Questions and Answers Updated 17 Sep 21.pdf
PDF 113 KB Posted
- Attached to
- Raw Materials BPA Federal contract opportunity
- Solicitation number
- FA441721QC207
About this file
This document contains questions and answers regarding a federal solicitation for raw materials. The solicitation is seeking options for hydroseed mixtures to be applied at Hurlburt Field in Florida, including mixtures only, mixtures with equipment, and contracted application services. The hydroseeding should be priced and provided in gallons. Concrete and aggregate materials should be quoted by the cubic yard and ton respectively, with minimum quantities of 10 cubic yards for concrete and 20 tons for rock. Delivery locations will be determined individually but drivers will not require security clearance as long as they have no felonies. Concrete mix designs may vary between 3,000 and 6,500 psi. Pricing should remain in gallons for hydroseed rather than square feet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Raw Material BPA 20 Sep 2021.pdf | ||
| Attachment 1 BPA Raw Materials Bid Schedule Updated 20 Sep 21.xlsx | XLSX spreadsheet | |
| Questions and Answers.pdf | ||
| Updated RFQ Raw Material BPA 31 Aug 2021.pdf | ||
| Attachment 1 - BPA Raw Materials Bid Schedule.xlsx | XLSX spreadsheet | |
| RFQ Raw Material BPA 25Aug 2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. Q: In regards to “Hydroseed”, are you looking for only the mixture of hydroseed or the whole machine + mixture? Do you know what the estimated gallons per year is?
A: Maximum 50,000 gallons per year. If possible we would want to have a few different options A. Mixture Only B. Mixture and Machine C. Mixture and Contracted Application D. Mixture, Contracted Application, and Aftercare.
2. Q: What are the specifics on the type of Sod requested for each area?
A: Argentine Bahia ‐ no substitutions
3. Q: Hydroseeding normally includes application and is priced by the area either square foot, or by the acre. Please clarify.
A: Square feet.
4. Q: Are there any minimum quantities known for each material?
A: For concrete, it’s 10 CY and rock 20 tons. Exact amounts are not known.
5. What will be the delivery address, and will the drivers need to have security clearance?
A: The delivery address will be determined at the time a call is made. The drivers will not need to have a security clearance, however, they cannot have any felonies on their record. Security forces will check their license and they will be escorted on base.
6. What is the specific ratio of the Portland cement mix (e.g. % amount of cement, aggregate, sand, water)?
A: Concrete and Portland will depend on mix design, need to be able to adjust designs from 3K‐
6.5K psi.
7. Is “square feet” a more accurate unit of measure to base the pricing of hydroseed on rather than “gallons”?
A: Pricing for hydroseed should remain in “gallons”.
File details come from the government source that posted it. Updated .