex 5-20R
Floor drain
80 Gal.
Tank
Desiccent
Dryer
SET1007
15HP
Compressor
PowerEx
FRONT PANEL ** Location TBD **
Air Compressor **Location TBD**
Power Requirements
Input: 208v 3 phase service "E" Power
18"W x 30"D x 26"H12"W x 34"D x 40"H
I
S e r i e s o w r
C o n d i t i o n
K v t o w v a r a c k k
Track UPS / Transformer
W e
L p e
DI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water Loop
DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop e e r a t
208V 30A
L6-30R a t r a t r r a t r a t r a t
Analyzer UPS Power: "E" Power
(3) 208V 30A L6-30R conduit with a 4x4 "J" box w/cover plate.
r a t r a t
STA-R Power: "E" Power
(4) 120V 20A Duplex (2 per module seperate circuits)
Terminated using Armored flex conduit
4x4 "J" box w/cover plate a t r r a t
Duplex 5-20R
General Power r a t
ELGA Power: "E" Power
(2) 120V 20A Duplex 5-20R
Summary from Utility on Pole for ELGA systems
(6) 120V 20A 5-20R General Power: "E" Power
Cold Water feed with 2 valves
Unless noted Dimension = mm
Layout Designer:
Design Requester:
David Grant Medical Center
Travis Air Force Base
SHOP DRAWING
Notes:
1. This a3600 configuration is preliminary and subject to revision upon final manufacturing review.
2. Floorplan derived from converted data, dimensions to building structure or fixtures is for reference only.
10/13/2021 DD
Final Layout
AutoCAD SHX Text
B
L.Marquez
2021/10/08
Scale=1:30
Opt 3.2
S.Pritchett
Sheets and Views
OPT 3.2
IOM TIM
(tube identification module)
Sealer Desealer
Decapper
CentrifugeCentrifugeCentrifuge
WASTE
BIN
SRM 9000
Flammable
Frig Freezer
K
Heme
Command Center
Server
PNEUMATIC PLATE
Existing Compressed airline
**Will need to be removed**
CISCO
ROUTER
HUB
MAIN POWER DISTRIBUTION
PLATE
400V
D D
9" r a t
400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V400V / 230V
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a
208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a
120v 20a 120v 20a r a t
120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a 120v 20a r a t r a t
DataData
X 11
208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a 208v 30a e e
DI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water LoopDI Water Loop
DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop DI Water Loop e e r a t a t r a t r r a t r a t r a t
STA-R 120V 20A
r a t r a t a t r r a t r a t
New Power poles for
Command Center and Server Cabinet
(4) 120v 20a Quads
Existing Power Pole #1 **Remove**
Existing Power Pole #2
Existing Power Pole #7
Existing Power Pole #8
Existing Power Pole #6
Existing Power Pole #3
Existing Power Pole #4
Existing Power Pole #5
Existing Power Pole #9
Existing Power Pole #12 Not needed for Abbott
Could remain
Existing Power Pole #13 Not needed for Abbott
Could remain
Existing Power Pole #10 Remain to power Heme
Bench Existing Power Pole #11 Remain to power Heme
Existing Cold water supply
**Will need to be removed**
Existing DI Water valve Near Power Pole #9
New Power pole For New ELGA Water systems
(2) 120v 20a Duplex
(2) Cold water Feed
Valves
** Relocate compressed airline to track utility pole location **
** Relocate cold water feed to the ELGA water system utility pole location **
Unless noted Dimension = mm
Layout Designer:
Design Requester:
David Grant Medical Center
Travis Air Force Base
Notes:
