This memorandum responds to pre-proposal questions regarding solicitation FA442724Q0048 for mold abatement at Travis Air Force Base buildings 648 and 172. The contractor will remediate full wall mold in building 648 measuring 45 feet by 10 feet and all other areas at 5 foot height. In building 172, the contractor will install new drywall that is fire taped and painted minimum. The contractor is responsible for mold clearance. The drywall in both buildings does not contain asbestos, and lead was not detected in recent testing. The extent of work includes tear down, decontamination, and new drywall installation per the performance work statement. This will be a firm fixed price contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
60TH CONTRACTING SQUADRON (AMC)
7 March 2024
MEMORANDUM FOR RECORD
FROM: 60 CONS/PKA
SUBJECT: B648/B172 Mold Abatement Pre-proposal Request for Information (RFI)
1. Is the drywall in Bldg 648 BX or 172 Express asbestos containing? The drywall in 172 Express could also have lead in the paint. Reports reflect non detected for lead. The government will share the 2024 lead paint test result. This will be provided via DoD Safe link upon request from the contract specialist.
2. The drywall in Bldg. 648 BX is not finished, only fire taped. Are we adding new drywall to this area after mold remediation? If we are, will it only be fire tape? Or fire taped and finished?
Restore to same as before standards so taped and painted minimum.
3. Who will provide mold clearance, the contractor? Or are you providing? Contractor.
4. Do we use the same paint color on both locations? Yes. Off white.
5. You mentioned that the base may be using their own plumber to cut and cap plumbing. Can you confirm this? Contractor cap and seal.
6. You mentioned an asbestos test was conducted and the results would be made known. Can you provide the test? Reports reflect non detected for asbestos. The government will share the 2024 asbestos test result. This will be provided via DoD Safe link upon request from the contract specialist.
7. Can you let us know how many rooms need services and the size of those rooms? Contractor reviewed areas and approximate new SF is part of PWS.
8. The extent of the mold damage, i.e floors, walls, and ceilings? Full wall in B648 on left side of 45’ x 10’. All other areas are at 5 foot height.
9. Is the remediation just needed as in tear down and decontaminate all areas? And also install of new drywall per PWS.
10. Is there a fixed firm price amount?
- this will be a firm fixed price contract