FA4418AREAF Questions and Answers.pdf
PDF 126 KB Posted
- Attached to
- Repair IMC Pavements - Area F
- Solicitation number
- FA441821AREAF
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Figure 2 - Monitoring wells.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4418AREAF Questions and Answers
1. Does this effort have an incumbent Contractor? If so, please provide name and contract number.
a. There is no incumbent for this requirement.
2. Please provide Figure 2 as mentioned in the following paragraph: ii. Several monitoring wells are in pavements to be removed. Coordinate with 628 CES/CEV to determine proper means/methods for replacing pavements without disturbing wells. May require SCDHEC approval which CEV will be responsible for obtaining. See attached, Figure 2, showing locations of active and abandoned monitoring wells in the vicinity of Building 578.
a. Figure 2 has been added as an attachment.
3. Although the SF330 Sec F allows for 10 projects, can you confirm that you are requesting a maximum of five (5) projects?
a. The maximum is five (5) projects.
4. Can proposals be sent via DoD SAFE instead of being hand delivered or mailed?
a. Only modification/revisions will be accepted via DoD SAFE. Proposals must be hand delivered or mailed.
5. We understand that the project includes the design of airfield pavements. Will the project also include building design? If not, should the following be dismissed?
- “Building Information Modeling (BIM), design-build conceptual designs, interior design for furniture and equipment, energy modeling and Life Cycle Cost Analyses, seismic retrofit design, building commissioning services and preparation of operating and design manuals. seismic assessments, interior facility functional/relational offices compatibility studies” (Page 8/12)
- “f. Knowledge and application of the minimum DOD Antiterrorism Standards for Buildings.”
(page 9/12)
- “g. Knowledge and application of sustainable design principles, including prescribing the use of recovered materials and achieving waste reduction and energy efficiency in site, facility, and landscape design. It is preferred that key personnel hold current LEED certification.” (page 9/12)
- “2. SPECIALIZED EXPERIENCE UFC 3-535-01 (Visual Air Navigation Facilities).” (Page 9/12)
a. This project will not include building design. However, the qualifications listed should not be dismissed.
File details come from the government source that posted it. Updated .