Statement of Work - VR-8 HAAS Repairs-Upgrade.docx

DOCX document 18 KB Posted

Attached to
VR-8 HAAS Repair - Upgrade
Solicitation number
FA441827HAAS
Issued by

About this file

This is a Statement of Work for the repair, upgrade, calibration, and training of a Haas VR-8 Machining Center located at the 437th Maintenance Squadron, Metals Technology Section, at Joint Base Charleston, South Carolina. The contractor shall complete all work within 30 calendar days from contract award and must provide removal and replacement of the carousel, bushings, shock, and spindle (4 service days); furnishing and installation of a 15-inch mill pendant/Maincon upgrade kit with Ethernet interface and remote jog handle touch LCD (3 service days); functional testing of all components; 2 days of on-site applications support for pivot-point calibration and personnel training; ground freight shipping for all parts; and a 90-day service and parts warranty. The contractor is responsible for supplying all parts, materials, labor, tools, equipment, transportation, and technical supervision necessary to return the machining center to fully functional status.

The related Pre-Solicitation indicates the Air Force is considering this requirement for a competitive 100 percent small business set-aside under NAICS code 811310 (Machinery Repair and Maintenance Services) with a small-business size standard of $12,500,000. A firm-fixed-price contract is contemplated, and all prospective contractors must be registered in the System for Award Management (SAM) at the time of award. Acceptance criteria include successful machine operation, completion of training, delivery compliance with specifications, and submission of required documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement/Performance of Work HAAS VR-8 Machining Center Repair/Upgrade/Calibrate

1. Objective To perform four days of service labor to replace carousel, bushings, shock, and spindle and test machine functions. To acquire parts to upgrade the mill pendant / Maincon upgrade kit, ethernet interface, and remote jog handle and upgrade maincon PN: MCU3 -- 3 day of service to install kit. They will also have to send an application tech for two days of applications support to calibrate pivot point and train POC. These repairs, upgrade, and calibration will return the VR-8 Haas Machining Center back to fully functional.

2. Scope of Work The contractor shall provide all parts for mill pendant / maincon upgrade kit, ethernet interface, remote jog handle touch LCD, three days service labor for Maincon upgrade (part# MCU3), four service days of labor, two days of application support to calibrate pivot point and training necessary to supply a fully functional VR-8 Haas Machining Center that meets the salient characteristics outlined below.

3. Requirements The repair, upgrade and calibration must meet the following minimum specifications:

· 2 service days to remove/replace carousel, bushings and shock, - then test machine functions

· 2 service days to remove/replace spindle and test machine functions

· Supply upgrade parts – 15in Mill pendant / Maincon upgrade kit, Ethernet interface, and remote jog handle touch LCD.

· 3 service day to remove/install Maincon Upgrade kit (part# MCU3) and test machine functions.

· 2 applications Support days Tech to recalibrate pivot point and train POC.

· Shipping ground freight for parts

4. Deliverables

· Parts for 15in Mill pendant / Maincon upgrade kit, Ethernet interface, and remote jog handle touch LCD

· 3 days of service charge for maincon upgrade (part # MCU3)

· 4 days of service charge to remove and replace parts and test machine functions.

· 2 days of applications support to calibrate pivot point

· On-site training for designated personnel

· 90-day service and parts warranty

5. Period of Performance The contractor shall complete delivery and training within 30 calendar days from the date of contract award.

6. Place of Performance 437th MXS, Metals Technology Section, Bldg 536 Rm 132 201 N. Bates St, N. Charleston, SC 29404

7. Acceptance Criteria The parts will be inspected upon delivery to ensure compliance with specifications. Acceptance will be based on successful operation, training completion, and documentation provided.

File details come from the government source that posted it. Updated .