About this file
Revised Price Schedule for Base Yr and Option Yrs 1-4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4418-08-R-0001 Amendment 2.pdf | ||
| Price Schedule - Paving - 7 Aug 08.xls | XLS spreadsheet | |
| Paving Q A - 7 Aug 08.pdf | ||
| Amendment 1 - Attachment 1 - Addendum 1.pdf | ||
| SF30 - Amendment 1.pdf | ||
| Solicitation.doc | DOC document | |
| Attachment 2.pdf | ||
| Attachment 4.pdf | ||
| Attachment 1.pdf | ||
| Attachment 3.pdf | ||
| Ammendment-Pre-Sol.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| GENERAL NOTES | |||||
| 1 | Quanities are presented for bid evaluation purposes only. | ||||
| 2 | Include all direct and indirect costs and expenses required to complete the work in an acceptable manner. | ||||
| 3 | This contract incorporates SCDOT standard highway construction requirements. References to SCDOT requirements shall be to the SCDOT 2007 Standard Specifications for Highway Construction | ||||
| ITEM NO | DESCRIPTION | QTY(1) | UNIT | UNIT COST(2) | AMOUNT |
| EARTHWORK & DEMOLITION (SCDOT § 200) | |||||
| 200-01 | Clear and Grub, including removal & disposal of material (SCDOT § 201) | 10 | SY | $0.00 | |
| 200-02 | Saw cut asphalt pavement (SCDOT § 202) | 150 | IF(b) | $0.00 | |
| 200-03 | Removal & disposal of asphalt pavement, 2" thickness or greater, including hauling (SCDOT § 202)(a) | 600 | SY | $0.00 | |
| 200-04 | Saw cut Portland cement concrete pavement (SCDOT § 202) | 300 | IF(b) | $0.00 | |
| 200-05 | Removal & disposal of Portland cement concete pavement, including hauling (SCDOT § 202) | 10 | CY | $0.00 | |
| 200-06 | Removal & disposal of brick pavement, including hauling (SCDOT § 202) | 1 | SY | $0.00 | |
| 200-07 | Removal & disposal of curb and gutter, including hauling (SCDOT § 202) | 400 | LF | $0.00 | |
| 200-08 | Removal & disposal of pipes, headwalls, manholes inlets, guardrails, structures and other obstructions, including hauling (SCDOT § 202) | 9 | CY | $0.00 | |
| 200-09 | Stripping & replacing topsoil (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-10 | Unclassified excavation (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-11 | Excavation, trench, to 4' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-12 | Excavation, trench, 4' to 6' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-13 | Excavation, trench, 6' to 8' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-14 | Surplus soil material hauling & off-site disposal (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-15 | Removal & off-site disposal of contaminated soil, including hauling (SCDOT § 202) | 1 | TON | $0.00 | |
| 200-16 | Provide borrow material, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-17 | Provide borrow AASHTO A-3 clean sand, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-18 | Site grading & compaction (SCDOT § 203) | 800 | SY | $0.00 | |
| 200-19 | Backfilling for embankment construction, including compaction (SCDOT § 205) | 20 | CY | $0.00 | |
| 200-20 | Backfilling trenches, holes & pits, including compaction (SCDOT § 205) | 30 | CY | $0.00 | |
| 200-21 | Subgrade fine grading, compaction & proof rolling (SCDOT § 208) | 600 | SY | $0.00 | |
| 200-22 | Flowable fill (SCDOT § 210) | 10 | CY | $0.00 | |
| 200-23 | Stabilization fabric, polypropylene | 200 | SY | $0.00 | |
| 200-24 | Stabilization material, Geogrid (Tensar 1100 or apprvoed equal) | 200 | SY | $0.00 | |
| 200-25 | Soil contamination testing | 1 | EA | $0.00 | |
| Notes: | |||||
| (a) | Areas of asphalt pavement with a total thickness less than 2 inches not included as they shall be included in the Unclassified Excavation line item. | ||||
| (b) | Inch Feet (Inch of sawcut depth multiplied by linear feet of sawcut run) | ||||
| (c) | Line item includes bringing the material to the site. Costs for placing and compacting the material is covered under Backfilling & embankment construction. | ||||
| BASE COURSES (SCDOT § 300) | |||||
| 300-01 | Cement Modified Subbase (SCDOT § 301)(a) | 100 | CY | $0.00 | |
| 300-02 | Portland cement for cement modified subbase (SCDOT § 301) | 7 | TON | $0.00 | |
| 300-03 | Macadam graded aggregate base course (SCDOT § 305)(b) | 300 | CY | $0.00 | |
| 300-04 | Marine limestone graded aggregate base course (SCDOT § 305)(b) | 200 | CY | $0.00 | |
| 300-05 | Recycled Portland cement concrete base course (SCDOT § 305)(b) | 100 | CY | $0.00 | |
| Notes: | |||||
| (a) | Portland cement material cost not included. Material cost covered separately by Portland cement for cement modified subbase line item. | ||||
| (b) | Includes hauling from off-site, placing, compaction, rolling & finishing | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 400-01 | Type A HMA Surface Course (SCDOT § 401)(a) | 65 | TON | $0.00 | |
| 400-02 | Type B HMA Surface Course (SCDOT § 401)(a) | 65 | TON | $0.00 | |
| 400-03 | Type C HMA Surface Course (SCDOT § 401)(a) | 65 | TON | $0.00 | |
| 400-04 | Prime coat application, EAP-Special (SCDOT § 401/305/407) | 600 | SY | $0.00 | |
| 400-05 | Tack coat application, emulsified asphalt (SCDOT § 401) | 600 | SY | $0.00 | |
| 400-06 | Sealcoat, Fog Seal, 2 Coats | 600 | SY | $0.00 | |
| Notes: | |||||
| (a) | Material and hauling costs only. Placing and compacting costs included in Section 401 Line items. | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS NOT PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 401-01 | Asphalt Paving, Parking Lots & Driveways (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-02 | Asphalt Paving, roads & other mainline paving applications (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-03 | Full Depth Asphalt Patching (SCDOT § 401)(a) | 3,000 | SY-Inch | $0.00 | |
| 401-04 | Asphalt paving, bike lanes & jogging trails, 2" thick, single lane less than 8' wide (SCDOT § 401)(a) | 2,000 | SY | $0.00 | |
| 401-05 | Milling existing asphalt pavement, 1" to 3", including suface cleaning (SCDOT § 401) | 2,500 | SY | $0.00 | |
| 401-06 | Asphalt surface treatment, single treatment (SCDOT § 406) | 400 | SY | $0.00 | |
| 401-07 | Patch with cold mix asphalt surface course, Type 1 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-08 | Patch with cold mix asphalt surface course, Type 2 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-09 | Crack routing/sealing, up to 1" wide cracks | 3,000 | LF | $0.00 | |
| 401-10 | Crack routing/sealing, 1" to 2" wide cracks | 1,000 | LF | $0.00 | |
| $0.00 | |||||
| Notes: | |||||
| (a) | Hot mix asphalt material and hauling costs included in Section 400 Line items. Prime and tack coat application costs included in Section 400 Line items. | ||||
| CONCRETE PAVEMENTS (SCDOT § 500) | |||||
| 500-01 | Portland cement concrete pavement, 6" thick (SCDOT § 501) (a) | 800 | SY | $0.00 | |
| 500-02 | Portland cement concrete pavement, 8" thick (SCDOT § 501) (a) | 600 | SY | $0.00 | |
| 500-03 | Portland cement concrete pavement, 10" thick (SCDOT § 501) (a) | 400 | SY | $0.00 | |
| 500-04 | Provide welded wire fabric in odd-shaped slabs (SCDOT § 501) | 500 | SY | $0.00 | |
