24 Sep 20 Electrical Equipment Q and A.pdf
PDF 126 KB Posted
- Attached to
- Electrical Components
- Solicitation number
- FA441720QC04901
View the file
Other files
| File | Type | Posted |
|---|---|---|
| List of Materials.pdf | ||
| 52.204-24 and 26.pdf | ||
| RFQ - FA441720QC04901 Electrical Equipment.pdf | ||
| Custom Panel Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Equipment - FA441720QC04901 Question and Answer
1. On the 12 sol cu Thhn Simpull packs do you want 2000 ft simpull packs?
(The Grainger number is for 1,000.)
A: I need 4000 ft of wire
2. Item #2 30 ten foot sticks or 300 ten foot sticks?
A: 300 ten foot sticks
3. Item #24 40 ten foot sticks or 400 ten foot sticks?
A: 400 ten foot sticks
4. Item #6 assume 1-100 ft coil not 100 - 100 ft coils.
A: Need 1 – 100 ft coil
5. What breakers are in the panel and confirm MLO or MCB?
A: Mcb is the 400 amp breaker in the panel and the 100 amp breakers in the panel feed the four warehouses
6. Voltage of the panel?
A: 120/208
7. Main lug or main circuit breaker needed?
A: CB needed
8. AIC rating needed?
A: 400 amps on main breaker and 100 for the sub breakers in the panel
9. What does 4 outputs per phase mean? Is that 4 wires per phase?
A: Yes
10. What does 2 inputs per phase mean?
A: For paralleling circuits