PWS_-_VTE_Maintenance_Amended_12_Jul_16.pdf

PDF 66 KB Posted

Attached to
Vertical Transportation Equipment (VTE) Maintenance, Repair & Inspection Services
Solicitation number
FA4417-16-T-0013
Issued by

About this file

Amended PWS is attached. Please note only the Appendix portion has changed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA4417-16-T-0013

DEPARTMENT OF THE AIR FORCE

AIR FORCE SPECIAL OPERATIONS COMMAND

1st SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON

PERFORMANCE WORK STATEMENT

FOR

VERTICAL TRANSPORTATION EQUIPMENT

(VTE) MAINTENANCE, REPAIR &

INSPECTION SERVICES

HURLBURT FIELD, FLORIDA

Original – 12 May 2016

Amendment 1 – 12 July 2016

TABLE OF CONTENTS

SECTION NUMBER AND TITLE PAGE NUMBER

1. Description of Services 3

2. Excluded Services 3

3. Definitions 4

4. Maintenance and Inspection Services 5

5. Repair Service Calls 6

6. Services Summary 7

7. Government Furnished Property and Services 7

8. General Information 8

Appendix A: VTE Equipment Listing

PERFORMANCE WORK STATEMENT FOR

VERTICAL TRANSPORTATION EQUIPMENT (VTE) MAINTENANCE, REPAIR &

INSPECTION SERVICES

1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to inspect, maintain, and repair the real property vertical transportation equipment (VTE) at Hurlburt Field AFB in a manner that ensures continuous and safe operation. The contractor shall provide full maintenance and repair services with the exception of the exclusions listed in paragraph 2 below. The VTE and their locations are listed in Appendix A. NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix A: freight and passenger elevators, material lifts/dock levelers, and dumbwaiters.

1.1. This full maintenance contract requires the VTE service provider (contractor) to take total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, replacement parts, and routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts, repairs or replacement invoicing. The contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.

1.2. Work conducted on VTE shall be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2007 (or applicable code for the year the VTE was put in service, or current applicable code), Safety Code for Elevators and Escalators (ASME A17.1), ANSI/ASME A17.2-2010, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment), ASME A17.3-2011, Safety Code for Existing Elevators and Escalators (applicable to equipment), National Fire Protection Association Standards (NFPA), Unified Facilities Criteria (UFC) 3-600-01, Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM).

1.3. Emergency Elevator Rescue Training. The contractor shall provide Emergency Elevator Rescue Training (ANSI/ASME 17.4, “Guide for Emergency Personnel”) for the Hurlburt Field Fire Department every 6 months. Training shall be conducted on two days, preferably within the same week, once for each Fire Department shift. The 2 sessions shall be considered one Training event and shall be billed as such. Training shall include, but not be limited to: Moving an Elevator, Adjacent Car Rescues, Forcing Doors, Breaching Elevator Shafts, Elevator Fires, and Elevator Shaft Fires. The number of personnel trained during each training event shall consist of approximately 18 personnel.

2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a. modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)

2.2. Acts by parties other than the contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, and acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.

2.3. Additional items excluded from the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting that are not solely dedicated to the VTE, air conditioners, and heaters.

2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoist way doors and frames is not included in the basic full maintenance service.

2.5. In the event that the contractor encounters an item of work included in paragraph 2.1 through 2.4, the contractor shall report the situation to the Authorized Government Representative (AGR).

The report will include the work location, a detailed scope of the required work, justification for contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). The contractor shall not perform work not covered under this performance work statement and resultant contract unless requested to do so by the Contracting Officer in writing. NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

3. DEFINITIONS:

3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it shall safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2. Alteration. An alteration to an existing VTE is not included under this full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

4. MAINTENANCE AND INSPECTION SERVICES:

4.1. The contractor shall determine the working order and condition of all VTE listed in Appendix A within thirty (30) calendar days of contract award and provide a written record of the status of the equipment to the AGR in this timeframe. The Government will either replace missing items, repair all items not in working and serviceable condition, or the CO may direct the contractor to replace the missing items, accomplish the repair, and reimburse the contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3. The contractor and the CO, after conferring with the AGR, shall certify their agreement as to the working order of the equipment.

All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer.

4.2. The contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include any/all required inspections, timelines for inspections and maintenance to be performed. The contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements.

4.3. The contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation to ensure a 95% operational status of reliable and continuously safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required to be completed by the contractor.

4.5. The contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three-

(3) - year test shall be scheduled in conjunction with the annual test two years later from the first annual test.

4.6. The Government may perform inspections of the VTE at no cost to the contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the contractor will be notified in writing of any determination and may be responsible for the corrective actions.

4.7. The contractor shall prepare and submit a written report within two (2) business days of work.

The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.