| 500-05 | Clean & reseal joints in concrete pavement with silicone sealants (SCDOT § 504) | 7,500 | LF | $0.00 | |
| 500-06 | Rout, clean & silicone seal random cracks 1/8" to 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| 500-07 | Rout, clean & silicone seal random cracks over 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| Notes: | |||||
| (a) | Use either a slipform paver or a self-contained, self-propelled, fixed form paver requiring no external tractive force and capable of consolidating the full width and depth of the concrete pavement in one pass. Provide doweled construction joints, silicone joint seals over circular backer rods, steel forms except in fillets and liquid membrane forming curing compounds. Concrete material costs covered separately under Section 700. | ||||
| TEMPORARY TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 600-01 | Traffic control plan, per location | 1 | EA | $0.00 | |
| 600-02 | Standard Traffic Cones (SCDOT § 603) | 30 | EA | $0.00 | |
| 600-03 | Portable Plastic Drums (SCDOT § 603) | 5 | EA | $0.00 | |
| 600-05 | Type I Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-06 | Type II Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-07 | Type III Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-08 | Construction Sign, 36" by 36", Tripod Mounted (SCDOT § 605) | 2 | EA | $0.00 | |
| 600-09 | Construction Sign, 36" by 36", Post Mounted (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-10 | Construction Sign, Mounted to Barricade (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-11 | Concrete Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-12 | Water Filled Polyethylene Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-13 | Trailer-Mounted Electric Changeable Message Sign, 5 day minimum (SCDOT § 606) | 5 | DY | $0.00 | |
| 600-14 | Supplemental Warning Lights, Type A flashing light (SCDOT § 608) | 20 | EA | $0.00 | |
| 600-15 | Supplemental Warning Lights, Type B flashing light (SCDOT § 608) | 10 | EA | $0.00 | |
| 600-16 | Temporary Pavement Markings, 4" broken lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-17 | Temporary Pavement Markings, 4" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-18 | Temporary Pavement Markings, 12" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-19 | Temporary Pavement Markings, 24" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-20 | Flagman (SCDOT § 610) | 16 | HR | $0.00 | |
| PERMANENT TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 601-01 | Pavement Markings, 4" white broken lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-02 | Pavement Markings, 4" white solid lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-03 | Pavement Markings, 8" white solid lines, fast dry paint (SCDOT § 625) | 200 | LF | $0.00 | |
| 601-04 | Pavement Markings, 12" white solid lines, fast dry paint (SCDOT § 625) | 20 | LF | $0.00 | |
| 601-05 | Pavement Markings, white single arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-06 | Pavement Markings, white combination arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-07 | Pavement Markings, white "ONLY" word message, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-08 | Pavement Markings, white lane drop arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-09 | Pavement Markings, handicap symbol, fast dry paint (SCDOT § 625) | 4 | EA | $0.00 | |
| 601-10 | Pavement Markings, 4" yellow broken lines, fast dry paint (SCDOT § 625) | 500 | LF | $0.00 | |
| 601-11 | Pavement Markings, 4" yellow solid lines, fast dry paint (SCDOT § 625) | 2,000 | LF | $0.00 | |
| 601-12 | Pavement Markings, 6" yellow solid lines on curb (top & face), fast dry paint (SCDOT § 625) | 200 | LF | $0.00 | |
| 601-13 | Pavement Markings, wheel stops, solid yellow on all exposed faces, fast dry paint (SCDOT § 625) | 20 | EA | $0.00 | |
| 601-14 | Pavement Markings, 4" blue solid lines, fast dry paint (SCDOT § 625) | 80 | LF | $0.00 | |
| 601-15 | Pavement Markings, 6" red solid lines, fast dry paint (SCDOT § 625) | 40 | LF | $0.00 | |
| 601-17 | Pavement Markings, 6" red solid lines on curb (top & face), fast dry paint (SCDOT § 625) | 40 | LF | $0.00 | |
| 601-18 | Pavement Markings, 4" white broken lines, thermoplastic (SCDOT § 627) | 1,000 | LF | $0.00 | |
| 601-19 | Pavement Markings, 4" white solid lines, thermoplastic (SCDOT § 627) | 1,000 | LF | $0.00 | |
| 601-20 | Pavement Markings, 8" white solid lines, thermoplastic (SCDOT § 627) | 200 | LF | $0.00 | |
| 601-21 | Pavement Markings, 12" white solid lines, thermoplastic (SCDOT § 627) | 20 | LF | $0.00 | |
| 601-22 | Pavement Markings, white single arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-23 | Pavement Markings, white combination arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-24 | Pavement Markings, white "ONLY" word message, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-25 | Pavement Markings, white lane drop arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-26 | Pavement Markings, white 12"x18" triangular yield bar, thermoplastic (SCDOT § 627) | 24 | LF | $0.00 | |
| 601-27 | Pavement Markings, handicap symbol, thermoplastic (SCDOT § 627) | 4 | EA | $0.00 | |
| 601-28 | Pavement Markings, 4" yellow broken lines, thermoplastic (SCDOT § 627) | 500 | LF | $0.00 | |
| 601-29 | Pavement Markings, 4" yellow solid lines, thermoplastic (SCDOT § 627) | 2,000 | LF | $0.00 | |
| 601-30 | Permanent yellow pavement markers, 4" x 4", bi-directional (SCDOT § 630) | 30 | EA | $0.00 | |
| 601-31 | Permanent blue pavement markers, 4" x 4", bi-directional (SCDOT § 630) | 10 | EA | $0.00 | |
| 601-32 | Removal of pavement markings (SCDOT § 631) | 2,000 | LF | $0.00 | |
| 601-33 | Removal of pavement markings, arrows, symbols and word messages (SCDOT § 631) | 4 | EA | $0.00 | |
| 601-34 | Flat Sheet Sign, Type III, Fixed Size & Message Sign (SCDOT § 651)(a) | 9 | SF | $0.00 | |
| 601-35 | Flat Sheet Sign, type III, rectangular, size determined by message, dual posts, CAFB sign standards (SCDOT § 651)(a) | 15 | SF | $0.00 | |
| Notes: | |||||
| (a) | Signs shall conform to current Charleston AFB Sign Standards and be mounted on brown breakaway square tube posts (SCDOT § 655). | ||||
| CONCRETE (SCDOT § 700) | |||||
| 700-01 | Concrete for Pavements - Class 2500 (SCDOT § 701)(a) | 750 | CY | $0.00 | |
| 700-02 | Concrete for Pavements - Class 3000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| 700-03 | Concrete for Pavements - Class 4000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| 700-04 | Concrete for Pavements - Class 5000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| Notes: | |||||
| (a) | Concrete material and hauling costs only. | ||||
| STORM DRAINAGE (SCDOT § 700) | |||||
| 701-01 | 12" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-02 | 15" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-03 | 18" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-04 | 24" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 300 | LF | $0.00 | |
