DRAFT Solicitation - FA441724R0004.pdf
PDF 1 MB Posted
- Attached to
- Civil Works IDIQ 2024 - Hurlburt Field, FL
- Solicitation number
- FA441724CivilWorks
About this file
This document provides details for a new Civil Works Indefinite Delivery Indefinite Quantity contract at Hurlburt Field, Florida. The single-award, firm-fixed-price IDIQ contract will have a one-year base period and four one-year options and cover repair, replacement, and minor construction of base infrastructure including pavements, water and wastewater systems, and facilities. Work will be performed through task orders issued against the contract and will support the 1st Special Operations Civil Engineer Squadron. The contract value is estimated to exceed $10 million. The solicitation is expected to be released on or about February 29, 2024. Prospective contractors must register in the System for Award Management and have a current NIST SP 800-71 security assessment. Proposals will be accepted electronically via the federal procurement system.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
Created On: 27 Feb 2024, 12:26 PM Central Standard Time
DRAFT
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
Civil Works IDIQ 2024 Hurlburt Field FL
FA441724R0004
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Estimated Quantity
Unit Unit Price Amount
Civil Works - Base YearThe work consists of, but not limited to, repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and other related work at Hurlburt Field, FL in accordance with the attached specifications and drawings.NOTE: The Line Item Cost shall come from Attachment 1 - Contract Line Item Listing (Bid Schedule)Ordering Period: 25 Sep 2024 - 24 Sep 2025
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Civil Works - Option Year 1The work consists of, but not limited to, repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and other related work at Hurlburt Field, FL in accordance with the attached specifications and drawings.NOTE: The Line Item Cost shall come from Attachment 1 - Contract Line Item Listing (Bid Schedule)Ordering Period: 25 Sep 2025 - 24 Sep 2026
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Civil Works - Option Year 2The work consists of, but not limited to, repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and other related work at Hurlburt Field, FL in accordance with the attached specifications and drawings.NOTE: The Line Item Cost shall come from Attachment 1 - Contract Line Item Listing (Bid Schedule)Ordering Period: 25 Sep 2026 - 24 Sep 2027
Pricing Arrangement: Firm Fixed Price
1 Job
Civil Works - Option Year 3The work consists of, but not limited to, repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and other related work at Hurlburt
FA441724R0004
Option Line Item
Field, FL in accordance with the attached specifications and drawings.NOTE: The Line Item Cost shall come from Attachment 1 - Contract Line Item Listing (Bid Schedule)Ordering Period: 25 Sep 2027 - 24 Sep 2028
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Civil Works - Option Year 4The work consists of, but not limited to, repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and other related work at Hurlburt Field, FL in accordance with the attached specifications and drawings.NOTE: The Line Item Cost shall come from Attachment 1 - Contract Line Item Listing (Bid Schedule)Ordering Period: 25 Sep 2028 - 24 Sep 2029
Pricing Arrangement: Firm Fixed Price
1 Job
FA441724R0004
Section C - Description/Specifications/Statement of Work
Requirements This is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Civil Works contract for the repair, replacement, and minor construction of base pavements, water distribution systems, wastewater distribution systems, and facilities including, but not limited to, sidewalks, driveways, roads, parking lots, drainage systems, base airfield pavements, water and wastewater distribution piping and facilities, force mains, lift stations, and other related work at Hurlburt Field, Florida. Construction projects will be awarded by individual task orders on an as needed basis. All work shall be in conformance with the requirements of the contract including, but not limited to, furnishing all materials, labor, plant, tools, equipment, transportation, supervision, management, and other services (including engineering/technical design support), items, and incidentals necessary for the successful completion of issued task order.
FA441724R0004
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-1 Contractor Inspection Requirements. Apr 1984 52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: POC will Inspect/Accept.
DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: POC will Inspect/Accept.
DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: POC will Inspect/Accept.
DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen
FA441724R0004
Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: POC will Inspect/Accept.
DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: POC will Inspect/Accept.
DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
FA441724R0004
Section F - Deliveries or Performance
Overall Contract Delivery Period
Delivery Period Delivery Date 25 Sep 2024
From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 365 Calendar Days Date of Notice to Proceed Receipt
Line Item Delivery Schedule Estimated Quantity
Address and POC
Delivery Period From 25 Sep 2024 to 24 Sep
1 Job Place of Performance DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE
RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Delivery Period From 25 Sep 2025 to 24 Sep
1 Job Place of Performance DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE
RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Delivery Period From 25 Sep 2026 to 24 Sep
1 Job Place of Performance DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE
RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
FA441724R0004
Option Line Item
Delivery Period From 25 Sep 2027 to 24 Sep
1 Job Place of Performance DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE
RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
Option Line Item
Delivery Period From 25 Sep 2028 to 24 Sep
1 Job Place of Performance DoDAAC: F2F323 CountryCode: USA
1 SOCES CEOE
AF BPN NO MILSBILLS PROCESSES, 415 INDEPENDENCE
RD
HURLBURT FIELD, FL 32544-5267
UNITED STATES
Michael Tuominen Email: michael.tuominen@us.af.mil Telephone: 579-6025
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.211-18 Variation in Estimated Quantity. Apr 1984 52.247-34 F.o.b. Destination. Nov 1991 52.247-35 F.o.b. Destination, Within Consignee's Premises. Apr 1984
FA441724R0004
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/a
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for
FA441724R0004
services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4417 Admin DoDAAC FA4417 Inspect By DoDAAC F2F323 Ship To Code F2F323 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) F2F332 Service Acceptor (DoDAAC) F2F332 Accept at Other DoDAAC F2F332 LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) F2F332 (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
252.232-7007 Limitation of Government's Obligation. (Apr 2014)
As prescribed in 232.706-70, use the following clause:
LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014)
(a) Contract line item(s) [Contracting Officer insert after negotiations] is/are incrementally funded. For this/these item(s), the sum of $ [Contracting Officer insert after negotiations] of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For item(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "Termination for Convenience of the Government." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit, and estimated termination settlement costs for
FA441724R0004
those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "Termination for Convenience of the Government."
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraphs (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "Disputes."
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph
(a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "Default." The provisions of this clause are limited to the work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) and (e) of this clause.
(h) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the clause of this contract entitled "Termination for Convenience of the Government."
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract $ ____ (month) (day), (year) $ ____ (month) (day), (year) $ ____ (month) (day), (year) $ ____ (End of clause)
FA441724R0004
Section H - Special Contract Requirements
ADDITIONAL CONTRACTOR INFORMATION:
VALID ID: all personnel requesting access to Hurlburt Field must possess a valid State or Government picture identification card.
Furthermore, individuals presenting identification cards from a state that is non-compliant with the REAL ID Act will require additional documentation to gain base access. Additional documentation includes a valid U.S. or foreign government issued passport, an employment authorization document that contains a photograph, or identification cards issued by federal state or local government agencies that include a photo and biographic information. A full list of REAL ID Act compliant and non-complaint states can be found at https://www.dhs.gov/real-id. Personnel requesting vehicle access to Hurlburt Field must provide a valid driver's license, current vehicle registration, and valid vehicle insurance.
REQUIRED INSURANCE (IAW FAR 28.306(b))
Reference FAR clause entitled "Insurance..." the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract. The Contractor will have the option to complete a form entitled "Notification of Compliance with Contract Insurance Requirements" that will be provided by the Government at time of award, or to submit an insurance certificate before any work commences on the installation. IAW FAR 28.307-2 Liability:
a. Workman's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational diseases with a minimum liability limit of $100,000.00.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000.00 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000.00 per person and $500,000.00 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (IAW DAFFARS 5352.242-9000)
a. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
b. Contractors will be required to complete a Contractor Employee Listing (to be provided at the pre-performance conference) in order for employees to gain access to the installation:
(i) The Contractor Employee List. This form must list every employee requiring access. Every time employees change; it must be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word "escort" or "E" next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). For work locations please use building numbers or areas (i.e. Bldg. 90618 or Red Horse, AMMO Area, etc.). Once completed, send the list to the Contracting Office representative in EXCEL format using secure means such as hand carry, mail or the DoD SAFE site (https://safe.apps.mil/). The Contracting Officer will then prepare and attach a cover letter and forward the Employee List to the Visitor Control Center.
c. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
d. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI31-501, Personnel Security Program Management, citing the appropriate paragraphs as applicable.
e. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. f. Failure to comply with these requirements may result in withholding of final payment. -
PREPARATION OF MATERIAL APPROVAL SUBMITTALS
FA441724R0004
Submittals contemplated by the clause herein entitled "Material and Workmanship" shall be accomplished on and in accordance with instructions pertaining to AF Form 3000 (Material Approval Submittal). Contractors should be prepared for Government processing time of a minimum of fifteen (15) days for review and approval of submittals. This time frame may take longer depending on complexity or submittal disapproval.
