Performance Work Statement
FOR
REPLACE EXISTING DISHWASHER UNIT, B317
AT
ALTUS AIR FORCE BASE, OKLAHOMA
29 APR 2019
FA441919Q0049
Attachment 1
FA441919Q0049
1. PURPOSE:
The purpose of this project is to demolish an existing conveyor type dishwasher unit in Building 317 and to provide and replace with a new conveyor type dishwasher unit.
2. PRINCIPAL FEATURES: The work to be accomplished consists of the following principal items. This does not mean that the work consists only of these items, but that it consists of these principal items along with all incidental minor work which is necessary to provide a complete and usable product and to accomplish the overall project in a satisfactory manner meeting the approval of the Contracting Officer.
a. Demolish existing dishwasher unit along with connected conveyor, electric booster heater, and disposal systems.
b. Ensure connections to the facility utilities remain in-tact for the connection of the new dishwasher unit.
c. Make necessary retrofits and consult with Base Civil Engineering to accommodate new dishwasher system if necessary.
d. Connect electrical booster heater (built‐in, 24kw, 70° rise, stainless steel, 208v/60/3‐ph) to the fitted facilities utilities connections.
e. Connect new conveyor type dishwasher (with prewash, high temperature, 64" [2] tank, 22" prewash, [278] racks/hour, automatic tank fill, stainless steel base & legs, insulated hinged access doors, door safety switch, door activated drain closure, vent fan control, stainless steel front & end enclosure panels, standard vertical clearance accommodates 18" x 26" sheet pans, energy sentinel [idle pump shutoff], rinse saver device, splash proof top mounted controls, NSF, UL, ENERGY STAR®, 1 year limited warranty [standard], consult factory, right to left operation, two‐point electrical connection [standard, 1a Machine & Tank heat, 1b Booster], 208v/60/3‐ ph, electric tank heat with thermostat & low‐water cutoff) to the fitted facilities utilities connections.
f. Connect interlocking conveyor (soiled tray conveyor with 90 degree configuration with guide rails, all stainless steel table construction [14 gauge 304], single 12” interlocking belt [for tray or tray-less operation], electrical control panel, drive cabinet with belt wash, bariable speed drive, 1 5/8’ diameter tubular legs and cross tubes, adjustable bullet feet, scrapping table [with trough integral to the tabling & conveyor belt, trough flows to disposer, double overhead rack shelf length of trough, 1 automatic rack loader, 2 trough covers, 1 wash down hose station, 1 pre rinse sink with rinse sprayer, 1 5/8” diameter tubular legs and cross tubes, adjustable bullet feet, stainless steel window frame and sill, sight and sound barrier with access doors], clean gravity roller table [1.9” gravity rollers, 1 5/8” diameter tubular legs and cross tubes with ajustable bullet feet, accumulation switch
FA441919Q0049
provided with dish machine]) to dishwasher machine and fitted utilities connections.
g. Connect disposal system (food waste conveying & disposing system with water recirculation, right‐hand operation, 5 HP disposer, with trough diffuser, salvage basin & silverware trap, stainless steel construction, with start/stop push button auto reversing control & safety line disconnect, 230V/60/3-ph, 16.2 amps, remote start/stop switch for all controls [HydroLogic control with operator sensor comes standard mounted to SM/PSM models. ONLY add if additional on/off control is required], stainless steel bolt-down flanges [for SM, PSM, TVL, TVR]) to the fitted facilities utilities connections.
h. Test to ensure proper functionality of the newly installed systems shall be required.
3. GENERAL:
a. All work on this delivery order shall be performed in accordance with general industry specifications for each type of work required. When work is not covered by industry specifications, said work shall be performed in accordance with the manufactures installation instructions or the most applicable industry standard for the type of work involved.
4. SUBMITTALS:
a. Manufacturer specifications
b. equipment manuals
c. warranty letter
ENVIRONMENTAL: Altus AFB has implemented an Environmental Management System (EMS) under the guidelines of ISO14001 and AFI 32-7001, Environmental Management. Every contract employee that will physically work on the installation is required to review and understand the Altus AFB Contractor EMS Awareness PowerPoint presentation. The training slides and general environmental guide are accessible on the Altus AFB off-base website at http://www.altus.af.mil/altusafbenvironmentalnews.asp. These slides and guide provide a general overview of the wing's EMS plus provide specifics on some potential environmental impacts associated with generic contract work. Any new or replacement employee shall receive this training prior to commencing work on Altus AFB. Proof of completion shall be forwarded to the COR no later than five (5) business days from the day the employee begins work. Questions regarding the training and alternative means to complete the training should be addressed to 97 CES/CEIEC, 481- 6221.
AT Clause. Altus Air Force Base has an antiterrorism program that is responsible for helping secure and protect the base and its personnel from terrorist attacks. As a contractor working on Altus Air Force Base, you and your sub-contractors are required to obey all orders from Security Forces, and adhere to all security measures implemented as
FA441919Q0049
a result of Force Protection Condition changes (security posture changes). Additionally, you and your sub-contractors are expected to report to base security forces any suspicious activities, packages, or items you see while conducting work on Altus Air Force Base.
Suspicious activities could include personnel conducting surveillance of the installation, unauthorized personnel requesting access to the installation, or somebody asking a lot of questions about the base. In an effort to help familiarize you, your employees, and subcontractors about antiterrorism, Altus Air Force Base has an antiterrorism binder with all of the pertinent information for awareness training available for review at the Pass and Registration Office located at the south gate (building #428) of Altus Air Force Base, Oklahoma.
SECURITY REQUIREMENTS. The contractors will comply with Base Security Requirements at all times to include: Base Pass Requirements, personnel security clearance. A DoD employee ID card holder will act as escort from the base main gate to the facility and return when the installation is complete. The contractor will not be allowed to travel to other area of the base without a DoD employee escort.
END of PWS