| 701-05 | 30" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 300 | LF | $0.00 | |
| 701-06 | 36" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-07 | 12" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-08 | 15" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-09 | 18" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-10 | 24" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-11 | 30" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-12 | 36" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-13 | 14" x 23" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-14 | 19" x 30" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-15 | 24" x 38" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-17 | 6" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-18 | 8" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-19 | 10" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-20 | 12" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-21 | 15" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-22 | 18" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-23 | 24" Corrugated HDPE (SCDOT SC-M-714) | 100 | LF | $0.00 | |
| 701-24 | Clean Existing Pipe (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-25 | Catch Basin, Type 1, precast 3' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-26 | Catch Basin, Type 1, precast 3' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-27 | Catch Basin, Type 1, precast 3' x 3' box, 5' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-28 | Catch Basin, Type 1, precast 3' x 3' box, 6' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-29 | Catch Basin, Type 1, precast 3' x 3' box, 8' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-30 | Catch Basin, Type 1, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-31 | Catch Basin, Type 1, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-32 | Catch Basin, Type 1, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-33 | Catch Basin, Type 1, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-34 | Catch Basin, Type 1, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-35 | Catch Basin, Type 16, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-36 | Catch Basin, Type 16, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-37 | Catch Basin, Type 16, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-38 | Catch Basin, Type 16, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-39 | Catch Basin, Type 16, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-40 | Drop Inlet, precast 24"x24" with 2'x2' box, 3' deep (SCDOT § 719 SCDOT 719-105) | 2 | EA | $0.00 | |
| 701-41 | Drop Inlet, precast 24"x24" with 2'x2' box, 4' deep (SCDOT § 719 SCDOT 719-105) | 2 | EA | $0.00 | |
| 701-42 | Drop Inlet, precast 24"x36" with 2' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-43 | Drop Inlet, precast 24"x36" with 2' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-44 | Drop Inlet, precast 24"x36" with 2' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-45 | Drop Inlet, precast, 24"x36" with 4'x4' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-46 | Drop Inlet, precast, 24"x36" with 4'x4' box, 4' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-47 | Drop Inlet, precast, 24"x36" with 4'x4' box, 5' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-48 | Drop Inlet, precast, 24"x36" with 4'x4' box, 6' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-49 | Drop Inlet, precast, 24"x36" with 4'x4' box, 8' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-50 | Junction Box, precast 3' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-51 | Junction Box, precast 3' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-52 | Junction Box, precast 3' x 3' box, 5' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-53 | Junction Box, precast 3' x 3' box, 6' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-54 | Junction Box, precast 3' x 3' box, 8' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-55 | Junction Box, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-56 | Junction Box, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-57 | Junction Box, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-58 | Junction Box, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-59 | Junction Box, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-60 | Manhole, precast 48" diameter, 4' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-61 | Manhole, precast 48" diameter, 6' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-62 | Manhole, precast 48" diameter, 8' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-63 | Adjust catch basin, drop inlet, utility box, junction box (SCDOT § 719) | 6 | EA | $0.00 | |
| 701-64 | Adjust manhole (SCDOT § 719) | 4 | EA | $0.00 | |
| 701-65 | Trench Drain, 12" (SCDOT § 719 SCDOT 719-215) | 100 | LF | $0.00 | |
| 701-66 | Provide security grill steel | 5 | LB | $0.00 | |
| SIDEWALKS, MEDIANS, CURB & GUTTER (SCDOT § 720) | |||||
| 720-01 | Concrete sidewalk, 4" thick (SCDOT § 720)(a) | 400 | SY | $0.00 | |
| 720-02 | Concrete sidewalk, 6" thick (SCDOT § 720)(a) | 200 | SY | $0.00 | |
| 720-03 | Concrete Median (SCDOT § 720)(a) | 60 | SY | $0.00 | |
| 720-04 | Provide welded wire fabric in odd-shaped slabs (SCDOT § 720) | 40 | SY | $0.00 | |
| 720-05 | Concrete Curb & Gutter, 18", vertical face (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-06 | Concrete Curb & Gutter, 18", ogee (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-07 | Concrete Curb & Gutter, 24", vertical face (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-08 | Detectable warning surface for ADA ramp surfaces (SCDOT § 720) | 160 | SF | $0.00 | |
| Notes: | |||||
| (a) | Includes Class 3000 Portland cement concrete. Base course and welded wire fabric are covered separately under separate line items. | ||||
| UNDERDRAINS (SCDOT § 801) | |||||
| 800-01 | Aggregate Underdrain, #57 (SCDOT § 801) | 10 | CY | $0.00 | |
| 800-02 | Aggregate Underdrain, #789 (SCDOT § 801) | 10 | CY | $0.00 | |
| 800-03 | Corrugated Polyethylene Underdrain Pipe, 4" (SCDOT § 802) | 50 | LF | $0.00 | |
| 800-03 | Corrugated Polyethylene Underdrain Pipe, 6" (SCDOT § 802) | 50 | LF | $0.00 | |
| RIPRAP (SCDOT § 804) | |||||
| 804-01 | RIPRAP, Class A (SCDOT § 804) | 30 | CY | $0.00 | |
| 804-02 | RIPRAP, Class B (SCDOT § 804) | 30 | CY | $0.00 | |
| 804-03 | Geotextile for erosion control under riprap, Class 2, Type B (SCDOT § 804) | 60 | SY | $0.00 | |
| 804-04 | Geotextile for erosion control under riprap, Class 2, Type C (SCDOT § 804) | 60 | SY | $0.00 | |
| LANDSCAPING (SCDOT § 800)(a) | |||||
| 810-01 | Permanent stand of grass, centipede, seeding (SCDOT § 810)(b) | 20 | CSY | $0.00 | |
| 810-02 | Permanent stand of grass, common bermuda (SCDOT § 810)(b) | 20 | CSY | $0.00 | |
| 810-03 | Interseeding, centipede, 10#/acre (SCDOT § 810)(b) | 5 | CSY | $0.00 | |
| 810-04 | Temporary grassing, schedule 2 (SCDOT § 810)(b) | 5 | CSY | $0.00 | |
| 810-05 | Organic topsoil (SCDOT § 810) | 100 | CY | $0.00 | |