4.8. The contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/AGR. The index and copies of certificates shall be delivered to the CO/AGR upon request; however, no later than one (1) business day of a request to review.

5. REPAIR SERVICE CALLS. The contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. The contractor shall repair and/or replace components of the VTE at no additional cost to the Government. Replaced components will be (OEM) Original Equipmet Manufacture items. If an OEM item cannot be used, items identical in specification, design, and performance to (OEM) Original Equipmet Manufacture items may be substituted. Substitution of a different component is only permitted when an OEM replacement is not available and must meet be an industry accepted equivalent. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.

5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.1. Routine service calls shall be placed by the CO/AGR during the hours of 0600-1600L Monday – Friday excluding Federal Holidays. (See para 8.4). The contractor shall not respond to routine calls made by other than the CO/AGR.

5.1.2. The contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the Government within four (4) hours after receipt of the call on regular scheduled work days/hours.

5.1.3. The contractor shall report to the emergency work location, survey the repair situation, and commence repairs on all covered items under “Full Maintenance”. Non covered repairs, per para.

2 require the contractor provide the CO/AGR an estimate of time and cost necessary to bring the VTE back to full operation. The contractor shall commence repair work after notification from the CO/AGR. The contractor shall prepare and submit to the CO/AGR a written report within two

(2) business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties.

5.2.1. Emergency service calls will be placed either by the CO/AGR or the Hurlburt Field Fire Dispatcher ONLY.

5.2.2. The contractor shall respond in person to the VTE and begin work on emergency service calls within one (1) hour after receipt of the call.

5.2.3. The contractor shall prepare and submit to the CO/AGR a written report within two (2) business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

6. SERVICES SUMMARY.

The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.

SS # Performance Objective PWS Para Performance Threshold

SS 1 Written Maintenance Control Program (MCP) for each VTE for all equipment.

MCP identifies all maintenance intervals to include safety inspections.

4.2 MCP in accordance with ASME

A17.1 delivered to CO within 30 calendar days of contract award.

SS 2 VTE Service Availability 4.3 VTE availability is 95%. Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).

SS 3 Repair Service Call Routine – Response Time.

5.1.2 Response to routine service calls are

on-time 100% of the time on a monthly basis.

SS 4 Repair Service Call Emergency – Response Time.

5.2.2 Response to emergency service calls

are on-time 100% of the time on a monthly basis.

SS 5 Quality Control.

8.2 Only two call backs of the same

problem (same instance) each month.

SS 6 Preventative Maintenance - MCP Adherence

4.7., 5.1.3, 5.2.3.

Preventative maintenance performed to MCP 100% of time.

SS 7 Reporting 2.5, 4.7, 4.8, 5.1.3, 5.2.3

Submit reports in a manner consistent with PWS 100% of the time.

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government is not providing any Government furnished property (GFP).

8. GENERAL INFORMATION.

8.1. Contractor Personnel.

8.1.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work to ensure it meets the requirements of this contract.

The name of this person and an alternate or alternates, who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer within fifteen (15) days of contract award. The Contractor shall also provide to the CO the names and phone/pager numbers of Contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the Contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

8.1.2. Contractor Employees. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

8.1.2.1. Contractor employees shall present a neat appearance and be easily recognized as contractor employees.

8.1.3. Contractor/Employee Base Pass and Identification, Special Clearances, and Vehicle Passes. The contractor shall obtain base identification and vehicle passes, if required, for all Contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor employees are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.

8.1.3.1. The contractor shall complete and submit the following form to 1 SOCONS within fifteen

(15) business days of contract award in order for employees to gain access to the installation:

a. Contractor Employee Listing

8.1.4. The Contractor Employee List. This form shall list every employee requiring base access. Every time employees change, it shall be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word “escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). For work locations use building numbers or areas (i.e. Bldg.

90517, 90232 or 91007). Once completed, email the list to the Contracting Office representative in EXCEL format. The Contracting Officer will then prepare and attach a cover letter, and forward the Employee List to the Visitor Control Center.

8.1.4.1. Upon notification that your employee list has been forwarded to the Visitor Control Center, the employee shall complete the DHS I-9 form and hand carried to the Visitor Control Center. The form shall be signed by the employee and the employer or designated representative. If everything is in order, they will receive a contractor badge. If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance.

NOTE: The section of the Visitor Control Center administrating this function is closed after 1300 CST (1:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed.

8.1.4.2. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

8.1.4.3. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to employees are returned to the issuing office.

8.2. Quality Control. The contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the contractor ensures quality performance during the contract period of performance. Quality work will be determined if there are no more than two call backs of the same problem (same instance) each month as notated in the Services Summary.

The contractor shall maintain the QCP throughout the period of performance of the contract. The CO shall be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the Government upon request. The QCP shall include the inspection forms and records which will be used for the service. The contractor shall identify to the CO/AGR the responsible quality control inspector to notify in case of customer complaints.

