Attch_7_-_16-R-0011_-_32_01_90_Resealing_of_Joints_in_Rigid_Pavement.pdf
PDF 35 KB Posted
- Attached to
- Rubber Removal and Paint Striping
- Solicitation number
- FA4418-16-R-0011
About this file
Attachment 7 - FA4418-16-R-0011 - Spec Section 32 01 19 Resealing of Joints in Rigid Pavement
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 01 19
RESEALING OF JOINTS IN RIGID PAVEMENT
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C603 (2004; R 2008) Extrusion Rate and Application Life of Elastomeric Sealants
ASTM C639 (2001; R 2011) Rheological (Flow) Properties of Elastomeric Sealants
ASTM C661 (2006; R 2011) Indentation Hardness of Elastomeric-Type Sealants by Means of a Durometer
ASTM C679 (2003; E 2009; R 2009) Tack-Free Time of Elastomeric Sealants
ASTM C719 (2013) Adhesion and Cohesion of Elastomeric Joint Sealants Under Cyclic Movement (Hockman Cycle)
ASTM C792 (2004; R 2008) Effects of Heat Aging on Weight Loss, Cracking, and Chalking of Elastomeric Sealants
ASTM C793 (2005; R 2010) Effects of Accelerated Weathering on Elastomeric Joint Sealants
ASTM D412 (2006a; R 2013) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS SS-S-200 (Rev E; Am 1; Notice 1) Sealant, Joint, Two-Component, Jet-Blast-Resistant, Cold-Applied, for Portland Cement Concrete Pavement
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with contract requirements:
FA4418-16-R-0011
Attachment 7
Attachment 7
SD-03 Product Data
Joint sealant
Submit catalog cuts, specifications, material Safety Data Sheets and other information documenting conformance to contract requirements.
SD-04 Samples
Joint filler
Joint backer rod
SD-07 Certificates
Equipment list
SD-08 Manufacturer's Instructions
Joint sealant
Instructions shall include, but not be limited to: storage requirements, ambient temperature and humidity ranges, and moisture condition of joints for successful installation;
requirements for preparation of joints; safe heating temperature;
mixing instructions; installation equipment and procedures;
application and disposal requirements; compatibility of sealant with filler material; curing requirements; and restrictions to be adhered to in order to reduce hazards to personnel or to the environment. Submit instructions at least 30 days prior to use.
1.3 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the site for visible damage, and unload and store with a minimum of handling. Joint materials shall be delivered in original sealed containers and shall be protected from freezing or overheating. Provide jobsite storage facilities capable of maintaining temperature ranges within manufacturers recommendations.
1.4 ENVIRONMENTAL REQUIREMENTS
Work shall not proceed when weather conditions detrimentally affect the quality of cleaning joints or applying joint sealants. Joint preparation and sealing shall proceed only when weather conditions are in accordance with manufacturer's instructions. During installation, surfaces shall be dry and sealant and bond breakers shall be protected from moisture.
1.5 TRAFFIC CONTROL
Do not permit vehicular or heavy equipment traffic on the pavement in the area of the joints being sealed during the protection and curing period of the joint sealant. At the end of the curing period, traffic may be permitted on the pavement when approved.
1.6 EQUIPMENT
Submit a equipment list and description of the equipment to be used and a statement from the supplier of the joint sealant that the proposed equipment is acceptable for installing the specified sealant. Equipment for heating, mixing, and installing joint seals shall be in accordance with the instructions provided by the joint seal manufacturer. Furnish equipment, tools, and accessories necessary to clean existing joints and install liquid joint sealants. Maintain machines, tools, and other equipment in proper working condition.
1.6.1 Joint Cleaning Equipment
1.6.1.1 Routing Tool
To remove old sealant from joints, select rectangular shaped routing tool that is adjustable to varying widths and depths required. The equipment shall be capable of maintaining accurate cutting depth and width control.
The joint plow shall be equipped with a spring or hydraulic mechanism to release pressure on the tool prior to spalling the concrete.
1.6.1.2 Concrete Saw
Self-propelled power saw with diamond saw blades designed for sawing, refacing, widening, or deepening existing joints as specified without damaging the sides, bottom, or top edge of joints. Blades may be single or gang type with one or more blades mounted in tandem for fast cutting.
Select saw adequately powered and sized to cut specified opening with not more than two passes of the saw through the joint.
1.6.1.3 Sandblasting Equipment
Commercial type capable of removing residual sealer, oil, or other foreign material. Equipment shall include an air compressor, hose and nozzles of proper size, shape, and opening. Attach an adjustable guide that will hold the nozzles aligned with the joint to effectively and efficiently clean without damage to concrete edges. Adjust height, angle of inclination, or size of nozzles to sandblast joint faces and not bottom of joint.