| 810-06 | Permanent stand of grass, centipede, sodding (SCDOT § 813)(b) | 40 | CSY | $0.00 | |
| 810-07 | Topsoil testing & analysis | 2 | EA | $0.00 | |
| Notes: | |||||
| (a) | The use of millet, weeping lovegrass, crimson clover and bahia grass is prohibited on all projects. | ||||
| (b) | Items to also include all fertilizers, soil ammendments, mulches and maintenace required until a sufficient stand of grass is established and work is accepted. | ||||
| EROSION CONTROL (SCDOT § 815) | |||||
| 815-01 | Silt Fencing (SCDOT § 815) | 1,000 | LF | $0.00 | |
| 815-02 | Sediment Tubing (SCDOT § 815) | 64 | LF | $0.00 | |
| 815-03 | Stabilized Construction Entrance (SCDOT § 815) | 30 | SY | $0.00 | |
| INCIDENTAL CONSTRUCTION (SCDOT § 800) | |||||
| 850-01 | Reset Chain Link Fence (SCDOT § 807) | 500 | LF | $0.00 | |
| 850-02 | CAFB standard brick paved crosswalk with concrete edging (CAFB-DWG-LP1) | 144 | SF | $0.00 | |
| 850-03 | Stencil parking space with word message, fast dry white paint | 4 | EA | $0.00 | |
| 850-04 | Concrete wheel stops | 12 | EA | $0.00 | |
| 850-05 | Relocate wheel stops | 24 | EA | $0.00 | |
| 850-06 | Weed control spray | 400 | SY | $0.00 | |
| 850-07 | Sch 40 steel bollard, 4" diam, 7' long, concrete filled, 3' deep concrete foundation | 10 | EA | $0.00 | |
| 850-08 | Sch 40 steel bollard, 6" diam, 7' long, concrete filled, 3' deep concrete foundation | 5 | EA | $0.00 | |
| AIRFIELD CONCRETE PAVEMENT | |||||
| 900-01 | Remove/replace random PCC slabs, 650 psi flexural strength | 150 | CY | $0.00 | |
| 900-02 | Partial depth spall repairs-epoxy bonded PCC | 100 | SY-IN | $0.00 | |
| 900-03 | Full depth PCC spall repair, up to 15" | 150 | SF | $0.00 |
&LFA4418-08-R-0001
Attachment 1&C&"Arial,Bold"&16Charleston Air Force Base Pavements IDIQ Price Schedule - Base Year&R7/21/2008 &C&"Arial,Bold"Price Schedule - Base Year&RPage &P of &N
Option Year 1
| GENERAL NOTES | |||||
| 1 | Quanities are presented for bid evaluation purposes only. | ||||
| 2 | Include all direct and indirect costs and expenses required to complete the work in an acceptable manner. | ||||
| 3 | This contract incorporates SCDOT standard highway construction requirements. References to SCDOT requirements shall be to the SCDOT 2007 Standard Specifications for Highway Construction | ||||
| ITEM NO | DESCRIPTION | QTY(1) | UNIT | UNIT COST(2) | AMOUNT |
| EARTHWORK & DEMOLITION (SCDOT § 200) | |||||
| 200-01 | Clear and Grub, including removal & disposal of material (SCDOT § 201) | 10 | SY | $0.00 | |
| 200-02 | Saw cut asphalt pavement (SCDOT § 202) | 150 | IF(b) | $0.00 | |
| 200-03 | Removal & disposal of asphalt pavement, 2" thickness or greater, including hauling (SCDOT § 202)(a) | 600 | SY | $0.00 | |
| 200-04 | Saw cut Portland cement concrete pavement (SCDOT § 202) | 300 | IF(b) | $0.00 | |
| 200-05 | Removal & disposal of Portland cement concete pavement, including hauling (SCDOT § 202) | 10 | CY | $0.00 | |
| 200-06 | Removal & disposal of brick pavement, including hauling (SCDOT § 202) | 1 | SY | $0.00 | |
| 200-07 | Removal & disposal of curb and gutter, including hauling (SCDOT § 202) | 400 | LF | $0.00 | |
| 200-08 | Removal & disposal of pipes, headwalls, manholes inlets, guardrails, structures and other obstructions, including hauling (SCDOT § 202) | 9 | CY | $0.00 | |
| 200-09 | Stripping & replacing topsoil (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-10 | Unclassified excavation (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-11 | Excavation, trench, to 4' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-12 | Excavation, trench, 4' to 6' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-13 | Excavation, trench, 6' to 8' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-14 | Surplus soil material hauling & off-site disposal (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-15 | Removal & off-site disposal of contaminated soil, including hauling (SCDOT § 202) | 1 | TON | $0.00 | |
| 200-16 | Provide borrow material, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-17 | Provide borrow AASHTO A-3 clean sand, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-18 | Site grading & compaction (SCDOT § 203) | 800 | SY | $0.00 | |
| 200-19 | Backfilling for embankment construction, including compaction (SCDOT § 205) | 20 | CY | $0.00 | |
| 200-20 | Backfilling trenches, holes & pits, including compaction (SCDOT § 205) | 30 | CY | $0.00 | |
| 200-21 | Subgrade fine grading, compaction & proof rolling (SCDOT § 208) | 600 | SY | $0.00 | |
| 200-22 | Flowable fill (SCDOT § 210) | 10 | CY | $0.00 | |
| 200-23 | Stabilization fabric, polypropylene | 200 | SY | $0.00 | |
| 200-24 | Stabilization material, Geogrid (Tensar 1100 or apprvoed equal) | 200 | SY | $0.00 | |
| 200-25 | Soil contamination testing | 1 | EA | $0.00 | |
| Notes: | |||||
| (a) | Areas of asphalt pavement with a total thickness less than 2 inches not included as they shall be included in the Unclassified Excavation line item. | ||||
| (b) | Inch Feet (Inch of sawcut depth multiplied by linear feet of sawcut run) | ||||
| (c) | Line item includes bringing the material to the site. Costs for placing and compacting the material is covered under Backfilling & embankment construction. | ||||
| BASE COURSES (SCDOT § 300) | |||||
| 300-01 | Cement Modified Subbase (SCDOT § 301)(a) | 100 | CY | $0.00 | |
| 300-02 | Portland cement for cement modified subbase (SCDOT § 301) | 7 | TON | $0.00 | |
| 300-03 | Macadam graded aggregate base course (SCDOT § 305)(b) | 300 | CY | $0.00 | |
| 300-04 | Marine limestone graded aggregate base course (SCDOT § 305)(b) | 200 | CY | $0.00 | |
| 300-05 | Recycled Portland cement concrete base course (SCDOT § 305)(b) | 100 | CY | $0.00 | |
| Notes: | |||||
| (a) | Portland cement material cost not included. Material cost covered separately by Portland cement for cement modified subbase line item. | ||||
| (b) | Includes hauling from off-site, placing, compaction, rolling & finishing | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 400-01 | Type A HMA Surface Course (SCDOT § 401)(a) | Option year pricing for these specific line items is not required as the contract already provides price adjustments for each delivery order based upon movement of the SCDOT Asphalt Binder Index. Adjust base year pricing accordingly. | |||
| 400-02 | Type B HMA Surface Course (SCDOT § 401)(a) | ||||
| 400-03 | Type C HMA Surface Course (SCDOT § 401)(a) | ||||
| 400-04 | Prime coat application, EAP-Special (SCDOT § 401/305/407) | ||||
| 400-05 | Tack coat application, emulsified asphalt (SCDOT § 401) | ||||
| 400-06 | Sealcoat, Fog Seal, 2 Coats | ||||
| Notes: | |||||
| (a) | Material and hauling costs only. Placing and compacting costs included in Section 401 Line items. | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS NOT PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 401-01 | Asphalt Paving, Parking Lots & Driveways (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-02 | Asphalt Paving, roads & other mainline paving applications (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-03 | Full Depth Asphalt Patching (SCDOT § 401)(a) | 3,000 | SY-Inch | $0.00 | |
