Questions for Clarification.pdf
PDF 77 KB Posted
- Attached to
- Construction Materials
- Solicitation number
- FA441724Q0121
About this file
This document appears to be a set of Questions for Clarification related to a federal contract opportunity. The key details are:
The RFQ solicitation is for Construction Materials, issued by the Department of the Air Force Special Operations Command. The questions focus on specific line items, including a 300KVA outdoor transformer (208/120V) and a 400A main breaker panel (208/120V, 3-phase, 4-wire). The customer has confirmed there will be no utility meter installed for this project, and the panel will be surface-mounted. The response includes details on the voltage, phase, and mounting requirements for these electrical equipment items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - FA441724Q0121 - Electrical Materials.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Could you please provide us with a litle bit more info on the transformer, line #44 on your sheet.
I need to know exactly what they need. Will there be voltage requirements and is it for indoor or outdoor?
A: Transformer will be 300KVA (12470D/120WYE), It will also be outdoor. (208120 Volt)
Regarding product from Line item #51 on the list, the panel board, my supplier, and I have a few ques�ons to make sure we are providing you with the correct one. May you please provide the following informa�on. Thank you!
2. Need name of u�lity company in customer area to check meters against the u�lity's approval list?
A: There will be no meter installed for this project.
3. Please verify if customer is needing a Meter Main, Meter Socket or Meter Combo? meter main
4. If a meter combo is needed, we need to know how many circuits/spaces?
5. If need flush or surface mount?
A: If referring to the panel it will be surface mounted
6. Need to know voltage required for the customers applica�on?
A: Panel will be 400amp main breaker, 208/120v, 3 phase, 4 wire.
7. Need to know how many phases needed? single or three phase?
A: 3phase
8. Need to know if need overhead or underground?
A: Underground
9. Need to know if bypass (horn, manual, lever, test block) needed or none?
How many Jaws?