1.6.1.4 Air Compressor
Portable air compressor capable of operating the sandblasting equipment and capable of blowing out sand, water, dust adhering to sidewalls of concrete, and other objectionable materials from the joints. The compressor shall furnish air at a pressure not less than 90 psi and a minimum rate of 150 cubic feet of air per minute at the nozzles and free of oil.
1.6.1.5 Vacuum Sweeper
Self-propelled, vacuum pickup sweeper capable of completely removing loose sand, water, joint material, and debris from pavement surface.
1.6.1.6 Hand Tools
When approved, hand tools such as brooms and chisels may be used in small areas for removing old sealant from joints and repairing or cleaning the joint faces.
1.6.2 Joint Sealing Equipment
Joint sealing equipment shall be of a type required by the joint seal manufacturer's installation instructions. Equipment shall be capable of installing sealant to the depths, widths and tolerances indicated. When malfunctions are noted, joint sealing shall not proceed until they are corrected.
1.6.2.1 Equipment for Silicone Sealant
Equipment for silicone sealant shall be air powered pump, components, and hoses as recommended by the sealant manufacturer. Hoses and seals shall be lined to prevent moisture penetration and withstand pumping pressures.
Equipment shall be free of contamination from previously used or other type sealant.
1.7 SAFETY PROVISIONS
In accordance with the provisions of the contract respecting "Accident Prevention," the Contractor shall take appropriate measures to control worker exposure to toxic substances during the work. Provide personnel protective equipment as required. Material Safety Data Sheets (Department of Labor Form OSHA-20 or comparable form) shall be available on the site.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Joint Sealant
2.1.1.1 Single Component Cold-Applied Silicone
Silicone sealant shall be self leveling, non-acid curing, and meet the following requirements:
TEST TEST METHOD REQUIREMENTS
Weight Loss ASTM C792 Modified (see note 1 below)
10 percent max.
Flow ASTM C639 (Type I) smooth and level
Extrusion Rate ASTM C603 30 sec. max.
Tack Free Time ASTM C679 5 hours max.
Hardness (Shore 00) (see note 2 below)
ASTM C661 30 - 80
Tensile Stress at 150 Percent Elongation (see note 2 below)
ASTM D412 (Die C) 30 psi max.
Percent Elongation (see note 2 below)
ASTM D412 (Die C) 700 min.
Accelerated Weathering ASTM C793 pass 5000 hours
Bond and Movement Capability
ASTM C719 pass 10 cycles at plus 50 percent movement (no adhesion or cohesion failure)
Flame Resistance FS SS-S-200 pass
Notes:
1. Percent weight loss of wet (uncured) sample after placing in forced-draft oven maintained at 158 degrees plus 1 degrees F for two hours.
2. Specimen cured 21 days at 73 degrees plus 1 degree F and 50 percent plus 5 percent humidity.
ACCELERATED WEATHERING FACTORY TEST REPORT. For the Accelerated Weathering test, in lieu of testing of actual joint sealant to be used on the project, a report of a factory test, performed within two years of contract award, may be submitted.
2.1.2 Primers
Select concrete primer recommended by the manufacturer of the proposed liquid joint sealant.
2.1.3 Bond Breakers
2.1.3.1 Blocking Media
Compressible, nonshrinkable, nonreactive with joint sealant and nonabsorption type such as plastic backer rod, free of oils or bitumens.
Blocking media shall be consistent with the joint seal manufacturer's installation instructions and be at least 25 percent larger in diameter than the width of the cleaned and re-faced joints as shown.
PART 3 EXECUTION
3.1 JOINT PREPARATION
Unless otherwise indicated, remove existing material, saw, clean and reseal joints. Do not proceed with final cleaning operations by more than one working day in advance of sealant. Thoroughly clean joints by removing existing joint sealing compound, bond-breakers, dirt, and other foreign material with the equipment specified herein, but not limited thereto.
Cleaning procedures which damage joints or previously repaired patches by chipping or spalling will not be permitted. Remove existing sealant to the required depth as indicated. Precise shape and size of existing joints vary, and conditions of joint walls and edges vary and include but are not limited to rounding, square edges, sloping, chips, voids, depressions, and projections.
3.1.1 Removal of Existing Material
Remove from the joint the existing sealants by using the specified routing tool. After cutting free the existing sealant from both joint faces, remove sealant to the depth required to accommodate the bond breaking material and to maintain the specified depth for the new sealant. For expansion joints, remove existing sealant to a depth of not less than one inch. When existing preformed expansion-joint material is more than one inch below the surface of the pavement, remove existing sealant to the top of the preformed joint filler. For joints other than expansion joints, remove in-place sealant to the depth as indicated. At the completion of routing operations, clean pavement surface with vacuum sweeper and clean the joint opening by blowing with compressed air. Protect previously cleaned joints from being contaminated by subsequent cleaning operations.