| 401-04 | Asphalt paving, bike lanes & jogging trails, 2" thick, single lane less than 8' wide (SCDOT § 401)(a) | 2,000 | SY | $0.00 | |
| 401-05 | Milling existing asphalt pavement, 1" to 3", including suface cleaning (SCDOT § 401) | 2,500 | SY | $0.00 | |
| 401-06 | Asphalt surface treatment, single treatment (SCDOT § 406) | 400 | SY | $0.00 | |
| 401-07 | Patch with cold mix asphalt surface course, Type 1 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-08 | Patch with cold mix asphalt surface course, Type 2 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-09 | Crack routing/sealing, up to 1" wide cracks | 3,000 | LF | $0.00 | |
| 401-10 | Crack routing/sealing, 1" to 2" wide cracks | 1,000 | LF | $0.00 | |
| $0.00 | |||||
| Notes: | |||||
| (a) | Hot mix asphalt material and hauling costs included in Section 400 Line items. Prime and tack coat application costs included in Section 400 Line items. | ||||
| CONCRETE PAVEMENTS (SCDOT § 500) | |||||
| 500-01 | Portland cement concrete pavement, 6" thick (SCDOT § 501) (a) | 800 | SY | $0.00 | |
| 500-02 | Portland cement concrete pavement, 8" thick (SCDOT § 501) (a) | 600 | SY | $0.00 | |
| 500-03 | Portland cement concrete pavement, 10" thick (SCDOT § 501) (a) | 400 | SY | $0.00 | |
| 500-04 | Provide welded wire fabric in odd-shaped slabs (SCDOT § 501) | 500 | SY | $0.00 | |
| 500-05 | Clean & reseal joints in concrete pavement with silicone sealants (SCDOT § 504) | 7,500 | LF | $0.00 | |
| 500-06 | Rout, clean & silicone seal random cracks 1/8" to 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| 500-07 | Rout, clean & silicone seal random cracks over 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| Notes: | |||||
| (a) | Use either a slipform paver or a self-contained, self-propelled, fixed form paver requiring no external tractive force and capable of consolidating the full width and depth of the concrete pavement in one pass. Provide doweled construction joints, silicone joint seals over circular backer rods, steel forms except in fillets and liquid membrane forming curing compounds. Concrete material costs covered separately under Section 700. | ||||
| TEMPORARY TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 600-01 | Traffic control plan, per location | 1 | EA | $0.00 | |
| 600-02 | Standard Traffic Cones (SCDOT § 603) | 30 | EA | $0.00 | |
| 600-03 | Portable Plastic Drums (SCDOT § 603) | 5 | EA | $0.00 | |
| 600-05 | Type I Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-06 | Type II Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-07 | Type III Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-08 | Construction Sign, 36" by 36", Tripod Mounted (SCDOT § 605) | 2 | EA | $0.00 | |
| 600-09 | Construction Sign, 36" by 36", Post Mounted (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-10 | Construction Sign, Mounted to Barricade (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-11 | Concrete Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-12 | Water Filled Polyethylene Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-13 | Trailer-Mounted Electric Changeable Message Sign, 5 day minimum (SCDOT § 606) | 5 | DY | $0.00 | |
| 600-14 | Supplemental Warning Lights, Type A flashing light (SCDOT § 608) | 20 | EA | $0.00 | |
| 600-15 | Supplemental Warning Lights, Type B flashing light (SCDOT § 608) | 10 | EA | $0.00 | |
| 600-16 | Temporary Pavement Markings, 4" broken lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-17 | Temporary Pavement Markings, 4" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-18 | Temporary Pavement Markings, 12" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-19 | Temporary Pavement Markings, 24" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-20 | Flagman (SCDOT § 610) | 16 | HR | $0.00 | |
| PERMANENT TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 601-01 | Pavement Markings, 4" white broken lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-02 | Pavement Markings, 4" white solid lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-03 | Pavement Markings, 8" white solid lines, fast dry paint (SCDOT § 625) | 200 | LF | $0.00 | |
| 601-04 | Pavement Markings, 12" white solid lines, fast dry paint (SCDOT § 625) | 20 | LF | $0.00 | |
| 601-05 | Pavement Markings, white single arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-06 | Pavement Markings, white combination arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-07 | Pavement Markings, white "ONLY" word message, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-08 | Pavement Markings, white lane drop arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-09 | Pavement Markings, handicap symbol, fast dry paint (SCDOT § 625) | 4 | EA | $0.00 | |
| 601-10 | Pavement Markings, 4" yellow broken lines, fast dry paint (SCDOT § 625) | 500 | LF | $0.00 | |
| 601-11 | Pavement Markings, 4" yellow solid lines, fast dry paint (SCDOT § 625) | 2,000 | LF | $0.00 | |
| 601-12 | Pavement Markings, 6" yellow solid lines on curb (top & face), fast dry paint (SCDOT § 625) | 200 | LF | $0.00 | |
| 601-13 | Pavement Markings, wheel stops, solid yellow on all exposed faces, fast dry paint (SCDOT § 625) | 20 | EA | $0.00 | |
| 601-14 | Pavement Markings, 4" blue solid lines, fast dry paint (SCDOT § 625) | 80 | LF | $0.00 | |
| 601-15 | Pavement Markings, 6" red solid lines, fast dry paint (SCDOT § 625) | 40 | LF | $0.00 | |
| 601-17 | Pavement Markings, 6" red solid lines on curb (top & face), fast dry paint (SCDOT § 625) | 40 | LF | $0.00 | |
| 601-18 | Pavement Markings, 4" white broken lines, thermoplastic (SCDOT § 627) | 1,000 | LF | $0.00 | |
| 601-19 | Pavement Markings, 4" white solid lines, thermoplastic (SCDOT § 627) | 1,000 | LF | $0.00 | |
| 601-20 | Pavement Markings, 8" white solid lines, thermoplastic (SCDOT § 627) | 200 | LF | $0.00 | |
| 601-21 | Pavement Markings, 12" white solid lines, thermoplastic (SCDOT § 627) | 20 | LF | $0.00 | |
| 601-22 | Pavement Markings, white single arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-23 | Pavement Markings, white combination arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-24 | Pavement Markings, white "ONLY" word message, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-25 | Pavement Markings, white lane drop arrow, thermoplastic (SCDOT § 627) | 1 | EA | $0.00 | |
| 601-26 | Pavement Markings, white 12"x18" triangular yield bar, thermoplastic (SCDOT § 627) | 24 | LF | $0.00 | |
| 601-27 | Pavement Markings, handicap symbol, thermoplastic (SCDOT § 627) | 4 | EA | $0.00 | |
| 601-28 | Pavement Markings, 4" yellow broken lines, thermoplastic (SCDOT § 627) | 500 | LF | $0.00 | |
| 601-29 | Pavement Markings, 4" yellow solid lines, thermoplastic (SCDOT § 627) | 2,000 | LF | $0.00 | |
| 601-30 | Permanent yellow pavement markers, 4" x 4", bi-directional (SCDOT § 630) | 30 | EA | $0.00 | |