8.3. Quality Assurance. The Government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

8.4. Hours Of Operation. Normal hours of operation shall be between the hours of 0600 to 1600 hours Monday through Friday. The Government reserves the right to change hours of operation or restrict contractor access. The contractor may request to work hours other than normal duty hours. Approval for changes in normal work hours, extended hours during exercises or mission changes will not be unreasonably withheld.

8.4.1. The contractor is not required to provide services on all recognized Federal holidays-current holidays include: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day unless it is an emergency.

8.4.2. The contractor shall work whatever hours necessary to resolve an emergency occurring within his or her area of responsibility.

8.5. Security Requirements. All personnel employed by the contractor in the performance of this contract and any representative(s) of the contractor entering the Government installation shall abide by all security regulations of the installation.

8.5.1. Restricted Areas/Access. During the course of the contract, certain areas/sites may be restricted or closed to contractor personnel. The contractor shall comply with all requirements for entry to include signing in or securing an entry badge. In addition, unscheduled gate closures may occur at any time and personnel entering or exiting the installation may experience delays.

8.5.2. Government and Personal Property. The contractor shall be responsible for safeguarding all Government property. The contractor shall conduct work so that property, personnel, and work areas are protected at all times from inconvenience, damage, or injury. In the event of damage of any nature, caused by contractor operations or employees, due to improper protection, precaution, or safety measures, such damages shall be repaired or replaced by the contractor at his/her expense.

8.6. Confined Spaces. It is the contractor's sole responsibility for compliance with OSHA. The Hurlburt Field Installation Confined Space Team has classified all elevators on the installation as Permit Required Confined Spaces (PRCS) due to crush and electrical hazard potential of the machinery. Comply with 29 CFR 1910.146, Permit Required Confined Spaces, (General Industry) and Air Force Instruction (AFI) 91-203, Air Force Consolidated Occupational Safety Instruction.

Contractor shall contact the installation occupational safety office (1 SOW/SEG) at (850) 884- 7497 or 884-7233 for coordination of PRCS entry operations and review of the contractor's OSHA Confined Space Plan prior to commencement of PRCS operations. The contractor shall submit an after-action statement to the AGR at the conclusion of the contract or work to provide information regarding hazards encountered or created in the PRCS(s).

8.7. Continuation of Essential Department of Defense Services During Crisis Declared By The National Command Authority or Overseas Combatant Commander. IAW DoDI 3020.37 (Continuation of Essential DoD Contractor Services During Crisis) and AFI 63-124, unless otherwise directed by an authorized Government representative, it is determined that services as identified in this Performance Work Statement (PWS) are NOT essential for performance during a crisis.

8.8. Special Qualifications. The contractor shall be licensed/certified by the State in which the work is conducted as specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet Federal and State certification requirements (documentation provided to CO/AGR upon request) in maintenance of VTE.

8.9. Schedule Coordination. The contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/AGR. The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility.

8.10. Environmental Control. The contractor shall comply, and assure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals utilized in performance of duties on Hurlburt Field AFB. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 Hazardous Substances, into the environment, the contractor shall immediately notify the CO/AGR and Hurlburt Field Fire Dispatch. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.

8.11. Asbestos. The contractor shall comply with Section 29 CFR 1910.1001(j)(7)(iv). VTE may be located in facilities that may contain ACM (Asbestos Containing Materials) or PACM (Presumed Asbestos Containing Materials). The contractor (not the Government) shall determine if any exposure to ACM may occur in performing work under the contract.

8.12. Contractor Full-Time Equivalent Reporting.

8.12.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields at the Contractor Manpower Reporting Application (CMRA) site: http//www.ecmra.mil.

8.12.2. Reporting inputs will be for labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

8.13. Deliverables.

Deliverables PWS Paragraph Frequency Deliver To

Contract Manager & Alternate(s) Names

8.1.1.

Within fifteen (15) business days of contract award & if there is a change in staffing

Contracting Officer

Contractor Employee Listing

8.1.3.1.

Within fifteen (15) business days of contract award & every time employees change

Contracting Officer

Maintenance Control Plan (MCP)

4.2

Within thirty (30) calendar days of contract award & every time the MCP changes

Contracting Officer

Quality Control Plan

(QCP)

8.2

Within thirty (30) calendar days of contract award & every time the QCP changes

Contracting Officer

Maintenance Reports 2.5, 4.7, 4.8, 5.1.3, 5.2.3

Within two (2) business days after each service is performed

Contracting Officer

& AGR

Full-Time-Equivalent (FTE) Data

8.11.1.

