Response to Questions from Offeror - 2 APR 24.docx
DOCX document 15 KB Posted
- Attached to
- Skeet Range Clubhouse
- Solicitation number
- FA441724Q0074
About this file
This document is a response to questions from an offeror regarding a federal contract opportunity for a Skeet Range Clubhouse/Trailer.
The key details are as follows: The government has extended the proposal period to April 5, 2024 at 2:00 PM (CST). The required office modular/mobile building must be 12'x56' with a 140 MPH wind load. It must include a restroom, open floor plan, at least one separate/securable room, HVAC, finished interior with electric and water. Set up, tie down, and connection to current utilities is required. No ramp is needed, but stairs and skirting are options. The government prefers metal roofing and siding, VCT flooring, and a hollow core wood door with a construction core suitable for BEST lock cores. The building is not required to be HUD Code compliant, but rather a modular office building. The estimated magnitude of the contract is between $25,000 and $100,000, and it is a NAFI requirement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Response to Questions from Offeror – 29 Mar 24
1. Offer requested additional time to submit quote. RESPONSE: Extended proposal period to 5 Apr 24 – 2:00 PM (CST).
2. Should set up be included? RESPONSE: Set up (tie down) and connect to current utilities is required.
3. Is ramp required? RESPONSE: No ramp required and if possible, include Stairs and Skirting should be listed as options or provide separate costs if possible.
4. The wind speed for your location is actually 160 MPH. Would you prefer to change to the code requirement? RESPONSE – Current Base requirements require Minimum of 140 for wind speed. Location of site is actually further inland and north of Hurlburt Field.
5. All exterior doors need an awning to prevent wind driven rain from wetting the floor. Do you want an option for awnings? RESPONSE - No awning option. Handle in house.
6. Do you want two exterior doors? RESPONSE -2 exterior doors are preferable. At least 1 on RIGHT side of building, when being towed, preferable.
7. What type of roof? Metal, white or black EPDM? Metal siding? VCT floor which has to be buffed and polished or LVT planks? RESPONSE - Metal roofing preferable, white EPMD acceptable. Yes, metal siding. VCT flooring
8. What do you mean by “securable” room? Just a standard keyed lock or keypad or do you want a construction core where you can install your own keyed lock? Solid core steel door or hollow core wood door or solid core wood door? RESPONSE - Hollow core wood door with a construction core suitable for BEST lock cores. Deadbolt lock suitable for BEST lock cores is also acceptable.
9. Can you clarify the following, is the government looking for a mobile trailer (HUD Code) or a modular trailer (DEO complaint)? Modular homes are more similar to traditional site-built homes in building codes and customization, while manufactured homes are built to a national code (HUD code). RESPONSE: Not HUD Code. Looking for an office 12 X 56.
END OF QUESTIONS