3.1.2 Refacing of Joints
Reface concrete joint walls. Refacing shall be by power-driven concrete saw specified herein to remove residual sealant and a minimum of concrete.
Removal shall provide exposure of newly clean concrete. Remove burrs and irregularities from sides of joint faces. Immediately after sawing each joint, thoroughly clean saw cut and adjacent concrete surface. Flush with water under pressure, simultaneously blowing water out with compressed air until debris is removed from the joint. Protect adjacent previously cleaned joint spaces from receiving water and debris during the cleaning operation.
[3.1.2.1 Joint Widening (Except Expansion Joints)
Saw joints having grooves less than 3/8 inch wide and less than one inch deep to a minimum width of 3/8 inch and to a minimum depth of one inch.
]3.1.3 Final Cleaning of Joints
3.1.3.1 Sandblasting Cleaning
Following removal of existing sealant, and sawing, and immediately before resealing, thoroughly clean newly exposed concrete joint faces and pavement surface extending up to 2 inches from each joint edge by sandblasting until concrete surfaces in the joint space are free of sealants, dust, dirt, water and other foreign materials which would prevent bonding of new sealants to the concrete. Use sand particles of the proper size and quality for the work. Perform sandblasting with specified nozzles, air compressor, and other appurtenant equipment. Position nozzles to clean the joint faces. Make at least two passes; one for each joint face. Make as many passes as required for proper cleaning. Immediately prior to sealing the joint, blow out the joint spaces with compressed air until completely free of sand, water, and dust. Joints shall be dry before installation of joint sealant. Replace expansion joint filler material damaged in performing the work with new materials of the same type and dimensions as the existing material, or with appropriate blocking media.
3.1.4 Bond Breaker
At the time the joints receive the final cleaning and are dry, install bond breaker material as indicated with a steel wheel or other approved device.
3.1.4.1 Blocking Media (Backer Rod) (Except for Expansion Joints)
Plug or seal off the lower portion of the groove by installing the specified blocking media as indicated.
3.1.5 Rate of Progress
The final stages of joint preparation, which include placement of bond breakers, if required, shall be limited to only that length of joint that can be resealed during the same workday.
3.1.6 Disposal of Debris
Sweep from pavement surface to remove excess joint material, dirt, water, sand, and other debris by vacuum sweepers or hand brooms. Remove the debris immediately.
3.2 INSTALLATION OF SEALANT
3.2.1 Test Section
Install a test section of 200 linear feet at the start of the sealing operation for each type sealant to be used. Test section shall meet contract requirements. The Contracting Officer shall be notified upon completion of the test section.
3.2.2 Time of Application
After approval of the test section, seal joints immediately following final cleaning and placing of bond breakers. Commence sealing joints when walls are dust free and dry, and when weather conditions meet joint seal manufacturer's instructions. If the above conditions cannot be met, or when rains interrupts sealing operations, reclean and permit the joints to dry prior to installing the sealant.
3.2.3 Sealing the Joints
Do not install joint sealant until joints to be sealed have been inspected and approved. Install bond breaker just prior to pouring sealant. Fill the joints with sealant from bottom up until joints are uniformly filled solid from bottom to top using the specified equipment for the type of sealant required. Fill joints to 1/4 inch below top of pavement within tolerances as indicated, and without formation of voids or entrapped air.
Except as otherwise permitted, tool the sealant immediately after application to provide firm contact with the joint walls and to form the indicated sealant profile below the pavement surface. Remove excess sealant that has been inadvertently spilled on the pavement surface.
Check sealed joints frequently to assure that newly installed sealant is cured to a tack-free condition within 5 hours. Protect new sealant from rain during curing period.
3.3 FIELD QUALITY CONTROL
3.3.1 Joints
Inspect and approve joints which have been cleaned and have backer rods or bond breaking tape installed prior to sealing.
3.3.2 Joint Seal Test Section
Inspect joint seal test section. Correct deficiencies and obtain approval of test section by the Contracting Officer prior to installing joint seals.
3.3.3 Joint Sealer
Inspect installed joint seals for conformance to contract requirements, joint seal manufacturer's instructions, and the test section. Obtain approval for each joint seal installation.
3.4 ACCEPTANCE
Reject joint sealer that fails to cure properly, or fails to bond to joint walls, or reverts to the uncured state, or fails in cohesion, or shows excessive air voids, blisters, surface defects, swelling, or other deficiencies, or is not properly recessed within indicated tolerances.
Remove rejected sealer and reclean and reseal joints in accordance with the specification. Perform removal and reseal work promptly by and at the expense of the Contractor.
-- End of Section --