| 601-31 | Permanent blue pavement markers, 4" x 4", bi-directional (SCDOT § 630) | 10 | EA | $0.00 | |
| 601-32 | Removal of pavement markings (SCDOT § 631) | 2,000 | LF | $0.00 | |
| 601-33 | Removal of pavement markings, arrows, symbols and word messages (SCDOT § 631) | 4 | EA | $0.00 | |
| 601-34 | Flat Sheet Sign, Type III, Fixed Size & Message Sign (SCDOT § 651)(a) | 9 | SF | $0.00 | |
| 601-35 | Flat Sheet Sign, type III, rectangular, size determined by message, dual posts, CAFB sign standards (SCDOT § 651)(a) | 15 | SF | $0.00 | |
| Notes: | |||||
| (a) | Signs shall conform to current Charleston AFB Sign Standards and be mounted on brown breakaway square tube posts (SCDOT § 655). | ||||
| CONCRETE (SCDOT § 700) | |||||
| 700-01 | Concrete for Pavements - Class 2500 (SCDOT § 701)(a) | 750 | CY | $0.00 | |
| 700-02 | Concrete for Pavements - Class 3000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| 700-03 | Concrete for Pavements - Class 4000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| 700-04 | Concrete for Pavements - Class 5000 (SCDOT § 701)(a) | 1,000 | CY | $0.00 | |
| Notes: | |||||
| (a) | Concrete material and hauling costs only. | ||||
| STORM DRAINAGE (SCDOT § 700) | |||||
| 701-01 | 12" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-02 | 15" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-03 | 18" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 500 | LF | $0.00 | |
| 701-04 | 24" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 300 | LF | $0.00 | |
| 701-05 | 30" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 300 | LF | $0.00 | |
| 701-06 | 36" RCP, ASTM C76, Class III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-07 | 12" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-08 | 15" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-09 | 18" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-10 | 24" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-11 | 30" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-12 | 36" RCP, ASTM C76, Class IV (SCDOT SC-M-714) | 150 | LF | $0.00 | |
| 701-13 | 14" x 23" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-14 | 19" x 30" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-15 | 24" x 38" Hor. Elliptical RCP, ASTM C507, Class HE-III (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-17 | 6" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-18 | 8" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-19 | 10" Corrugated HDPE (SCDOT SC-M-714) | 400 | LF | $0.00 | |
| 701-20 | 12" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-21 | 15" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-22 | 18" Corrugated HDPE (SCDOT SC-M-714) | 350 | LF | $0.00 | |
| 701-23 | 24" Corrugated HDPE (SCDOT SC-M-714) | 100 | LF | $0.00 | |
| 701-24 | Clean Existing Pipe (SCDOT SC-M-714) | 200 | LF | $0.00 | |
| 701-25 | Catch Basin, Type 1, precast 3' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-26 | Catch Basin, Type 1, precast 3' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-27 | Catch Basin, Type 1, precast 3' x 3' box, 5' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-28 | Catch Basin, Type 1, precast 3' x 3' box, 6' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-29 | Catch Basin, Type 1, precast 3' x 3' box, 8' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-30 | Catch Basin, Type 1, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-31 | Catch Basin, Type 1, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-32 | Catch Basin, Type 1, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-33 | Catch Basin, Type 1, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-34 | Catch Basin, Type 1, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-001) | 2 | EA | $0.00 | |
| 701-35 | Catch Basin, Type 16, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-36 | Catch Basin, Type 16, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-37 | Catch Basin, Type 16, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-38 | Catch Basin, Type 16, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-39 | Catch Basin, Type 16, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-016) | 2 | EA | $0.00 | |
| 701-40 | Drop Inlet, precast 24"x24" with 2'x2' box, 3' deep (SCDOT § 719 SCDOT 719-105) | 2 | EA | $0.00 | |
| 701-41 | Drop Inlet, precast 24"x24" with 2'x2' box, 4' deep (SCDOT § 719 SCDOT 719-105) | 2 | EA | $0.00 | |
| 701-42 | Drop Inlet, precast 24"x36" with 2' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-43 | Drop Inlet, precast 24"x36" with 2' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-44 | Drop Inlet, precast 24"x36" with 2' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-45 | Drop Inlet, precast, 24"x36" with 4'x4' box, 3' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-46 | Drop Inlet, precast, 24"x36" with 4'x4' box, 4' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-47 | Drop Inlet, precast, 24"x36" with 4'x4' box, 5' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-48 | Drop Inlet, precast, 24"x36" with 4'x4' box, 6' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-49 | Drop Inlet, precast, 24"x36" with 4'x4' box, 8' deep (SCDOT § 719 SCDOT 719-110) | 2 | EA | $0.00 | |
| 701-50 | Junction Box, precast 3' x 3' box, 3' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-51 | Junction Box, precast 3' x 3' box, 4' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-52 | Junction Box, precast 3' x 3' box, 5' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-53 | Junction Box, precast 3' x 3' box, 6' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-54 | Junction Box, precast 3' x 3' box, 8' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-55 | Junction Box, precast 4' x 4' box, 3' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-56 | Junction Box, precast 4' x 4' box, 4' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-57 | Junction Box, precast 4' x 4' box, 5' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-58 | Junction Box, precast 4' x 4' box, 6' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-59 | Junction Box, precast 4' x 4' box, 8' deep (SCDOT § 719 SCDOT 719-330) | 2 | EA | $0.00 | |
| 701-60 | Manhole, precast 48" diameter, 4' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-61 | Manhole, precast 48" diameter, 6' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-62 | Manhole, precast 48" diameter, 8' deep (SCDOT § 719 SCDOT 719-420) | 2 | EA | $0.00 | |
| 701-63 | Adjust catch basin, drop inlet, utility box, junction box (SCDOT § 719) | 6 | EA | $0.00 | |
| 701-64 | Adjust manhole (SCDOT § 719) | 4 | EA | $0.00 | |
| 701-65 | Trench Drain, 12" (SCDOT § 719 SCDOT 719-215) | 100 | LF | $0.00 | |
| 701-66 | Provide security grill steel | 5 | LB | $0.00 | |
| SIDEWALKS, MEDIANS, CURB & GUTTER (SCDOT § 720) | |||||
| 720-01 | Concrete sidewalk, 4" thick (SCDOT § 720)(a) | 400 | SY | $0.00 | |
| 720-02 | Concrete sidewalk, 6" thick (SCDOT § 720)(a) | 200 | SY | $0.00 | |
| 720-03 | Concrete Median (SCDOT § 720)(a) | 60 | SY | $0.00 | |
| 720-04 | Provide welded wire fabric in odd-shaped slabs (SCDOT § 720) | 40 | SY | $0.00 | |
| 720-05 | Concrete Curb & Gutter, 18", vertical face (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-06 | Concrete Curb & Gutter, 18", ogee (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-07 | Concrete Curb & Gutter, 24", vertical face (SCDOT § 720) | 1,000 | LF | $0.00 | |
| 720-08 | Detectable warning surface for ADA ramp surfaces (SCDOT § 720) | 160 | SF | $0.00 | |
| Notes: | |||||
| (a) | Includes Class 3000 Portland cement concrete. Base course and welded wire fabric are covered separately under separate line items. | ||||
| UNDERDRAINS (SCDOT § 801) | |||||
| 800-01 | Aggregate Underdrain, #57 (SCDOT § 801) | 10 | CY | $0.00 | |
| 800-02 | Aggregate Underdrain, #789 (SCDOT § 801) | 10 | CY | $0.00 | |
| 800-03 | Corrugated Polyethylene Underdrain Pipe, 4" (SCDOT § 802) | 50 | LF | $0.00 | |
| 800-03 | Corrugated Polyethylene Underdrain Pipe, 6" (SCDOT § 802) | 50 | LF | $0.00 | |
| RIPRAP (SCDOT § 804) | |||||
| 804-01 | RIPRAP, Class A (SCDOT § 804) | 30 | CY | $0.00 | |
| 804-02 | RIPRAP, Class B (SCDOT § 804) | 30 | CY | $0.00 | |
| 804-03 | Geotextile for erosion control under riprap, Class 2, Type B (SCDOT § 804) | 60 | SY | $0.00 | |
| 804-04 | Geotextile for erosion control under riprap, Class 2, Type C (SCDOT § 804) | 60 | SY | $0.00 | |
| LANDSCAPING (SCDOT § 800)(a) | |||||
| 810-01 | Permanent stand of grass, centipede, seeding (SCDOT § 810)(b) | 20 | CSY | $0.00 | |
| 810-02 | Permanent stand of grass, common bermuda (SCDOT § 810)(b) | 20 | CSY | $0.00 | |
| 810-03 | Interseeding, centipede, 10#/acre (SCDOT § 810)(b) | 5 | CSY | $0.00 | |
| 810-04 | Temporary grassing, schedule 2 (SCDOT § 810)(b) | 5 | CSY | $0.00 | |
| 810-05 | Organic topsoil (SCDOT § 810) | 100 | CY | $0.00 | |
| 810-06 | Permanent stand of grass, centipede, sodding (SCDOT § 813)(b) | 40 | CSY | $0.00 | |
| 810-07 | Topsoil testing & analysis | 2 | EA | $0.00 | |
| Notes: | |||||
| (a) | The use of millet, weeping lovegrass, crimson clover and bahia grass is prohibited on all projects. | ||||
| (b) | Items to also include all fertilizers, soil ammendments, mulches and maintenace required until a sufficient stand of grass is established and work is accepted. | ||||
| EROSION CONTROL (SCDOT § 815) | |||||
| 815-01 | Silt Fencing (SCDOT § 815) | 1,000 | LF | $0.00 | |
| 815-02 | Sediment Tubing (SCDOT § 815) | 64 | LF | $0.00 | |
| 815-03 | Stabilized Construction Entrance (SCDOT § 815) | 30 | SY | $0.00 | |
| INCIDENTAL CONSTRUCTION (SCDOT § 800) | |||||
| 850-01 | Reset Chain Link Fence (SCDOT § 807) | 500 | LF | $0.00 | |
| 850-02 | CAFB standard brick paved crosswalk with concrete edging (CAFB-DWG-LP1) | 144 | SF | $0.00 | |
| 850-03 | Stencil parking space with word message, fast dry white paint | 4 | EA | $0.00 | |
| 850-04 | Concrete wheel stops | 12 | EA | $0.00 | |
| 850-05 | Relocate wheel stops | 24 | EA | $0.00 | |
| 850-06 | Weed control spray | 400 | SY | $0.00 | |
| 850-07 | Sch 40 steel bollard, 4" diam, 7' long, concrete filled, 3' deep concrete foundation | 10 | EA | $0.00 | |
| 850-08 | Sch 40 steel bollard, 6" diam, 7' long, concrete filled, 3' deep concrete foundation | 5 | EA | $0.00 | |
| AIRFIELD CONCRETE PAVEMENT | |||||
| 900-01 | Remove/replace random PCC slabs, 650 psi flexural strength | 150 | CY | $0.00 | |
| 900-02 | Partial depth spall repairs-epoxy bonded PCC | 100 | SY-IN | $0.00 | |
| 900-03 | Full depth PCC spall repair, up to 15" | 150 | SF | $0.00 |
&LFA4418-08-R-0001
Attachment 1&C&"Arial,Bold"&16Charleston Air Force Base Pavements IDIQ Price Schedule - Option Year 1&R7/21/2008 &C&"Arial,Bold"Price Schedule - Option Year 1&RPage &P of &N
Option Year 2
| GENERAL NOTES | |||||
| 1 | Quanities are presented for bid evaluation purposes only. | ||||
| 2 | Include all direct and indirect costs and expenses required to complete the work in an acceptable manner. | ||||
| 3 | This contract incorporates SCDOT standard highway construction requirements. References to SCDOT requirements shall be to the SCDOT 2007 Standard Specifications for Highway Construction | ||||
| ITEM NO | DESCRIPTION | QTY(1) | UNIT | UNIT COST(2) | AMOUNT |
| EARTHWORK & DEMOLITION (SCDOT § 200) | |||||
| 200-01 | Clear and Grub, including removal & disposal of material (SCDOT § 201) | 10 | SY | $0.00 | |
| 200-02 | Saw cut asphalt pavement (SCDOT § 202) | 150 | IF(b) | $0.00 | |
| 200-03 | Removal & disposal of asphalt pavement, 2" thickness or greater, including hauling (SCDOT § 202)(a) | 600 | SY | $0.00 | |
| 200-04 | Saw cut Portland cement concrete pavement (SCDOT § 202) | 300 | IF(b) | $0.00 | |
| 200-05 | Removal & disposal of Portland cement concete pavement, including hauling (SCDOT § 202) | 10 | CY | $0.00 | |
| 200-06 | Removal & disposal of brick pavement, including hauling (SCDOT § 202) | 1 | SY | $0.00 | |
| 200-07 | Removal & disposal of curb and gutter, including hauling (SCDOT § 202) | 400 | LF | $0.00 | |
| 200-08 | Removal & disposal of pipes, headwalls, manholes inlets, guardrails, structures and other obstructions, including hauling (SCDOT § 202) | 9 | CY | $0.00 | |
| 200-09 | Stripping & replacing topsoil (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-10 | Unclassified excavation (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-11 | Excavation, trench, to 4' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-12 | Excavation, trench, 4' to 6' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-13 | Excavation, trench, 6' to 8' deep (SCDOT § 203) | 30 | CY | $0.00 | |
| 200-14 | Surplus soil material hauling & off-site disposal (SCDOT § 203) | 20 | CY | $0.00 | |
| 200-15 | Removal & off-site disposal of contaminated soil, including hauling (SCDOT § 202) | 1 | TON | $0.00 | |
| 200-16 | Provide borrow material, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-17 | Provide borrow AASHTO A-3 clean sand, including hauling to site (SCDOT § 203)(c) | 20 | CY | $0.00 | |
| 200-18 | Site grading & compaction (SCDOT § 203) | 800 | SY | $0.00 | |
| 200-19 | Backfilling for embankment construction, including compaction (SCDOT § 205) | 20 | CY | $0.00 | |
| 200-20 | Backfilling trenches, holes & pits, including compaction (SCDOT § 205) | 30 | CY | $0.00 | |
| 200-21 | Subgrade fine grading, compaction & proof rolling (SCDOT § 208) | 600 | SY | $0.00 | |
| 200-22 | Flowable fill (SCDOT § 210) | 10 | CY | $0.00 | |
| 200-23 | Stabilization fabric, polypropylene | 200 | SY | $0.00 | |
| 200-24 | Stabilization material, Geogrid (Tensar 1100 or apprvoed equal) | 200 | SY | $0.00 | |
| 200-25 | Soil contamination testing | 1 | EA | $0.00 | |
| Notes: | |||||
| (a) | Areas of asphalt pavement with a total thickness less than 2 inches not included as they shall be included in the Unclassified Excavation line item. | ||||
| (b) | Inch Feet (Inch of sawcut depth multiplied by linear feet of sawcut run) | ||||