No later than 31 October of each calendar year http://www.ecmra.

mil

9.0 APPENDICES.

A. VTE EQUIPMENT LISTING

END OF PERFORMANCE WORK STATEMENT

APPENDIX A

VTE Equipment Listing DATED 12 July 2016

Item

Bldg

Function Type of

Unit Capacity Year

Installed* Manufacturer Comments

1 1 AFSOC

HDQTRS

Pass Unit

2,500 2003 National Elevator

Hydro

2 1 AFSOC

HDQTRS

Pass Unit

2,500 2003 National Elevator

Hydro

3 90005 C2TIG Pass Unit

3,000 2016 National Elevator

Hydro/MRL

4 90020 505 Training Sq Pass Unit

3,500 2005 National Elevator

Hydro

5 90021 505 Training Sq Pass Unit

3,500 2005 National Elevator

Hydro

6 90028 AVIONICS Pass Unit

3,500 1996 National Elevator

Hydro

7 90028 AVIONICS Freight Unit

10,000 1996 National Elevator

Hydro

8 90028 AVIONICS Freight Unit

5,000 2003 National Elevator

Hydro

9 90029 1 SOAGS Pass Unit

2,000 1996 Continental Hydro

10 90059 BASE

CONTRACTOR

Pass Unit

2,000 2001 Kone Hydro

11 90145 15 SOS Pass Unit

2,000 Unknown Mowery Hydro

12 90206 720 Special Tactics Group

Pass Unit

3,000 2010 Kone MRL

13 90207 11th Intelligence Squadron

Operations

Pass Unit

3,000 2009 Kone MRL

14 90210 WING

HDQTRS

Pass Unit

2,500 2002 National Elevator

Hydro

15 90210 WING

HDQTRS

Pass Unit

2,500 2002 National Elevator

Hydro

16 90322 1 SOCES Pass Unit

2,500 2009 Kone MRL

17 90333 AFSOC

ANNEX

Pass Unit

2,000 2004 Kone Hydro

18 90349 HQ AFSOC Pass Unit

2,500 2008 Kone MRL

19 90502 BILLETING Pass Unit

2,500 1998 Continental Hydro

20 90503 JSOU SCHOOL Pass

2,000 1993 National Elevator

Hydro

21 90517 ADERHOLT

GYM

Pass Unit

2,500 1992 ESCO Hydro

22 90527 413 Flight Test Sq

Pass Unit

2,500 2012 ThyssenKrupp MRL

23 90531 STTS Pass Unit

4,500 2005 Control Dynamics

Hydro

24 90535 Combat Weather

Pass Unit

3,000 2010 Kone MRL

25 90606 1 SO Security Force Sq

Material Lift

2,000 Unknown Southworth N/A

26 90624 BASE COMM Pass Unit

2,500 2003 Mowery Hydro

27 90639 BASE SUPPLY Pass Unit

2,500 2014 Kone MRL

28 90639 BASE SUPPLY Material Lift

10,000 2014 Custom Industrial

N/A

29 90639 BASE SUPPLY Material Lift

6,000 2014 Custom Industrial

N/A

30 90700 EASON HGR Freight Unit

2,500 2015 National Elevator

Hydro

31 90700 EASON HGR Freight Unit

2,500 2015 National Elevator

Hydro

32 90710 BASE SUPPLY Pass Unit

2,100 1991 National Elevator

Hydro

33 90710 BASE SUPPLY Freight Unit

2,500 1991 National Elevator

Hydro

34 90727 34 Special Ops Sq

Pass Unit

2,000 2008 Kone MRL

35 90729 CONTROL

TOWER

Pass Unit

2,000 Unknown Hollister Whitney

Traction

36 90742 4 SOS Pass Unit

2,500 1999 Continental Hydro

37 90801 319 SOS Pass Unit

3,500 2005 National Elevator

Hydro

38 90802 ALTERNATE

XP FACILITY

Pass Unit

2,000 2007 Mowery Hydro

39 90918 New Soundside Club

Pass Unit

2,500 2009 ThyssenKrupp Hydro

40 90918 New Soundside Club

Pass Unit

2,500 2009 ThyssenKrupp Hydro

41 91007 RIPTIDE GYM Pass Unit

3,500 2003 National Elevator

Hydro

42 91029 SIMULATOR Pass Unit

2,500 2000 National Elevator

Hydro

43 91029 SIMULATOR Pass

3,500 1996 National Elevator

Hydro

44 91029 SIMULATOR Pass Unit

4,000 2003 National Elevator

Hydro

45 91258 1 SOLRS Material Lift

2,000 Unknown Southworth N/A

46 91259 20 SOS Pass Unit

2,000 1997 Continental Hydro

47 91266 801 Aircraft Maintenance Sq

Material Lift

2,000 Unknown Southworth N/A

* Year installed is on or about the year specified and may not be 100% accurate.

File details come from the government source that posted it. Updated .