PREPARATION OF SCHEDULE FOR CONSTRUCTION CONTRACTS
The reports contemplated by clause entitled "Schedule for Construction Contracts" shall be accomplished on and in accordance with instructions pertaining to AF Form 3064 (Contract Progress Schedule) and AF Form 3065 (Contract Progress Report). Contractors shall submit a completed AF Form 3065 weekly to the Contracting Office for review and approval.
PROTECTION FOR PERSONALLY IDENTIFIABLE INFORMATION (PII) ON ELECTRONIC MEDIA
1. Protecting sensitive PII is everyone's responsibility. Sensitive PII is defined as personal information, which if lost, compromised or disclosed without authorization, could result in substantial harm, embarrassment, inconvenience, or unfairness to an individual.
a. Some information, standing alone, is sensitive PII, such as: social security number in any form (including the 'last four'), alien registration number, biometric information, and financial account numbers.
b. Some information is sensitive PII when grouped with the person's name or other unique identifiers (like an address or phone number), such as: driver's license number, medical information, citizenship or immigration status, passport number, full date of birth, and authentication information, such as mother's maiden name, place of birth, or phone passwords.
2. Contractors shall:
a. Encrypt all e-mails containing sensitive PII sent to or from an unclassified e-mail account;
b. When encrypted e-mail is not feasible, but electronic transmission of sensitive PII is operationally required, will use a DoD-approved file exchange, such as the DoD Safe Access File Exchange, which can be found at https://safe.apps.mil;
c. Not send sensitive PII to any person who does not have an official need for such information; and
d. Not post or place sensitive PII on social media, share drives, SharePoint sites, or other similar collaborative environments, unless required for daily operation and the drive or site is password-protected or has other similar robust access controls which limit access only to persons who have an official need for such information.
3. These rules apply to any contractor doing business with Hurlburt Field.
4. Failure to comply with these rules may result in termination and/or debarment.
HURRICANE SEASON
Normally, the period from 1 June through 30 November is the premier season for Hurricanes, Tropical Storms and Tropical Depressions for Hurlburt Field, FL and surrounding areas. In the event of a hurricane and at the direction of the Contracting Officer, the Contractor shall be responsible for:
a) Securing all equipment, materials and cleaning up the work area;
b) Continuing normal operations until directed otherwise by the Contracting Officer;
c) Evacuating the base as directed by the Contracting Officer;
d) Provide a POC to the Contracting Officer to recall the contractor after the danger is over;
e) Be prepared to resume normal operations when notified by the Contracting Officer. The work site should befree of objects capable of becoming airborne and causing a hazard. For construction contracts, per FAR clauses 52.236-9 and 52.236-12, you are required to maintain your work area free of debris and in a safe and secure condition at the completion of each workday with particular care during the hurricane season.
FA441724R0004
https://safe.apps.mil;
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-2 Security Requirements. (Alternate II) Mar 2021 Alternate II Apr 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
Dec 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Nov 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.210-1 Market Research. Nov 2021 52.215-2 Audit and Records-Negotiation. Jun 2020 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.215-19 Notification of Ownership Changes. Oct 1997 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.219-8 Utilization of Small Business Concerns. Sep 2023 52.219-33 Nonmanufacturer Rule. Sep 2021 52.222-1 Notice to the Government of Labor Disputes. Feb 1997 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-34 Project Labor Agreement. May 2010 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. May 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022 52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-5 Pollution Prevention and Right-to-Know Information. (Alternate I) May 2011 Alternate I May 2011 52.223-6 Drug-Free Workplace. May 2001 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021
FA441724R0004
52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-16 Progress Payments. (Alternate I) Nov 2021 Alternate I Mar 2000 52.232-17 Interest. May 2014 52.232-23 Assignment of Claims. May 2014 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. Apr 1984 52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007 52.244-5 Competition in Subcontracting. Dec 1996 52.244-6 Subcontracts for Commercial Products and Commercial Services. Dec 2023 52.247-5 Familiarization with Conditions. Apr 1984 52.247-68 Report of Shipment (REPSHIP). Feb 2006
52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements).