1. This a3600 configuration is preliminary and subject to revision upon final manufacturing review.
2. Floorplan derived from converted data, dimensions to building structure or fixtures is for reference only.
Power Pole Locations
12/01/2021 DD
Final Layout
L.Marquez
2021/10/08
Scale=1:30
Opt 3.2
S.Pritchett
Sheets and Views
Power Pole Locations
E
COULTER
5.1 VITROS
V
IT
R O S
E
IQ
5.1 VITROS
O U
LT
4'-8"
4' 2"
1' 1"
2ALY1-6
2ALY1-7
2ALY1-8
2ALY1-9
2ALY1-10
2ALY1-11
2ALY1-12
2ALY1-13
G/LF LF LF LF LF LFLF
2ALY1-17 2ALY1-18 2ALY1-19
2ALY1-23 2ALY1-22 2ALY1-21 2ALY1-20
LF LFLF LF LF LF G/LF G/LFLF
2ALY1-30 2ALY1-29 2ALY1-28 2ALY1-27
G/LF LF LF LF LF LFLF
2ALY1-32 2ALY1-33
2ALY1-37 2ALY1-36 2ALY1-35 2ALY1-34
G/LF G/LF LF LF LFLF LF LF LF
LF LF LF G/LFLF LF LF G/LF
G/LF LF LF LF LFLFLFLFG/LF
2ALY1-25 2ALY1-26
2ALY1-15 2ALY1-14
2ALY1-16
2ALY1
+48"
2B302
MICROBIOLOGY
2ALY1-31
2ALY1-382ALY1-39
?G
2ALY1-4
G/LF G/LF
G/LF
2ALY1-40
2ALY1-24
2ALY1-42
2ALY1-41
2ALY2E-1,3,5,2
2ALY1-2
2ALY2
2ALY2-1
2ALY2-9
2ALY2-2
2ALY2-4
2ALY2-3
2ALY2-5
2ALY2-6
2ALY2-7
2ALY2-8
2ALY2-14
2ALY2-12
2ALY2-17
2ALY2-18
2ALY2-19
2ALY2-21
LF
2B404
BLOOD
BANK
2ALY2-25
6-15R
2ALY2-29,31
G/LF 2ALY2-30
2ALY2-11
2ALY2-32
2ALY2-15
2ALY2-16
2ALY2-33
2ALY2-13
DT
2ALY2-23
2ALY2E-4,6,8,12
2ALY6 2ALY5
2ALY6-52ALY6-42ALY6-32ALY6-22ALY6-1
LF LF
2ALY5-1
2ALY5-2
2ALY5-3
2ALY6-6 2ALY6-7 2ALY6-8
2ALY6-92ALY6-102ALY6-11 2ALY6-16
LF LFLF LF LF
LFLFLFLFLFLF LFLF
2ALY6-22
2ALY5-4 2ALY5-5 2ALY5-6
G/LF LF LF LF LF LF LFLF LF
2ALY5-11 2ALY5-10 2ALY5-9 2ALY5-8 2ALY5-7
G/LF G/LF LF LF LF LF LFG/LF LF LF LF LF
2ALY5-122ALY5-132ALY5-142ALY5-152ALY5-162ALY5-17
G/OC
OC
2ALY5-22
2ALY5-21
2ALY5-20
2B303
OFFICE
G/LF LF LF LFG/LFG/LF
LF LFLFLF LFLF
TV
2AN2.2-61
2AN2.2-632AN2.2-71
2B304
BREAKROOM
2AN2.2-66
2AN2.2-64
2AN2.2-62
G G+48"
OC OC
2ALY5-23,25
2ALY5-24,26
2B316
LABORATORY
20 21 22 23
H
2AN2.1-34
2ALY5-182ALY5-19
2ALY5-28
2ALY6-12 2ALY6-13 2ALY6-14 2ALY6-15
2ALY6-17,18,19 2ALY6-20,21,35
3 6
2ALY6-28,30,32,34
2ALY6-23,29,31,33
10 3
2ALY6-37
2AN2.2-78
2ALY7-6,8
2ALY7-9,11
2ALY7
2ALY7-2
2ALY7-4
2ALY7-1,3,5,7
2ALY5-27
2ALY3
G/LF G/LF G/LF G/LF LF LF
LFG/LFG/LFG/LF
LF LFLFLFLFLF
LF LF
LFLFLFLF
LFLFLFLF
G/LFG/LF
2ALY3-2
2ALY3-3
2ALY3-1
2ALY3-9
2ALY3-10
2ALY3-5 2ALY3-62ALY3-4
2ALY3-11
2ALY3-8 2ALY3-7
2ALY3-15
2ALY3-16
2ALY3-12
2ALY3-13
2ALY3-14
2ALY3-192ALY3-18
2ALY3-20 2ALY3-21 2ALY3-25
2ALY3-23
2ALY3-22
2ALY3-17
2ALY4
G G/LF+48"
2ALY4-1
2ALY4-2
2ALY4-3
2ALY4-4
2ALY4-5
2ALY4-6
2ALY4-7
2ALY4-8
2ALY4-112ALY4-122ALY4-13
2ALY3-27
2B405
HISTOPATHOLOGY
2ALY3-26 2ALY3-24
2ALY4-14
2ALY4-15
2ALY3-282ALY3-29
2ALY4-16
2ALY4-9
7 7
2ALY4-20
2ALY4-18
2ALY3-30 7
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ENGINEER WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT.
