Statement of Work
1 SOFSS/FSVS
Bleacher Requirements
1. SCOPE. This document establishes the minimum requirements for purchase and installation of bleachers for the 1 SOFSS/FSVS, Aderholt Fitness Center, Hurlburt Field, FL.
2. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide, assemble, and install the furniture requested under this Statement of Work.
3. REQUIREMENTS. 3 banks of telescoping gymnasium bleachers. Net seating approx. 230.
a. 10” plastic Courtside Seats, 9 tiers, 22” Row spacing with 9-5/8” rise, electric power with pendant operation.
b. The first bank (left section when looking at bleachers) is arranged: Aisle on left with railing, handicap section in front row-right side, each row approx. 9 seats, 8’ in height (from row to row), 17’ in length (from seat to seat).
c. The second bank (middle section when looking at bleachers) is arranged: Aisle in middle with railing, handicap sections on both ends of front row, each row approx. 8 seats. AFSOC logo on bleacher- visible when closed, fits symmetrically within the 8’x17’ area. (see section 11).
d. The third bank (right section when looking at bleacher) is arranged: Aisle on right with railing, handicap section in front row-left side, each row approx. 9 seats, 8’ in height (from row to row), 17’ in length (from seat to seat).
4. SPECIFICATIONS. Bleachers will replace existing bleachers located in bldg. 90517. Each back will be approx. 18’-6” wide. 10” plastic seating, 9 rows, 22”row spacing, with a 9-5/8” rise, electric power with pendant operation. AFSOC logo visible when closed on two outside banks. Each bleacher bank will be fastened to the wall.
5. COLORS. All colors and finishes will be chosen by the 1 SOFSS/FSVS prior to purchase.
6. SITE SURVEY. The contractor can conduct a site survey with 1 SOFSS/FSVS personnel to confirm exact dimensions, specifications, and requirements, if needed.
7. PRODUCT INSTALLATION. The contractor shall provide all components, hardware, and parts necessary for proper assembly and installation. The contractor shall be responsible for replacing all missing or defective components, hardware, and/or parts. The contractor will dispose of the existing bleachers and all trash associated with delivery and installation using dumpsters provided by the 1 SOFSS. The contractor shall provide sufficient personnel to complete delivery, installation, and cleanup, unassisted, within five business days, working only during normal business hours of MON-FRI 5:00 AM to 10:30 PM and SAT-SUN 8:00AM to 5:00 PM. The contractor will not work on federal holidays, or other holidays or non-work days observed by the 1 SOFSS.
8. Federal Holidays. The following is a list of federal holidays observed by this installation.
New Year's Day, January 1 or the Friday preceding or Monday following Martin Luther King's Birthday, 3rd Monday in January
| President's Day, 3rd Monday in February |
| Memorial Day, last Monday in May |
| Independence Day, July 4 or the Friday preceding or Monday following |
| Labor Day, first Monday in September |
| Columbus Day, 2nd Monday in October |
Thanksgiving Day, 4th Thursday in November Christmas Day, December 25 or the Friday preceding or Monday following
9. GOVERNMENT FURNISHED PROPERTY AND SERVICES. There will be no government furnished property or services provided for this effort except dumpsters for waste disposal.
10. PRODUCT WARRANTY. The contractor shall provide a warranty on the renovation required under this Statement of Work. Defective components shall be repaired as soon as possible but within a reasonable amount of time. This includes any damage done during installation. Repair and replacement shall be provided at no additional cost, including freight and labor. Normal wear and tear is exempt. The contractor shall repair any damage done to existing facilities during deliver and installation.