This is a Statement of Work (SOW) for the purchase and installation of fitness equipment at the Riptide Fitness Center, Building 90017, 2nd floor, for one Federal Supply Schedule (FSS) contracting entity.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to deliver and install commercial-grade fitness equipment with accessories at the specified facility location as designated by the fitness director or staff. Equipment specifications require a silver frame with black upholstery. The contractor must connect all equipment to main power and available electrical outlets, test all IT components including screens and control buttons to ensure safe patron usage, and provide equipment manuals for each piece. After installation and assembly, the contractor shall conduct a comprehensive inspection and test with Government presence required. Final acceptance cannot occur until all testing is complete and equipment is verified to be in working order. The contractor shall warrant all labor and materials against defects and deficiencies for the manufacturer-specified period from the date of final inspection. All individuals performing installation work must be factory-trained and certified, and the contractor must be a factory-authorized warranty dealer capable of fulfilling manufacturer warranties. The Government seeks to schedule installation as soon as the vendor is capable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 04 - Combo.pdf | ||
| Attachment 02 - Salient Characteristics.pdf | ||
| Attachment 01 - Fitness Equipment Parts List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Purchase fitness equipment to replace & update gyms for 1 SOW FSS.
1. Description of Services.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install equipment with all accessories. The equipment will be installed and secured within the Riptide Fitness Center, Bldg 90017. The 1 SOW FSS is looking to schedule the installation date as soon as the vendor is capable.
2. Requirements
2.1 The equipment will be delivered to specific locations as ordered and placed in appropriate space as designated by fitness director or staff: Riptide Fitness Center, Bldg 90017, 2nd floor.
2.2 The equipment will be commercial grade and of specific color (silver frame, black upholster) as requested by fitness director.
2.3 Equipment shall be connected to the main power and connection to the panel box designated in each facility and space provided. Electrical outlets are available for plug and play.
2.4 Equipment shall be tested to ensure all IT components (i.e. screens, control buttons) are in working order and safe for patron usage.
2.5 Equipment manuals will be provided for each piece of equipment.
After installation and assembly, the contractor shall inspect and test equipment and all utilities/accessories. The Government shall be present for this test and inspection. Final acceptance of the equipment will not occur until testing is complete and everything is shown to be in working order. Electrical outlets are strategically placed within each facility to coordinate a safe environment for patrons to use equipment.
3. Warranty
The Contractor shall warrant all labor and provided materials to be free from defects and deficiencies for the period specified by manufacture from the date of final inspection.
4. Contractor Qualification
Individuals installing components shall be factory trained and certified. All individuals performing work shall be a factory authorized warranty dealer capable of fulfilling manufacturer’s warranties.