THE ELECTRONIC FILE OF THIS SHEET WILL DETERIORATE
OVER TIME. THEREFOR, THE HARDCOPY PLANS TAKE
PRECEDENCE OVER THE ELECTRONIC FILES. RLF DOES
NOT ACCEPT ANY RESPONSIBILITY FOR UNAUTHORIZED
CHANGES TO THE ELECTRONIC FILES MADE BY THE
OWNER OR OTHERS.
AD L
EK
N
LL
F
IS EN
GI
O N A
EC NIL
S E
No 0052705
STATE OF
ROLF
I D A
EE
AS
M
ON
1/4"=1'-0" GRAPHIC SCALE
15'10'5'1'01'
09/16/2011
NOTE: IF THIS DRAWING IS LESS THAN 30" X 42"
IT IS A REDUCED SIZE DRAWING.
DA
VI
D
RA
ED
IC
AL
EN
TE
RE
CO
RD
RA
IN
th ed ic al G ro up
TR
AV
IS
FB
, C
FY
H
SP
IT
AL
DE
RN
IZ
AT
IO
RO
JE
CT
SHEET
REFERENCE
NO:
SHEET OF
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
WJE PROJECT NO. :
CONTRACT NO. :
TASK ORDER NO. :
W9126-08-D-0055
Copyright c 2008, WJE HEALTHCARE ARCHITECTS and RLF, All Rights Reserved
WJE HEALTHCARE ARCHITECTS
UNITED EXCEL CORPORATION
ROGERS, LOVELOCK & FRITZ, INC.
FORT WORTH DISTRICT
wje‐architects.com Fx: (913) 438‐2660
Lenexa, Kansas 66214 8207 Melrose Dr., Suite 145
Ph: (913) 438‐9095 unitedexcel.com Fx: (913) 647‐9500
Merriam, Kansas 66202 5425 Antioch Drive
Ph: (913) 647‐9400 rlfae.com Fx: (407) 629‐9409
Winter Park, Florida 32789 145 Lincoln Avenue
Ph: (407) 647‐1039
Architecture, Engineering, Interior Design
REVISION BY
PROFESSIONAL SEAL
KEY NOTES
1 2 3 4 5
1 2 3 4 5
As indicated
PARTIAL 2ND FLOOR
ENLARGED ROOM
PLANS - LABORATORY
DRS
DRD
LB-EP401
SCALE: 1/4" = 1'-0"
B22B302 MICROBIOLOGY ENLARGED POWER PLAN
B42B404 BLOOD BANK ENLARGED POWER PLAN
D42B316 LABORATORY ENLARGED POWER PLAN
B52B405 HISTOPATHOLOGY ENLARGED POWER PLAN
1 PROVIDE WALL MOUNTED JUNCTION BOX AT
+84"AFF. HARD WIRED CONNECTION TO THE BLOOD
STORAGE FREEZER, 208V/1PH, 13.8 FLA.
2 PROVIDE 4#10 PHASE CONDUCTORS, 2#10 NEUTRAL
CONDUCTORS, AND 1#12 GROUND CONDUCTOR.
ONE NEUTRAL IS SHARED BETWEEN THE FIRST
THREE CIRCUITS. THE SECOND NEUTRAL IS
DEDICATED TO THE FOURTH CIRCUIT. INSTALL
CONDUCTORS IN A 1" CONDUIT.
3 CONNECT TWO RECEPTACLES PER CIRCUIT.
4 1"C - 4#8 + 2 #10 GROUND.
5 COORDINATE EXACT LOCATION WITH EQUIPMENT
INSTALLATION.
6 CONNECT ONE SIMPLEX L6-30R RECEPTACLE TO
CIRCUIT 2ALY6-24,26 AND ONE SIMPLEX L6-30R
RECEPTACLE TO CIRCUIT 2ALY6-36,38
7 CONDUITS SHALL ENTER FURNITURE FROM CEILING
THROUGH VERTICAL UTILITY CHASE PROVIDED
WITH FURNITURE.
8 3/4"C - 2#12 + 1#12 GND
9 PROVIDE HARDWIRED CONNECTION FOR GROSSING
STATION, JSN U2020AR.
10 CONNECT ONE RECEPTACLE PER CIRCUIT.
11 SEE DETAIL C1/NF-EP101 FOR THE DOOR BUZZER
CONNECTION DIAGRAM.
12 PROVIDE (4) 1" EMPTY CONDUITS STUBBED OUT
ABOVE CEILING.
13 3/4" C - 2#12 + 1#12 GND.
26 ASI #11 02/10/10 KGG
28 ASI #13 03/24/10 KGG