| (c) | Line item includes bringing the material to the site. Costs for placing and compacting the material is covered under Backfilling & embankment construction. | ||||
| BASE COURSES (SCDOT § 300) | |||||
| 300-01 | Cement Modified Subbase (SCDOT § 301)(a) | 100 | CY | $0.00 | |
| 300-02 | Portland cement for cement modified subbase (SCDOT § 301) | 7 | TON | $0.00 | |
| 300-03 | Macadam graded aggregate base course (SCDOT § 305)(b) | 300 | CY | $0.00 | |
| 300-04 | Marine limestone graded aggregate base course (SCDOT § 305)(b) | 200 | CY | $0.00 | |
| 300-05 | Recycled Portland cement concrete base course (SCDOT § 305)(b) | 100 | CY | $0.00 | |
| Notes: | |||||
| (a) | Portland cement material cost not included. Material cost covered separately by Portland cement for cement modified subbase line item. | ||||
| (b) | Includes hauling from off-site, placing, compaction, rolling & finishing | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 400-01 | Type A HMA Surface Course (SCDOT § 401)(a) | Option year pricing for these specific line items is not required as the contract already provides price adjustments for each delivery order based upon movement of the SCDOT Asphalt Binder Index. Adjust base year pricing accordingly. | |||
| 400-02 | Type B HMA Surface Course (SCDOT § 401)(a) | ||||
| 400-03 | Type C HMA Surface Course (SCDOT § 401)(a) | ||||
| 400-04 | Prime coat application, EAP-Special (SCDOT § 401/305/407) | ||||
| 400-05 | Tack coat application, emulsified asphalt (SCDOT § 401) | ||||
| 400-06 | Sealcoat, Fog Seal, 2 Coats | ||||
| Notes: | |||||
| (a) | Material and hauling costs only. Placing and compacting costs included in Section 401 Line items. | ||||
| ASPHALT PAVEMENTS (SCDOT § 400) **ITEMS NOT PRICE ADJUSTED BASED ON CONTRACT ASPHALT INDEX** | |||||
| 401-01 | Asphalt Paving, Parking Lots & Driveways (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-02 | Asphalt Paving, roads & other mainline paving applications (SCDOT § 401)(a) | 5,000 | SY-Inch | $0.00 | |
| 401-03 | Full Depth Asphalt Patching (SCDOT § 401)(a) | 3,000 | SY-Inch | $0.00 | |
| 401-04 | Asphalt paving, bike lanes & jogging trails, 2" thick, single lane less than 8' wide (SCDOT § 401)(a) | 2,000 | SY | $0.00 | |
| 401-05 | Milling existing asphalt pavement, 1" to 3", including suface cleaning (SCDOT § 401) | 2,500 | SY | $0.00 | |
| 401-06 | Asphalt surface treatment, single treatment (SCDOT § 406) | 400 | SY | $0.00 | |
| 401-07 | Patch with cold mix asphalt surface course, Type 1 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-08 | Patch with cold mix asphalt surface course, Type 2 (SCDOT § 405) | 20 | TON | $0.00 | |
| 401-09 | Crack routing/sealing, up to 1" wide cracks | 3,000 | LF | $0.00 | |
| 401-10 | Crack routing/sealing, 1" to 2" wide cracks | 1,000 | LF | $0.00 | |
| $0.00 | |||||
| Notes: | |||||
| (a) | Hot mix asphalt material and hauling costs included in Section 400 Line items. Prime and tack coat application costs included in Section 400 Line items. | ||||
| CONCRETE PAVEMENTS (SCDOT § 500) | |||||
| 500-01 | Portland cement concrete pavement, 6" thick (SCDOT § 501) (a) | 800 | SY | $0.00 | |
| 500-02 | Portland cement concrete pavement, 8" thick (SCDOT § 501) (a) | 600 | SY | $0.00 | |
| 500-03 | Portland cement concrete pavement, 10" thick (SCDOT § 501) (a) | 400 | SY | $0.00 | |
| 500-04 | Provide welded wire fabric in odd-shaped slabs (SCDOT § 501) | 500 | SY | $0.00 | |
| 500-05 | Clean & reseal joints in concrete pavement with silicone sealants (SCDOT § 504) | 7,500 | LF | $0.00 | |
| 500-06 | Rout, clean & silicone seal random cracks 1/8" to 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| 500-07 | Rout, clean & silicone seal random cracks over 3/8" wide in concrete pavements (SCDOT § 505) | 500 | LF | $0.00 | |
| Notes: | |||||
| (a) | Use either a slipform paver or a self-contained, self-propelled, fixed form paver requiring no external tractive force and capable of consolidating the full width and depth of the concrete pavement in one pass. Provide doweled construction joints, silicone joint seals over circular backer rods, steel forms except in fillets and liquid membrane forming curing compounds. Concrete material costs covered separately under Section 700. | ||||
| TEMPORARY TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 600-01 | Traffic control plan, per location | 1 | EA | $0.00 | |
| 600-02 | Standard Traffic Cones (SCDOT § 603) | 30 | EA | $0.00 | |
| 600-03 | Portable Plastic Drums (SCDOT § 603) | 5 | EA | $0.00 | |
| 600-05 | Type I Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-06 | Type II Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-07 | Type III Barricade (SCDOT § 604) | 20 | LF | $0.00 | |
| 600-08 | Construction Sign, 36" by 36", Tripod Mounted (SCDOT § 605) | 2 | EA | $0.00 | |
| 600-09 | Construction Sign, 36" by 36", Post Mounted (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-10 | Construction Sign, Mounted to Barricade (SCDOT § 605) | 18 | SF | $0.00 | |
| 600-11 | Concrete Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-12 | Water Filled Polyethylene Barrier (SCDOT § 605) | 25 | LF | $0.00 | |
| 600-13 | Trailer-Mounted Electric Changeable Message Sign, 5 day minimum (SCDOT § 606) | 5 | DY | $0.00 | |
| 600-14 | Supplemental Warning Lights, Type A flashing light (SCDOT § 608) | 20 | EA | $0.00 | |
| 600-15 | Supplemental Warning Lights, Type B flashing light (SCDOT § 608) | 10 | EA | $0.00 | |
| 600-16 | Temporary Pavement Markings, 4" broken lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-17 | Temporary Pavement Markings, 4" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-18 | Temporary Pavement Markings, 12" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-19 | Temporary Pavement Markings, 24" solid lines, fast dry paint (SCDOT § 609) | 200 | LF | $0.00 | |
| 600-20 | Flagman (SCDOT § 610) | 16 | HR | $0.00 | |
| PERMANENT TRAFFIC CONTROLS (SCDOT § 600) | |||||
| 601-01 | Pavement Markings, 4" white broken lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-02 | Pavement Markings, 4" white solid lines, fast dry paint (SCDOT § 625) | 1,000 | LF | $0.00 | |
| 601-03 | Pavement Markings, 8" white solid lines, fast dry paint (SCDOT § 625) | 200 | LF | $0.00 | |
| 601-04 | Pavement Markings, 12" white solid lines, fast dry paint (SCDOT § 625) | 20 | LF | $0.00 | |
| 601-05 | Pavement Markings, white single arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-06 | Pavement Markings, white combination arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-07 | Pavement Markings, white "ONLY" word message, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-08 | Pavement Markings, white lane drop arrow, fast dry paint (SCDOT § 625) | 1 | EA | $0.00 | |
| 601-09 | Pavement Markings, handicap symbol, fast dry paint (SCDOT § 625) | 4 | EA | $0.00 | |
| 601-10 | Pavement Markings, 4" yellow broken lines, fast dry paint (SCDOT § 625) | 500 | LF | $0.00 | |
| 601-11 | Pavement Markings, 4" yellow solid lines, fast dry paint (SCDOT § 625) | 2,000 | LF | $0.00 |