5. SOW-BEE Boat Repair.pdf

PDF 13 MB Posted

Attached to
Combined Synopsis/Solicitation "Bee" Boat Repair
Solicitation number
FA441824Q0086
Issued by

About this file

This document is a Statement of Work (SOW) for the repair of the "BEE" boat. The related federal contract opportunity is a combined synopsis/solicitation for commercial services, solicitation number FA441824Q0086, issued by the Department of the Air Force Air Mobility Command.

The contractor shall provide supplies and services to repair the "BEE" boat in accordance with the SOW. The services have a Period of Performance of 90 Calendar days after receipt of award. This is a 100% Small Business Set-Aside with a NAICS code of 336611 - Ship Building and Repairing, with a size standard of 1,300 Employees. The delivery/transport FOB point is Joint Base Charleston Naval Weapons Station.

View the file

Other files

File Type Posted
1. Combo-BEE Boat Repair.pdf PDF
4. Wage Determinations.pdf PDF
3. Provisions and Clauses.pdf PDF
2. RFQ Pricing Sheet.pdf PDF
1. Combo-BEE Boat Repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

“BEE” BOAT REPAIR

General:

All components provided and installed by vendor must be compatible with the make and model:

• Aluminum Chambered Boats: 2004 Model: NOO24-04-2209

Service Will Include:

1. Removal of currently installed engines, fuel lines, wires, and steering system.

2. Repair and replacement of any damaged assemblies/connections pertaining to all parts removed by vendor.

3. Installation of all equipment IAW Performance Work Statement.

4. All equipment will be installed per manufacturers specifications.

5. Standards for new equipment will follow EPA guidelines for emissions.

6. Standards for safe boat operation will be IAW COLREGS .

7. The vendor will repair the "BEE' Boat at their facility.

8. The vendor will provide the transport of the "BEE" boat to and from their facility.

9. The vendor will provide a parts warranty IAW manufacturer specifications.

10. The vendor will provide a 12 Month Service Warranty.

Engines:

• 2 Each Engines IAW the following:

• 4-Stroke

• 150 House-power

• Stainless Steel Propellor

• Port Engine-Clockwise

• Starboard Engine- Counterclockwise

• Tilting motor for lifting engines

• Gasoline (typically ethanol free premium)

• Any color (Engines must be matching in color)

Steering:

• Provided steering components will be compatible with provided engines

• Components will be comprised of standard steering material rated for seawater contact.

• Components will be coated by a standard coating rated for seawater contact.

• See sketches below for placement reference

Wiring:

• The boat is 26 Feet in length.

• Wiring will connect Gauge cluster, VHF radio, Standard Navigation lights, Horn/loudspeaker, Trim motors, engine

• Wiring will be compatable with 2 separate Optima Bluetop 12V marine batteries (one for each engine) with manual paralleling capability

Fuel Lines:

• Fuel Type-Gasoline (typically ethanol free premium)

• System components be compatible with provided engines

• Material-Any seawater contact rated fuel system components.

Gauges:

• Gauges will be Digital LED

• Quantity and Size:

1 Each Fuel 2-1/8” (54mm) 2 Each Trim/Tilt 2-1/8” (54mm) 2 Each Water pressure 2-1/8” (54mm) 2 Each Voltmeter 2-1/8” (54mm) 2 Each Hour meter 2-1/8” (54mm) 2 Each Tachometers 3-3/8” (86mm).

(Will include trouble light cluster for “NO OIL” “HOT” “CHK ENG” and “LOW OIL”.) 1 Each boat speed gauge (Knots)

2 Each Engine RPM gauges (RPM) 2 Each Water temperature gauges (Degrees F) 2 Each Oil Pressure gauges (PSIG) 2 Each Run hours (hours to one decimal place)

2 Each Engine trim meters (visual UP/DOWN display)

Performance Work Statement-Bee Boat Repair-Mowrey Edit.pdf
Salient Characteristics-Bee Boat Repair-Mowrey Edit.pdf
Boat Diagram Binder-Mowrey Edit.pdf
Bee Drawing 1 (cover)
Bee Drawing 2 geomety details
Bee Drawing 3 gauge electric
Bee Drawing 4 Console electric
Bee Drawing 5 Fuel tank
Bee Drawing 6 Hull construction
Bee Drawing 7 Frame profile
Bee Drawing 8 Frame profile
Bee Drawing 9 CC arrangment
Bee Drawing 10 CC profile
SOW EDit 0906.pdf
PERFORMANCE WORK STATEMENT “BEE” BOAT REPAIR

File details come from the government source that posted it. Updated .