Apr 2012
52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984 52.249-10 Default (Fixed-Price Construction). (Alternate I) Apr 1984 Alternate I Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.250-1 Indemnification Under Public Law85-804. Apr 1984 52.253-1 Computer Generated Forms. Jan 1991
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. Jan 2023 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.203-7003 Agency Office of the Inspector General. Aug 2019 252.203-7004 Display of Hotline Posters. Jan 2023 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.
Jan 2023
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Jun 2023
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
May 2019
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7004 Drug-Free Work Force. Sep 1988 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023
252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.
Jan 2023
FA441724R0004
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
Jan 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.244-7001 Contractor Purchasing System Administration. May 2014
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. (Dec 1989)
As prescribed in 4.103 , insert the following clause:
Approval of Contract (Dec 1989)
This contract is subject to the written approval of the Contracting Officer[identify title of designated agency official here] and shall not be binding until so approved.
(End of clause)
52.204-2 Security Requirements. (Mar 2021)
As prescribed in 4.404(a), insert the following clause:
Security Requirements (Mar 2021)
(a) This clause applies to the extent that this contract involves access to information classified "Confidential," "Secret," or "Top Secret."
(b) The Contractor shall comply with-
(1) The Security Agreement DD Form441), including the National Industrial Security Program Operating Manual (32 CFR part 117); and
(2) Any revisions to that manual, notice of which has been furnished to the Contractor.
(c) If, subsequent to the date of this contract, the security classification or security requirements under this contract are changed by the Government and if the changes cause an increase or decrease in security costs or otherwise affect any other term or condition of this contract, the contract shall be subject to an equitable adjustment as if the changes were directed under the Changes clause of this contract.
(d) The Contractor agrees to insert terms that conform substantially to the language of this clause, including this paragraph (d) but excluding any reference to the Changes clause of this contract, in all subcontracts under this contract that involve access to classified information.
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)
As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10[Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than what is specified on individual task orders.* The time stated for completion shall include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.211-12 Liquidated Damages-Construction. (Sep 2000)
As prescribed in 11.503(b), insert the following clause in solicitations and contracts:
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the
FA441724R0004
Government in the amount of $235.01[Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.216-4 Economic Price Adjustment-Labor and Material. (Jan 2017)
As prescribed in 16.203-4(c), insert the following clause:
Economic Price Adjustment-Labor and Material (Jan 2017)
(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract. The notice shall include the Contractor's proposal for an adjustment in the contract unit prices to be negotiated under paragraph
(b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor's adjustment proposal.
(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the labor rates (including fringe benefits) and unit prices of material shown in the Schedule results in an adjustment allowable under paragraph (c)(3) of this clause. The Contracting Officer shall modify this contract (1)to include the price adjustment and its effective date and (2)to revise the labor rates (including fringe benefits) or unit prices of material as shown in the Schedule to reflect the increases or decreases resulting from the adjustment. The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.
(c) Any price adjustment under this clause is subject to the following limitations:
(1) Any adjustment shall be limited to the effect on unit prices of the increases or decreases in the rates of pay for labor (including fringe benefits) or unit prices for material shown in the Schedule. There shall be no adjustment for-
(i) Supplies or services for which the production cost is not affected by such changes;
(ii) Changes in rates or unit prices other than those shown in the Schedule; or
(iii) Changes in the quantities of labor or material used from those shown in the Schedule for each item.
(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor's failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor's control and without its fault or negligence, within the meaning of the Default clause.
(3) There shall be no adjustment for any change in rates of pay for labor (including fringe benefits) or unit prices for material which would not result in a net change of at least 3 percent of the then-current total contract price. This limitation shall not apply, however, if, after final delivery of all line items, either party requests an adjustment under paragraph (b) of this clause.
(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 10 percent of the original unit price. There is no percentage limitation on the amount of decreases that may be made under this clause.
(d) The Contracting Officer may examine the Contractor's books, records, and other supporting data relevant to the cost of labor (including fringe benefits) and material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.
(End of clause)
52.216-18 Ordering. (Aug 2020)
As prescribed in 16.506(a), insert the following clause:
Ordering (Aug 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 25 September 2024 through 24 March 2030[insert dates].
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when-
FA441724R0004
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either-
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
52.216-19 Order Limitations. (Oct 1995)
As prescribed in 16.506(b), insert a clause substantially the same as follows:
Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500[insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $3M[insert dollar figure or quantity];
(2) Any order for a combination of items in excess of $3.5M[insert dollar figure or quantity]; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .