Drawings.pdf

PDF 7 MB Posted

Attached to
Renovate 823 RHS Wash Rack Bldg 91144
Solicitation number
FA4417-15-R-0020
Issued by

About this file

Drawing FTEV 09-1033

View the file

Other files

File Type Posted
Questions_ _Answers.pdf PDF
FA4417-15-R-0020_Amendment_2.pdf PDF
FA4417-15-R-0020_Amendment_1.pdf PDF
Wage_Rates.pdf PDF
FA4417-15-R-0020.pdf PDF
Performance_Questionnaire.pdf PDF
Specifications.pdf PDF
Financial_reference.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHELTER

TEE

GOLF

S

S

WT-12

MT-12 WT-14

MT-14

MT-15

WT-15

WT-13

MT-13

WT-11

COURSE

SHELTER

TEE

SS

S

S

S

G-12

S

G-13

G-14S

G-11

S

G-3

SHELTER

TEE

G-10 S

S

SS

S

MT-11

S

MT-8

WT-8

MT-6

S

S

S s

MT-10

MT-1

WT-1

MT-6

WT-3

MT-2

WT-2MT-9

WT-9

MT-18

WT-18

WT-10

S

PRACTICE TEE

FAIRWAY

PRACTICE

S

S

G-8

G-5

M-3

S

S G-1

G-2

S

S

S

S

GREEN

PRACTICE

G-9 S

S S

S

S

G-18

SS

S

S

S

MT-8

WT-8 S

S

S S

S

S

S

S

S

WT-6

M-4

MT-16 WT-16

S

G-15

S

S

S

WT-17 MT-17

G-17

G-16

SS

S

B O U N D A R Y

B O U N D A R Y

BOUNDARY

R E S E R V A

TI

O N

RESERVATIONRESERVATION

R E S E R V A T I O N

R E S E R V A T I O N

HURLBURT

LAKE

STATIONSTATION

SUB-SUB-

TANK

TA

NK

OIL/WATER SEPARATOR

TANK

WATER

JP-4

TANKS

OI

L/

WA

TE

R

TA

NK

S

SE

PA

RA

TO

R

OIL/WATER

SEPARATORS

TANK

P.O.L.

PUMP HOUSE

TA

NK

TANKS

TANK

WATER

JP-4

CV-22 ADDI TION

In-process

HO

US

E

PU

MP

TA

NKWA

TE

R

PU

MP

TA

NKWA

TE

R

H

H

R O AD W

AY

R O AD W

AY

R O AD W

AY

R O AD W

AY

B

A-

A-

B

90734

PCC

ANTENNA

LOCALIZER

HO

US

E

PU

MP

TA

NKWA

TE

R

PU

MP

TA

NKWA

TE

R

TO

PENSACOLA

40 MILES

GULF OF MEXICO

SANTA ROSA ISLAND

ESTHER

MARY

FORT WALTON

BEACH

HURLBURT

FIELD

EGLIN AIR FORCE BASE

REGION

MAIN GATE BASE CIVIL

ENGINEERS

PASS

& I.D.

FIRE

DEPTCONTRACTING

SECURITY

POLICE

MLK JR BLVD

CONTRACTOR'S

ENTRANCE

HAUL ROUTE

91144

91145

91132

91124

91120

91101

FREEDOM WAY

INDEPENDENCE ROAD

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

PR

OJ

EC

T

MA

NA

GE

R

US

IN

G

AG

EN

CY

BI

O

- E

NV

IR

ON

ME

NT

AL

CE

O

CO

MM

UN

IC

AT

IO

N

EN

VI

RO

NM

EN

TA

L

FI

RE

C

HE

IF

MA

IN

TE

NA

NC

E

EN

GI

NE

ER

SA

FE

TY

SE

CU

RI

TY

P

OL

IC

E

O

SS

/C C

C O

VE

R

S H

EE

T

G1

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

REGIONAL MAPVICINITY MAP

SCALE: 1" = 1000'

LOCATION MAP

SCALE: 1" = 200'

SCALE: NTS

PROJECT LOCATION

PROJECT LOCATION

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

SUBMITTAL

DATE

GENERAL

G1 COVER SHEET

G2 PROJECT INFORMATION

CIVIL

C1.0 EXISTING SITE SURVEY

C1.1 EXISTING SITE, DEMOLITION & EROSION CONTROL PLAN

C2.0 SITE LAYOUT & DIMENSION PLAN

C2.1 DETAILS

C3.0 GRADING & DRAINAGE PLAN

STRUCTURAL

S0 GENERAL NOTES & WIND INFORMATION

S1 FOUNDATION PLAN

S2 ROOF FRAMING PLAN

S3 SECTIONS & DETAILS

ARCHITECTURAL

A1 NEW WORK FLOOR PLAN

A2 MEZZANINE PLAN

A3 REFLECTED CEILING PLAN

A4 ELEVATIONS

A5 ELEVATIONS

A6 SECTIONS

A7 FINISH SCHEDULE

PLUMBING

P0 PLUMBING LEGEND, NOTES, & ABBREVIATIONS

P1 PLUMBING DEMO PLAN

P2 PLUMBING NEW WORK PLAN

P3 MEZZANINE LEVEL PLUMBING NEW WORK PLAN

P4 PLUMBING DETAILS

ELECTRICAL

E0 ELECTRICAL LEGEND & NOTES

E1 ELECTRICAL DEMO PLAN

E2 ELECTRICAL LIGHTING PLAN

E3 ELECTRICAL POWER PLAN

FTEV 09-1033

RENOVATE 823 RHS WASH RACK BLDG 91144

HURLBURT FIELD, FL

S Y M B O L S L E G E N D

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION

ENLARGED CALLOUT

KEYNOTE; SEE GENERAL NOTE 8

ROOM IDENTIFICATION; SEE ROOM

FINISH SCHEDULE

DOOR IDENTIFICATION; SEE DOOR

SCHEDULE

WINDOW OR LOUVER IDENTIFICATION;

SEE WINDOW SCHEDULE

PARTITION TYPE; SEE WALL TYPE

SCHEDULE

ELEVATION

NORTH ARROW

REVISION SYMBOL AND BUBBLE

TITLE KEY

Name

1t

4A

1i

A101

SIM

A101

SIM___

1 View Name 1/8" = 1'-0"A102 A101

Name Elevation

0'4'8' 8' 16'

A101

A101

DETAIL NUMBER

GRAPHIC SCALE BAR

SHEET DRAWN ON

SHEET OF FIRST REFERENCE

DETAIL NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ACOUS ACOUSTICAL

ADJ ADJUSTABLE

AL ALUMINUM

AB ANCHOR BOLT

APPROX APPROXIMATELY

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOD BOTTOM OF DECK

CB CATCH BASIN

CDS CONCEALED DOWNSPOUT

CG CORNER GUARD

CJ CONTROL JOINT

CMU CONCRETE MASONRY UNIT

CEM CEMENT

CLG CEILING

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

DBL DOUBLE

DTL DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DS DOWNSPOUT

DWGS DRAWINGS

EA EACH

EF EXHAUST FAN

EL ELEVATION

ELECT ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

A B B R E V I A T I O N S

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FND FOUNDATION

FFE FINISH FLOOR ELEVATION

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FT FOOT

FTG FOOTING

FP FILLER PANEL

FV FIELD VERIFY

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

GYP BD GYPSUM BOARD

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

INSUL INSULATION

INT INTERIOR

JT JOINT

LAM LAMINATE

LAV LAVATORY

LT WT LIGHT WEIGHT

MO MASONRY OPENING

MANUF MANUFACTURER

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MIN MINIMUM

OC ON CENTER

OH OPPOSITE HAND

OFCI OWNER FURNISHED,

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED,

OWNER INSTALLED

OPNG OPENING

OVH OVERHANG

PT PLATE

PLYWD PLYWOOD

R RADIUS

RO ROUGH OPENING

REINF REINFORCED

REQD REQUIRED

RET RETAINING

RM ROOM

SC SCUPPER

SCHED SCHEDULE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATION

SQ SQUARE

SQ FT SQUARE FOOT

ST STANDARD

STL STEEL

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

TO TOP OF

TOD TOP OF DECK

TOG TOP OF GRADE

TOS TOP OF SLAB

TOW TOP OF WALL

TEL TELEPHONE

TYP TYPICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

WWF WELDED WIRE FABRIC

WD WOOD

XPT EPOXY PAINT

1. DO NOT SCALE DRAWINGS; REFERENCE DIMENSIONS ON

DRAWINGS AND FIELD VERIFY ALL MEASUREMENTS.

2. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO FACE OF

STUD, COLUMN CENTERLINE, OR FACE OF EXISTING FINISH.

3. UNLESS NOTED OTHERWISE, ALL NEW WORK WHICH EXTENDS

OR INFILLS EXISTING WORK SHALL ALIGN WITH AND MATCH

EXISTING CONDITIONS.

4. ALL DISCREPANCIES OR CONFLICTING INFORMATION

BETWEEN EXISTING CONDITIONS, CONSTRUCTION DRAWINGS,

AND SPECIFICATIONS ARE TO BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT FOR RESOLUTION BEFORE

COMMITTING TO WORK OUTLINED.

5. KEYNOTE NUMBERING SEQUENCE FOUND ON ONE SHEET IS

INDEPENDANT FROM OTHER SHEETS IN THE SET.

G E N E R A L N O T E S

ARCHITECT

CALDWELL ASSOCIATES ARCHITECTS, INC

H. MILLER CALDWELL, JR., RA

116 NORTH TARRAGONA STREET

PENSACOLA, FLORIDA 32501

(850) 439-6576 phone

(850) 438-6537 fax

P R O J E C T T E A M

MECHANICAL/ELECTRICAL/PLUMBING

SCHMIDT CONSULTING GROUP

TODD NICHOLSON, PE

40 SOUTH PALAFOX

SUITE 3000

PENSACOLA, FLORIDA 32502

(850) 438-0050 phone

CIVIL

REBOL-BATTLE INC.

PAUL BATTLE, PE

214 EAST CHURCH STREET

PENSACOLA, FLORIDA 32502

(850) 438-0400 phone

STRUCTURAL

JOE DEREUIL ASSOCIATES, LLC

JOE DEREUIL, PE

301 WEST CERVANTES STREET

PENSACOLA, FLORIDA 32502

(850) 429-1951 phone

EARTH/COMPACT FILL

CAST-IN-PLACE/PRECAST

CONCRETE

MORTAR/GROUT (SECTION)

GYPSUM BOARD (ELEVATION)

FINISH GRADE WOOD

NOMINAL DRESSED BLOCKING

SHIM/FILLER BLOCKING WITH

BACKER ROD AND SEALANT

CMU (IN SECTION)

RIGID INSULATION

BATT INSULATION

PLYWOOD

GYPSUM BOARD

M A T E R I A L L E G E N D

APPLICABLE CODES

THE FOLLOWING CODES AND REVISIONS ARE APPLICABLE TO THIS

PROJECT:

INTERNATIONAL BUILDING CODE (IBC) 2012

INTERNATIONAL BUILDING CODE; EXISTING BUILDING (IBC-EB) 2012

INTERNATIONAL BUILDING CODE; PLUMBING (IBC-P) 2012

INTERNATIONAL BUILDING CODE; MECHANICAL (IBC-M) 2012

NATIONAL FIRE PROTECTION ASSOCIATION;

FIRE PROTECTION CODE (NFPA 101) 2012

S C O P E O F W O R K

BASE BID:

BASE BID SCOPE OF WORK INCLUDES PRESSURE

WASHING/BLASTING, MINOR REPAIR AND FINISH PAINTING OF

EXTERIOR AND INTERIOR WALLS; PRESSURE WASHING/BLASTING

AND FINISH PAINTING OF MEZZANINE AND ROOF DECK

COMPONENTS, ELEVATED PLATFORM AND RELATED

ACCESSORIES; DOOR PAINTING AND MINOR HARDWARE

REPLACEMENT; LOUVER REPLACMENT; TRENCH PIT AND

EQUIPMENT REMOVAL; PLUMBING EQUIPMENT REPLACEMENT

INCLUDING TRENCH DRAINS, OIL-WATER SEPARATOR, PRESSURE

WASHING SYSTEM; ELECTRICAL SYSTEM COMPONENT

REPLACEMENT INCLUDING PANELBOARDS, LIGHT FIXTURES AND

BRANCH WIRING; FIRE ALARM DEVICE REPLACEMENT.

REPLACEMENT OF DAMAGED CONCRETE PAVEMENTS AND SOD IN

ADJACENT UNPAVED AREAS IS ALSO INCLUDED IN BASE BID WORK.

FURNISH COMPLETE AS DEFINED IN THE DRAWINGS AND

SPECIFICATIONS.

BID OPTION #1:

BID OPTION SCOPE OF WORK INCLUDES A NEW STEEL ROOF

STRUCTURE CONSTRUCTED OVER THE EXISTING OPEN WASH BAY

COMPRISED OF FINISH PAINTED, REINFORCED CONCRETE PIERS;

FINISH PAINTED, STRUCTURAL STEEL FRAMING SYSTEM;

PREFINISHED, CORRUGATED ROOF DECK; PREFINISHED METAL

FASCIA PANEL CONSTRUCTION; PREFINISHED METAL GUTTERS,

DOWNSPOUTS AND FLASHINGS; NEW OVERHEAD LIGHTING.

FURNISH COMPLETE STRUCTURE AS DEFINED IN THE DRAWINGS

AND SPECIFICATIONS.

E N V I R O N M E N T A L C O N C E R N S

LEAD-BASED PAINT REMOVAL

LEAD-BASED PAINT HAS BEEN IDENTIFIED IN THE PAINT COATINGS

ON APPROXIMATELY (10) DIAGONAL ROOF ANGLE SUPPORTS,

MEZZANINE LADDER, AND YELLOW PAINT STRIPING ON THE

CONCRETE PAVEMENT IN THE COVERED WASH BAY. REFER TO

UNIVERSAL ENGINEERING SCIENCES LEAD-BASED SURVEY

REPORT NUMBER 1172395 DATED OCTOBER 30, 2014, PROVIDED

AS APPENDIX A OF THE PROJECT SPECIFICATIONS.

REMOVAL AND DISPOSAL OF ALL LEAD-BASED PAINT SHALL BE

PERFORMED IN ACCORDANCE WITH PROJECT SPECIFICATION

SECTION 01 56 00, PART 3; SECTION 3.10.C: LEAD BASED PAINT.

THIS WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL

APPLICABLE REQUIREMENTS OF THIS SPECIFICATION AND U.S.

ENVIRONMENTAL PROTECTION AGENCY, THE OCCUPATIONAL

SAFETY AND HEALTH ADMINISTRATION, THE NATIONAL INSTITUTE

FOR OCCUPATIONAL SAFETY AND HEALTH, AND OTHER FEDERAL,

STATE, COUNTY AND LOCAL AGENCIES.

OIL / WATER SEPARATOR EXCAVATION AND REMOVAL

A TOTAL OF FOUR SOIL SAMPLES WERE COLLECTED FROM THE

AREA OF THE EXISTING OIL WATER SEPARATOR. ANALYSIS OF

THESE SAMPLES FOR VOLATILE ORGANIC COMPOUNDS,

POLYNUCLEAR AROMATIC HYDROCARBONS, AND THE EIGHT

RESOURCE CONSERVATION AND RECOVERY ACT METALS DID NOT

IDENTIFY PETROLEUM CONSTITUENTS OR METALS AT

CONCENTRATIONS THAT EXCEEDED THEIR RESPECTIVE SOIL

CLEANUP TARGET LEVELS (SCTLS), AS ESTABLISHED BY THE

STATE OF FLORIDA. REFER TO UNIVERSAL ENGINEERING

SCIENCES SOIL SAMPLE ANALYTICAL REPORT NUMBER

1740.1400047.0000 DATED NOVEMBER 20, 2014, PROVIDED AS

APPENDIX B OF THE PROJECT SPECIFICATIONS.

PRIOR TO REMOVAL OF THE OIL/WATER SEPARATOR, ALL LIQUIDS

SHOULD BE REMOVED BY VACUUM TRUCK AND PROPERLY

DISPOSED. DURING THE EXCAVATION OF SOIL IN THE IMMEDIATE

AREA OF THE OIL/WATER SEPARATOR, ANY SOILS THAT EXHIBIT A

PETROLEUM ODOR OR VISUAL STAINING SHOULD BE

SEGREGATED FROM NON-IMPACTED SOILS IN AN AREA THAT WILL

NOT BE IMPACTED BY THE CONSTRUCTION ACTIVITIES, AND THAT

IS APPROVED BY THE HURLBURT FIELD ENVIRONMENTAL FLIGHT.

THESE SOILS SHALL BE PLACED ON PLASTIC SHEETING AND

COVERED WITH PLASTIC SHEETING. THE CONTRACTOR MUST

THEN CONTACT UNIVERSAL ENGINEERING SCIENCES (UES) FOR

THE COLLECTION OF WASTE CHARACTERIZATION SAMPLES FOR

ANALYSIS. THE REQUIRED ANALYSIS WILL BE DICTATED BY THE

SELECTED DISPOSAL FACILITY. ONCE THE WASTE

CHARACTERIZATION ANALYTICAL RESULTS ARE RECEIVED FROM

THE LABORATORY, UES WILL ARRANGE FOR THE TRANSPORT AND

DISPOSAL OF THE MATERIAL AT THE CONTRACTOR’S EXPENSE, IF

DETERMINED BY ANALYSIS TO BE REQUIRED.

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

G2

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

E X

I S

T I N

G

S

I T

E

S

U R

V E

Y

LEGEND

DESIGNED BY:

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P' D

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

GTP

PAB

X

I S

T I N

G

S

I T

E

D

E M

O L

I T

I O

N

E

R O

S I O

N

C

O N

T R

O L

P

L A

N

LEGEND

DESIGNED BY:

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P' D

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

GTP

PAB

SILT FENCE DETAIL

S I T

E

L

A Y

O U

T

D I M

E N

S I O

N

P

L A

N

DESIGNED BY:

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P' D

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

GTP

PAB

02 MAR 2015

LEGEND

BID OPTION 1

WITH COVERED WASH RACK

A A

B B

D

T A

I L

S

DESIGNED BY:

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P' D

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

GTP

PAB

02 MAR 2015

EXPANSION JOINT DETAIL

CONCRETE PAVEMENT SECTION

N.T.S.

A-A NEW REINFORCED CONCRETE PAVEMENT

SECTION

WITH MIFAB T2400

N.T.S.

B-B EXISTING SLAB REINFORCED CONCRETE PAVEMENT

SECTION

WITH MIFAB T2400

N.T.S.

T-2400 TRENCH DRAIN DETAIL

BUTT CONSTRUCTION JOINT DETAIL

DOWELED CONSTRUCTION JOINT

FOR CONCRETE PAVEMENT

CONCRETE SLAB DETAIL

CONTRACTION JOINT DETAIL

G R

A D

I N

G

D

R A

I N

A G

E

P

L A

N

DESIGNED BY:

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P' D

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

GTP

PAB

02 MAR 2015

LEGEND

BID OPTION 1

WITH COVERED WASH RACK

3.09 DO NOT WELD OR TACK WELD REINFORCING STEEL UNLESS APPROVED OR DIRECTED BY THE STRUCTURAL ENGINEER.

3.10 ALL REINFORCING STEEL PLACEMENTS SHALL BE REVIEWED BY A REGISTERED STRUCTURAL ENGINEER, OR BY A REPRESENTATIVE

RESPONSIBLE TO HIM. (RE: ACI 318 PAR. 1.3.1)

4.00 STRUCTURAL STEEL

4.01 STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED ACCORDING TO AISC "SPECIFICATION FOR STRUCTURAL STEEL

BUILDINGS, ASD, LATEST EDITION.

4.02 SUBMIT SHOP DRAWINGS PREPARED IN ACCORDANCE WITH AISC MANUAL "DETAILING FOR STEEL CONSTRUCTION", LATEST EDITION. STEEL FABRICATOR SHALL SUPPLY ANCHOR BOLT LOCATION DRAWINGS. DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED AND

REVIEWED.

4.03 STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992. STRUCTURAL STEEL SHAPES, PLATES, ANGLES, AND CHANNELS SHALL CONFORM TO ASTM A36 UNLESS NOTED OTHERWISE. STRUCTURAL TUBING SHALL CONFORM TO ASTM A500, GRADE B, FY = 46 KSI, UNLESS NOTED OTHERWISE. STEEL PIPE SHALL CONFORM TO ASTM A501 OR ASTM A53, TYPE E OR S, GRADE B. ANCHOR BOLTS SHALL CONFORM TO ASTM

A36 UNLESS NOTED OTHERWISE.

4.04 BOLTS SHALL CONFORM TO ASTM A325, 3/4-INCH DIAMETER MINIMUM, UNLESS NOTED OTHERWISE. BOLTS IN BEARING CONNECTIONS SHALL BE DESIGNATED TYPE N, TENSIONED, SNUG-TIGHT AS DEFINED BY AISC. BOLTS IN MOMENT CONNECTIONS AND IN TRUSSES SHALL BE DESIGNATED SLIP- CRITICAL (SC). FULLY TENSION SLIP-CRITICAL CONNECTIONS WITH DIRECT TENSION INDICATOR WASHERS INSTALLED IN ACCORDANCE WITH THE

MANUFACTURER'S INSTRUCTION.

4.05 USE PRE-QUALIFIED WELDED JOINTS AS PER AISC, AND AWS D1.1 "STRUCTURAL WELDING CODE." USE ONLY CERTIFIED WELDERS; ALL ELECTRODES SHALL CONFORM TO AWS A5 GRADE E70XX. BARE ELECTRODE AND GRANULAR FLUX SHALL CONFORM TO AWS A5, F70 AWS FLUX

CLASSIFICATION. MINIMUM WELD SIZE TO BE 3/16" FILLET WELD, U.N.O.

4.06 CUTS, BOLTS, COPING, ETC. REQUIRED FOR WORK OR OTHER TRADES SHALL BE SHOWN ON THE SHOP DRAWINGS AND MADE IN THE SHOP.

CUTS OR BURNING HOLES IN STRUCTURAL STEEL MEMBERS IN THE FIELD WILL NOT BE PERMITTED.

4.07 SHOP CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS MAY BE WELDED OR BOLTED. FIELD CONNECTIONS NOT SPECIFICALLY

DETAILED ON THE DRAWINGS SHALL BE BOLTED, WHERE POSSIBLE.

4.08 FIELD SPLICES SHALL BE DESIGNED TO DEVELOP THE FULL CAPACITY OF MEMBER AT THE POINT OF SPLICE IN BENDING, SHEAR AND AXIAL

LOAD (COMPRESSION AND TENSION).

4.09 ALTERNATE CONNECTION DETAILS MAY BE USED IF SUCH DETAILS ARE SUBMITTED TO THE ENGINEER FOR REVIEW AND ACCEPTANCE IS GRANTED. HOWEVER, THE ENGINEER SHALL BE THE SOLE JUDGE OF ACCEPTABILITY AND THE CONTRACTOR'S BID SHALL ANTICIPATE THE USE OF THE SPECIFIC DETAILS SHOWN ON THE DRAWINGS. IN ANY EVENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF SUCH ALTERNATE

DETAILS, WHICH HE PROPOSES.

4.10 PROVIDE STIFFENER PLATES ON EACH SIDE OF WEB OF BEAM OR GIRDER AT POINTS OF CONCENTRATED LOADS. MINIMUM STIFFENER PLATE THICKNESS SHALL BE 1/2" OR FLANGE THICKNESS OF COLUMNS ABOVE OR BELOW, WHICHEVER IS THICKER.

4.11 FILLER BEAMS OR JOISTS SHOULD BE SPACED EQUALLY BETWEEN THE COLUMNS IF NOT SHOWN OTHERWISE ON THE DRAWINGS.

4.12 PROVIDE TEMPORARY BRACING OF STRUCTURAL FRAMING TO PROVIDE LATERAL SUPPORT UNTIL ALL PERMANENT BRACING MOMENT

CONNECTIONS AND FLOOR AND ROOF DECKS (DIAPHRAGMS) ARE COMPLETELY INSTALLED.

4.13 STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE MECHANICAL DRAWINGS AND DRAWINGS RELATED TO OTHER TRADES.

CONTRACTOR SHALL BE RESPONSIBLE TO CHECK AND COORDINATE DIMENSIONS, CLEARANCES, ETC. WITH THE WORK OF OTHER TRADES. THE STRUCTURAL STEEL CONTRACTOR SHALL PROVIDE FRAMING AROUND OPENINGS IN FLOOR AND ROOF SLAB AS INDICATED IN THE MECHANICAL

DRAWINGS.

4.14 THE STRUCTURAL STEEL CONTRACTOR SHALL PROVIDE WEB REINFORCEMENT AT OPENINGS IN STEEL BEAMS AND GIRDERS FOR MECHANICAL AND ELECTRICAL PENETRATIONS. WEB OPENINGS SHALL BE LOCATED IN THE MIDDLE 1/3 OF BEAM DEPTH. WEB REINFORCEMENT IS NOT REQUIRED FOR WEB OPENINGS LESS THAN 4" DIAMETER OR 3" X 3". A MAXIMUM OF ONE WEB OPENING IS PERMITTED FOR EACH BEAM NOT HAVING WEB

REINFORCEMENT.

4.15 STRUCTURAL STEEL CONTRACTOR SHALL COORDINATE THE BOTTOM OF BASE PLATE ELEVATION WITH THE TOP OF CONCRETE ELEVATION. IN CASE OF CONFLICT, THE CONTRACTOR SHALL MAKE ALLOWANCE IN HIS BID FOR MORE STRINGENT REQUIREMENTS.

4.16 PAINT STRUCTURAL STEEL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. DO NOT PAINT STEEL SURFACES TO BE ENCASED IN CONCRETE OR RECEIVE SPRAYED ON FIREPROOFING, CONNECTIONS DESIGNATED AS SLIP CRITICAL, OR TO BE WELDED.

5.00 MASONRY

5.01 CONCRETE MASONRY DESIGN AND CONSTRUCTION SHALL CONFORM TO ACI 530, BUILDING CODE REQUIREMENTS FOR CONCRETE MASONRY

STRUCTURES AND ACI 530.1, SPECIFICATIONS FOR CONCRETE MASONRY CONSTRUCTION.

5.02 PROVIDE NORMALWEIGHT, HOLLOW, LOAD-BEARING CONCRETE MASONRY UNITS (CMU) CONFORMING TO ASTM C90, fc' = 1900 PSI (NET), UNLESS

NOTED OTHERWISE.

5.03 PROVIDE MASONRY CONSTRUCTION WITH MINIMUM COMPRESSIVE STRENGTH, f'm = 1500 PSI.

5.04 PROVIDE TYPE "S" OR TYPE "M" MORTAR IN ACCORDANCE WITH ASTM C270, UNLESS NOTED OTHERWISE.

5.05 VERTICAL CELLS SHALL BE REINFORCED WITH #5 @24" O.C. MINIMUM, UNLESS NOTED OTHERWISE IN THE CONTRACT DRAWINGS. VERTICAL REINFORCING SHALL BE CONTINUOUS (LAPPED 48 BAR DIAMETERS AT SPLICES) AND HELD IN POSITION AT THE TOP AND BOTTOM OF THE GROUT

POUR. UNO, POSITION VERTICAL REINFORCING IN THE CENTER OF THE CELL.

5.06 PROVIDE GROUT FOR REINFORCED MASONRY IN ACCORDANCE WITH ASTM C476. GROUT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3,000 PSI UNLESS NOTED OTHERWISE. GROUT SHALL BE FLUID CONSISTENCY. FLUID CONSISTENCY SHALL MEAN THAT CONSISTENCY AS FLUID AS POSSIBLE FOR POURING WITHOUT SEGREGATION OF THE CONSTITUENT PARTS. FILL ALL CELLS BELOW GRADE WITH GROUT. ALL GROUT SHALL BE CONSOLIDATED AT THE TIME OF POURING BY VIBRATING AND THEN RECONSOLIDATED BY AGAIN PUDDLING LATER, BEFORE PLASTICITY IS LOST. WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, CONSTRUCTION JOINTS SHALL BE FORMED BY STOPPING THE POUR OF THE GROUT

1-1/2 INCHES BELOW THE TOP OF THE UPPERMOST UNIT.

5.07 PROVIDE HORIZONTAL JOINT REINFORCEMENT COMPLYING WITH ASTM A82, NO. 9 GAUGE OR HEAVIER, ZINC COATED, PLACED 16 INCHES ON CENTER IN 8" NOMINAL CMU WALLS AND 8" ON CENTER IN 12" NOMINAL CMU WALLS, UNLESS NOTED OTHERWISE.

5.08 PROVIDE RUNNING BONDS WITH VERTICAL JOINTS LOCATED AT CENTER OF MASONRY UNITS IN THE ALTERNATE COURSE BELOW, UNLESS

NOTED OTHERWISE.

5.09 ALL MASONRY UNITS SHALL BE FREE OF EXCESSIVE DUST AND DIRT AT THE TIME THEY ARE LAYED BY THE MASON.

5.10 ALL REINFORCED HOLLOW UNIT MASONRY SHALL BE BUILT TO PRESERVE THE UNOBSTRUCTED VERTICAL CONTINUITY OF THE CELLS TO BE FILLED. WALLS AND CROSS WEBS IN ALL REINFORCED MASONRY WALLS SHALL BE FULLY BEDDED IN MORTAR. ALL HEAD (OR END) JOINTS SHALL BE SOLIDLY FILLED WITH MORTAR FOR A DISTANCE IN FROM EACH FACE OF THE UNIT NOT LESS THAN THE THICKNESS OF THE LONGITUDINAL FACE

SHELLS, BOND SHALL BE PROVIDED BY LAPPING UNITS IN SUCCESSIVE VERTICAL COURSES.

5.11 PROVIDE VERTICAL CONTROL JOINTS BETWEEN REINFORCED MASONRY WALLS AND MASONRY PARTITION WALLS AND AS INDICATED IN THE

STRUCTURAL CONTRACT DRAWINGS.

1.00 GENERAL NOTES

1.01 THESE DRAWINGS ADDRESS ONLY THE STRUCTURAL DESIGN OF THE STRUCTURE. THE DIMENSIONAL LAYOUT OF THE STRUCTURE HAS BEEN DICTATED TO JOE DEREUIL ASSOCIATES IN ORDER TO PRODUCE STRUCTURAL DESIGN DOCUMENTS. NO REPRESENTATION IS MADE REGARDING

CODE CONFORMANCE OF NON-STRUCTURAL ASPECTS OF THE STRUCTURE.

1.02 ALL CONSTRUCTION SHALL CONFORM TO THE INTERNATIONAL BUILDING CODE, 2012.

1.03 THE STRUCTURE HAS BEEN DESIGNED UTILIZING THE FOLLOWING REFERENCES:

A. UFC 1-200-01, “GENERAL BUILDING REQUIREMENTS”

B. UFC 3-301-01, “STRUCTURAL ENGINEERING”, 1 JUNE 2013

C. UFC 3-310-04, “SEISMIC DESIGN FOR BUILDINGS”

D. INTERNATIONAL BUILDING CODE, 2012 (STRUCTURAL)

E. ANSI/ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES

F. ACI 318-11, BUILDING CODE REQUIREMENTS FOR CONCRETE STRUCTURES

G. AISC STEEL CONSTRUCTION MANUAL 14TH EDITION

1.04 WIND LOADS - STRUCTURE HAS BEEN DESIGNED TO CONFORM TO THE WIND PROVISIONS OF ASCE 7-10. SEE WIND PRESSURE DIAGRAM &

CHART FOR THE FOLLOWING:

A. BASIC WIND SPEED

B. WIND IMPORTANCE FACTOR & BLDG CATEGORY

C. WIND EXPOSURE CATEGORY

D. INTERNAL PRESSURE COEFFICIENT

E. COMPONENT & CLADDING WIND PRESSURES

1.05 DESIGN GRAVITY LOADS ARE AS FOLLOWS:

A. SUPERIMPOSED DEAD LOADS:

1. MECHANICAL, ELECTRICAL: 3 PSF

2. ROOFING: 5 PSF

B. LIVE LOADS: (MAY BE REDUCED PER CODE)

1. ROOFS: 20 PSF

1.06 DRAWINGS SHOW TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. FOR DETAILS NOT SPECIFICALLY SHOWN, PROVIDE DETAILS SIMILAR

TO THOSE SHOWN.

1.07 VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS BEFORE STARTING WORK. NOTIFY STRUCTURAL ENGINEER OF ANY

DISCREPANCY.

1.08 THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC., ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. TAKE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING STRUCTURE AND ITS FOUNDATION AND TO LIMIT, TO THE EXTENT POSSIBLE, THE EFFECTS CONSTRUCTION OF THE NEW STRUCTURE HAS ON THE EXISTING STRUCTURE.

1.09 COORDINATE STRUCTURAL CONTRACT DOCUMENTS WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL. NOTIFY STRUCTURAL ENGINEER OF ANY CONFLICT AND/OR OMISSION. CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. FOR ADDITIONAL OPENINGS NOT SHOWN ON THE STRUCTURAL DRAWINGS, SEE ARCHITECTURAL, MECHANICAL, AND PLUMBING DRAWINGS.

1.10 REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS BY THE STRUCTURAL ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS BEFORE SUBMITTAL TO THE STRUCTURAL ENGINEER. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS ALSO RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION.

2.00 FOUNDATIONS AND SLAB-ON-GRADE

2.01 THE DESIGN OF FOUNDATIONS AND SLAB ON GRADE ARE BASED ON THE CRITERIA ESTABLISHED IN THE GEOTECHNICAL REPORT BY UNIVERSAL ENGINEERING SCIENCES, INC., PENSACOLA FL; UES PROJECT #1730.1400072.0000, DATED NOVEMBER 14, 2014. THE RECOMMENDATIONS

OF THAT REPORT SHALL BE CONSIDERED AN INTEGRAL PART OF THE CONTRACT DOCUMENTS.

2.02 SHALLOW FOUNDATIONS HAVE BEEN DESIGNED FOR AN ALLOWABLE NET SOIL BEARING PRESSURE OF 2,500 PSF.

2.03 CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY PROTECTING ALL EXCAVATION SLOPES.

2.04 DEWATER TO AT LEAST TWO FEET BELOW BOTTOM OF LOWEST FOUNDATION IF GROUNDWATER IS ENCOUNTERED.

3.00 REINFORCED CONCRETE

3.01 ALL CONCRETE WORK SHALL CONFORM TO ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS. DESIGN IS BASED ON ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. DETAIL CONCRETE REINFORCEMENT AND ACCESSORIES IN ACCORDANCE WITH ACI 315, DETAILING MANUAL. DETAIL ALL CONCRETE WALLS AND BEAMS ON THE SHOP DRAWINGS IN ELEVATION UNLESS SPECIFICALLY APPROVED OTHERWISE. SUBMIT SHOP DRAWINGS FOR APPROVAL, SHOWING ALL FABRICATION DIMENSIONS AND LOCATIONS FOR PLACING REINFORCING STEEL AND ACCESSORIES. DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED AND REVIEWED.

3.02 UNLESS NOTED OTHERWISE, ALL CONCRETE SHALL BE NORMAL WEIGHT AND HAVE THE FOLLOWING MINIMUM 28 DAY COMPRESSIVE

STRENGTH:

A. FOUNDATIONS 3000 PSI

B. PIERS 4000 PSI

3.03 REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 UNLESS NOTED OTHERWISE.

3.04 THE PROPOSED MATERIALS AND MIX DESIGN SHALL BE FULLY DOCUMENTED AND REVIEWED BY THE OWNER'S TESTING LABORATORY.

RESPONSIBILITY FOR OBTAINING THE REQUIRED DESIGN STRENGTH IS THE CONTRACTOR'S.

3.05 USE OF CALCIUM CHLORIDE, CHLORIDE IONS, OR OTHER SALTS IN CONCRETE IS NOT PERMITTED.

3.06 TIE ALL REINFORCING STEEL AND EMBEDMENTS SECURELY IN PLACE PRIOR TO PLACING CONCRETE. PROVIDE SUFFICIENT SUPPORTS TO MAINTAIN THE POSITION OF REINFORCEMENT WITHIN SPECIFIED TOLERANCE DURING ALL CONSTRUCTION ACTIVITIES. "STICKING” DOWELS INTO

WET CONCRETE IS NOT PERMITTED.

3.07 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE; SPLICE ONLY AS SHOWN OR APPROVED; STAGGER SPLICE WHERE POSSIBLE; USE FULL TENSION SPLICE (CLASS "B") UNLESS NOTED OTHERWISE. DOWELS SHALL MATCH THE SIZE AND SPACING OF THE SPECIFIED REINFORCEMENT AND SHALL BE LAPPED WITH FULL TENSION SPLICES (CLASS "B") UNLESS NOTED OTHERWISE. TERMINATE BARS WITH STANDARD

HOOKS.

3.08 REINFORCING STEEL SHALL HAVE THE FOLLOWING CONCRETE COVER UNLESS NOTED OTHERWISE (PER ACI 318-05 PAR.7.7.1):

A. CONCRETE AGAINST EARTH (NOT FORMED): 3"

B. FORMED CONCRETE EXPOSED TO THE EARTH OR WEATHER:

1. #6 THROUGH #18 BARS: 2"

2. #5 BARS AND SMALLER: 1-1/2"

C. CONCRETE NOT EXPOSED TO EARTH OR WEATHER:

1. SLABS AND WALLS: 1"

2. BEAMS (STIRRUPS) AND COLUMNS (TIES): 1-1/2"

6.00 COLD FORMED METAL FRAMING

6.01 COLD FORMED METAL STUDS: GALVANIZED STEEL PER ASTM A525, G60 COATING MEETING THE REQUIREMENTS OF ASTM A446 GRADE A, WITH A MINIMUM YIELD STRENGTH OF 33,000 PSI.

6.02 ALL STUDS INDICATED SHALL BE 18 GAGE MINIMUM AND HAVE 1-5/8” WIDE FLANGES WITH A ½” LIP AND SHALL BE SPACED AT 1’-4” O.C, UNLESS NOTED OTHERWISE. ALL TRACK INDICATED SHALL BE 18 GAGE MINIMUM AND HAVE 1-1/4” WIDE FLANGES.

6.03 CONNECTION REQUIREMENTS (MINIMUMS):

A. TRACK TO STEEL OPTIONS

1. 0.145” DIA. P.A.F.s @ 8” O.C. STAGGERED.

2. #12 HWH SELF TAPPING TEK SCREWS @ 8” O.C.

B. TRACK TO BLOCK – (2) 3/16” TAPCON SCREW ANCHORS AT EACH JOIST/STUD LOCATION EMBED 1¼” MINIMUM INTO BLOCK/GROUT.

C. TRACK TO CONCRETE OPTIONS:

1. 0.145” DIA. P.A.F.s @ 8” O.C. STAGGERED EMBED 1¼” MIN.

2. 3/16” TAPCON SCREW ANCHORS @ 8” O.C. EMBED 1¼” MIN.

D. STUD TO STUD OR JOIST TO JOIST: (4) #10 HWH SELF TAPPING TEK SCREWS, MIN.

E. STUD TO TRACK – (2) #10 HWH SELF TAPPING TEK SCREWS.

F. STUD TO STEEL OPTIONS

1. (2) 0.145" DIA. P.A.F.'s

2. (2) #12 HWH SELF TAPPING TEK SCREWS.

7.00 POST INSTALLED ANCHORS

7.01 ANCHOR BASIS OF DESIGN, FOR ALL POST INSTALLED ANCHORS ARE HILTI, INC PRODUCTS. CONTACT HILTI AT (800) 879-8000.

7.02 WHERE CALLED FOR IN THE CONSTRUCTION DRAWINGS, EPOXY (ADHESIVE) SHALL BE HILTI HIT-HY 200 OR EQUIVALENT SYSTEM.

PROVIDE GALVANIZED A-307 OR EQUIV. ALL-THREAD ROD AND GALV. WASHERS AND NUTS, TYPICAL.

7.03 WHERE CALLED FOR IN THE CONSTRUCTION DRAWINGS, EXPANSION (EXP.) ANCHORS SHALL BE GALVANIZED HILTI KWIK BOLT 3, INCLUDING NUT AND WASHER, WITH 4" EMBEDMENT INTO GROUT FILLED CMU OR CONCRETE. ANCHOR EDGE DISTANCE SHALL BE 4" MINIMUM AT ALL

LOCATIONS.

7.04 INSTALL ALL ANCHORS PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS, AS INCLUDED IN THE ANCHOR PACKAGING.

7.05 THE CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER'S REPRENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. THE CONTRACTING OFFICER MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR'S PERSONNEL WHO INSTALL ANCHORS ARE TRAINED PRIOR TO THE COMMENCEMENT OF INSTALLING ANCHORS.

7.06 ANCHOR CAPACITY IS DEPENDANT UPON SPACING BETWEEN ANCHORS, ANCHOR EMBEDMENT, AND PROXIMITY OF ANCHORS TO EDGES OF CONCRETE AND/OR MASONRY. INSTALL ANCHORS IN ACCORDANCE WITH THE SPACING AND EDGE CLEARANCES INDICATED IN

THESE DRAWINGS.

WIND LOAD DETERMINATION ASSUMPTIONS - INTERNATIONAL BUILDING CODE 2012

ROOF SLOPE

145 C 17.5 0.5 ON 12 II OPEN

ULTIMATE DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING (PSF)

ROOF ZONE 3 ROOF ZONE 2 ROOF ZONE 1 WALL ZONE 4 WALL ZONE 5

77.5 -119.0 -60.1 60.2 -40.1 -40.1

> 24.7, < 98.7 59.2 -60.1 -60.1 60.2 -40.1 -40.1

38.8 -39.7 -39.7 60.2 -40.1 -40.1

-39.7

-39.7

-39.7

NOTES:

1. FOR EFFECTIVE AREAS BETWEEN THOSE GIVEN ABOVE THE LOAD MAY BE INTERPOLATED,

OTHERWISE USE THE LOAD ASSOCIATED WITH THE LOWER EFFECTIVE AREA.

2. THE EDGE STRIP, a = 5.0 FT.

3. PRESSURES SHALL BE APPLIED IN ACCORDANCE WITH THE FIGURE SHOWN ON THIS SHEET.

< 24.7

> 98.7

WIND VELOCITY

(MPH)

EXPOSURE

CATEGORY

MEAN ROOF

HEIGHT (FT.)

RISK

CATEGORY

ENCLOSURE

CATEGORY

EFF.

AREA

(SQ. FT)

4. PRESSURES GIVEN ARE ULTIMATE LOADS TO BE USED WITH STRENGTH DESIGN. FOR SERVICE

LOADS TO BE USED WITH ALLOWABLE STRESS DESIGN, MULTIPLY THE PRESSURES BY 0.60.

SEE TABLES 2.3 AND 2.4 IN ASCE 7-10 FOR MORE INFORMATION ON LOAD COMBINATIONS.

59.2

59.2

38.8

38.8

38.8

38.8

60.2

60.2

60.2

WIND LOAD DIAGRAM

a a a a a a a a2

5 5

EXISTING

STRUCTURE

IA

R

E

OF

R C

SP

E C

IA

AN

N

P

ER

L O

AT

IO

M M

S

CO

D

DESIGNED BY:

A

IR

F O R C E S P E C

IA

L O P E R A T

IO

N S C

O M M A N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

A P P R O V E D

C H

IE

F E N G

IN

E E R

A P P R O V E D

C

IV

IL

E N G

IN

E E R

R E V

D A T E

D E S C R

IP

T

IO

N

A P P 'D

S P E C

IA

L O

P E R A T

IO

N S E N G

IN

E E R S Q U A D R O N

H U R L B U R T F

IE

L D F L O R

ID

A

S T A N D A R D D L A Y O U T (2 4" X 6"

G E

N E

R A

L N

O T

E S

W

IN

D

I N

F O

R M

A T

IO

N

S0

R E N O V A T E R H S W A S H R A C K

B U

IL

D

IN

G

FTEV 09-1033

JTG

JTG

A

2 3 4

B

S3EXISTING CONTINUOUS

FOUNDATION

CUT OUT EXISTING CMU WALL

AS REQUIRED TO INSTALL

NEW CONCRETE PIERS (TYP.)

'-0 /8

7"18'-7"11'-4"18'-7"7"

REINF. CONCRETE PIER (RCP14X14)

(TYP. X (4) LOCATIONS)

W8X24 COLUMN (TYP. X (4)

LOCATIONS)

EXISTING CMU

PILASTER (TYP.)

EXISTING TRENCH DRAIN

TO BE REMOVED AND

REPLACED WITH NEW

CONCRETE PAVEMENT;

SEE CIVIL

EXISTING WASH

RACK STRUCTURE

CONCRETE

PAVEMENT;

SEE CIVIL

TRENCH DRAIN;

SEE CIVIL

TRENCH DRAIN;

SEE CIVIL

3"

49'-8"

ExWF2.0ExWF2.0ExWF2.0

EXISTING 8" CMU SCREEN

WALL

EXISTING 12" CMU WALL

BID OPTION #1

EXISTING TRENCH DRAIN

TO BE REMOVED AND

REPLACED WITH NEW

CONCRETE PAVEMENT;

SEE CIVIL

BID OPTION #1

CONCRETE

PAVEMENT;

SEE CIVIL

2" CONCRETE TOPPING SLAB:

CONCRETE TOPPING SHALL BE A 3000 PSI FIBER

REINFORCED PEA-GRAVEL CONCRETE.

CONTROL JOINTS SHOULD OVERLAY EXISTING SLAB

JOINTS. ISOLATE TOPPING FROM WALLS WITH 1/2"

PREMOLDED JOINT FILLER. SEE NOTE 1 THIS SHEET

FOR EXISTING SLAB PREPARATION AND PROCEDURE.

POUR SLOPED SLAB

TRANSITION WITH

CIVIL SLAB

DN

FOUNDATION LEGEND AND NOTES

= TOP OF FOUNDATION REFERENCE ELEVATION(TOF = XX.XX')

= REINFORCED CONCRETE PIER; SEE SECTIONS IN S300

SERIES FOR REINFORCING

RCPXXX

LEGEND

= EXISTING CONTINUOUS WALL FOOTINGExWF2.0

NOTES

1. SURFACE PREPARATION FOR 2" TOPPING SLAB:

-WATERBLAST EXISTING SURFACE AT 4000 PSI

-WITHIN 30 MINUTES OF POURING TOPPING (HAVE CONCRETE TRUCK

READY): BRUSH ON A SLURRY COAT OF:

1 PART PORTLAND CEMENT

1 PART MASON’S SAND

ENOUGH WATER TO MAKE CREAMY

-POUR TOPPING SLAB

-CURE WITH CURING COMPOUND OR MOIST CURE

IA

R

E

OF

R C

SP

E C

IA

AN

N

P

ER

L O

AT

IO

M M

S

CO

D

DESIGNED BY:

A

IR

F O R C E S P E C

IA

L O P E R A T

IO

N S C

O M M A N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

A P P R O V E D

C H

IE

F E N G

IN

E E R

A P P R O V E D

C

IV

IL

E N G

IN

E E R

R E V

D A T E

D E S C R

IP

T

IO

N

A P P 'D

S P E C

IA

L O

P E R A T

IO

N S E N G

IN

E E R S Q U A D R O N

H U R L B U R T F

IE

L D F L O R

ID

A

S T A N D A R D D L A Y O U T (2 4" X 6"

F O

U N

D A

T

IO

N P

L A

N

S1

R E N O V A T E R H S W A S H R A C K

B U

IL

D

IN

G

FTEV 09-1033

JTG

JTG

02 MAR 2015

PLAN

NORTH

1/4" = 1'-0"S1

1 FOUNDATION PLAN

0 2' 4' 8'

SCALE 1/4":1'-0"

1'

ROOF FRAMING NOTES AND LEGEND

LEGEND

= BERRIDGE “DEEP-DECK” PREFINISHED, GALVANIZED 1 1/2"

STRUCTURAL 24 GA. METAL DECKING WITH CORRUGATED

PROFILE (OR EQUIVALENT), INSTALLED WITH PREFINISHED,

GASKETED FASTENERS. REFER TO ARCHITECTURAL FOR

INSTALLATION DETAILS AND FINISH REQUIREMENTS.

ROOF DECK MINIMUM SECTION PROPERTIES:

(fy > 40 ksi) ( TH= 0.024 in, I= 0.1073 in^4/ft)

INSTALLATION/ATTACHMENT REQUIREMENTS:

METAL DECK MANUFACTURER SHALL DESIGN FASTENER

TYPE, SIZE AND SPACING TO MEET WIND LOADS SPECIFIED

ON SHEET S0.

A

3 4

B

S3

'-0 /8

9"18'-7"11'-4"18'-7"9"

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

CS8x3.5x070

W X

W X

W X

W X

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

CS8x3.5x070 CS8x3.5x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ZS8x2.75x070

ROOF EDGE (TYP.) STEEL COLUMN

BELOW (TYP.)

STEEL BEAM TO

ATTACH TO EXISTING

CMU PILASTER (TYP.)

EXISTING WASH

RACK STRUCTURE

E Q

E Q

E Q

E Q

E Q

50'-0"

(TYP.)

2'-4" LAP

(TYP.)

2'-4" LAP

S2

S2

BID OPTION #1

(2) 3/4" DIA. BOLTS

8" Z-PURLIN;

SEE PLAN

STRUCTURAL

METAL ROOF DECK;

SEE PLAN

W12 BEAM; SEE PLAN

W12 BEAM; SEE

PLAN

NOTE:

USE SIMILAR

CONNECTION FOR

C-MEMBERS AT EAVES

A

A

SECTION A-A

1 1/4" 4" 1 1/4"

GL

(2) 3/4" DIA. BOLTS

W12 BEAM; SEE

PLAN

(8) 1/2" DIA. BOLTS

STRUCTURAL

METAL ROOF DECK;

SEE PLAN 1" 11" 4" 11" 1"

2'-4" LAP

2" 4"

2"

GL

(2) 3/4" DIA. BOLTS

W12 BEAM; SEE

PLAN

STRUCTURAL

METAL ROOF DECK;

SEE PLAN

8" 16 GA.

CLOSURE CHANNEL

9"

B.O. FASCIA

14'-10"

7/8" GALVANIZED METAL

FURRING @ 12" O.C.

2-1/2" 18 GA GALVANIZED METAL

FASCIA FRAMING @ 16" O.C.

ALUMINUM FASCIA PANEL;

SEE ARCH.

CONTINUOUS 2" x 2" 16 GA

GALVANIZED STEEL

ATTACHEMENT ANGLE

FASTENED @ 12" O.C.

V A R

IE

S

IA

R

E

OF

R C

SP

E C

IA

AN

N

P

ER

L O

AT

IO

M M

S

CO

D

DESIGNED BY:

A

IR

F O R C E S P E C

IA

L O P E R A T

IO

N S C

O M M A N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

A P P R O V E D

C H

IE

F E N G

IN

E E R

A P P R O V E D

C

IV

IL

E N G

IN

E E R

R E V

D A T E

D E S C R

IP

T

IO

N

A P P 'D

S P E C

IA

L O

P E R A T

IO

N S E N G

IN

E E R S Q U A D R O N

H U R L B U R T F

IE

L D F L O R

ID

A

S T A N D A R D D L A Y O U T (2 4" X 6"

R O

O F

F R

A M

IN

G

P L

A N

S2

R E N O V A T E R H S W A S H R A C K

B U

IL

D

IN

G

FTEV 09-1033

JTG

JTG

02 MAR 2015

1/4" = 1'-0"S2

1 ROOF FRAMING PLAN

PLAN

NORTH

0 2' 4' 8'

SCALE 1/4":1'-0"

1'

1" = 1'-0"S2

2 Z-PURLIN CONNECTION DETAIL (BID OPTION #1)

1" = 1'-0"S2

3 Z-PURLIN SPLICE DETAIL (BID OPTION #1)

1" = 1'-0"S2

4 RAKE EDGE DETAIL (BID OPTION #1)

SLAB ON GRADE

0"

EXISTING

FOUNDATION

-8"

A

TOP OF STEEL

16' - 0"

B

L3x3x1/4" ERECTION

SEAT, FAB. OPTION

W-SHAPE BEAM TO COLUMN

1/4

TOP PARAPET

18' - 8"

EXISTING FOOTING

1" THICK BASE PLATE W/

MIN. (4)-3/4" DIA. HEADED

ANCHOR BOLTS W/ MIN.12" EMBED.

COLUMN SITS ON 1-1/2" GROUT

BED FOR LEVELING.

14"X14" CONCRETE PIER; W/ (4) #7

VERTICALS AND #3 TIES @ 10" O.C.;

PROVIDE (3) #3 TIES @ 3" O.C. TOP &

BOTTOM OF PIER; (SEE DETAIL ABOVE)

CONCRETE PAVEMENT;

SEE CIVIL

RCP14x14 PIER DETAIL

#3 TIES SPACED

PER NOTE BELOW

VERTICALS PER

NOTE BELOW

W8 COLUMN BASE PLATE GALVANIZED ANCHOR ROD

16'-9 1/2"

TOP OF STEEL

WORK POINT

WORK POINT

1' -2

1'-2"

TYP.

1 1/2" CLR.

4" T H R D

U .N .O

1/ 2" G R O U

THEAVY HEX NUTS T&B

2"x2" PLATE WASHER T&B

8"

9"

2 1/4" 4 1/2" 2 1/4"

1/ 4"

1/ 2"

1/ 4"

STEEL COLUMN;

SEE PLAN

STEEL BEAM;

SEE PLAN

Z-PURLINS;

SEE PLAN

ROOF DECK;

SEE PLAN 12

1/2

19'-0 3/8"

C-EAVE STRUT;

SEE PLAN

#5 U-BAR (ANCHOR

REINFORCEMENT)

3' -0

8"

DRILL & EPOXY DOWELS INTO

EXISTING CONCRETE FOOTING;

PROVIDE 9" EMBEDMENT

(G.C. VERIFY)

(2) L4x4x1/4 W/ (3) 3/4" DIA.

BOLTS TO BEAM AND (4) 3/4"

DIA. x 6" EXPANSION ANCHORS

INTO EXISTING CMU WALL

M

IN

1/ 4" T

Y P

3" T

Y P

W-SHAPE BEAM TO CMU WALL

1/4" CAP PLATE

ON COLUMN

M

IN

1/ 4" T

Y P

3" T

Y P

3/8"x4" SHEAR TAB

W/ MAX. NUMBER

OF 3/4" THRU-BOLTS

1 1/4" TYP.

G.C. TO GROUT SOLID IF

EXISTING CMU IS NOT

GROUT FILLED AT

ANCHOR LOCATIONS

1 1/4" TYP.

1 1/4" TYP.

EXISTING FOOTING

EXISTING CMU PILASTER

NOTE:

GRIND FACE OF EXISTING CMU

SMOOTH PRIOR TO INSTALLING

ANGLE CONNECTIONS (TYP.)

IA

R

E

OF

R C

SP

E C

IA

AN

N

P

ER

L O

AT

IO

M M

S

CO

D

DESIGNED BY:

A

IR

F O R C E S P E C

IA

L O P E R A T

IO

N S C

O M M A N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

A P P R O V E D

C H

IE

F E N G

IN

E E R

A P P R O V E D

C

IV

IL

E N G

IN

E E R

R E V

D A T E

D E S C R

IP

T

IO

N

A P P 'D

S P E C

IA

L O

P E R A T

IO

N S E N G

IN

E E R S Q U A D R O N

H U R L B U R T F

IE

L D F L O R

ID

A

S T A N D A R D D L A Y O U T (2 4" X 6"

S E

C T

IO

N

S

D E

T A

IL

S

S3

R E N O V A T E R H S W A S H R A C K

B U

IL

D

IN

G

FTEV 09-1033

JTG

JTG

02 MAR 2015

3/4" = 1'-0"S3

1 SECTION AT COLUMN (BID OPTION #1)

A42

A5

A4 1

A5

A6

A6

UP UP

EXISTING

50'-0"

'-8

EX

IS

TI

NG

'-0

EX

IS

TI

NG

'-8

EX

IS

TI

NG

W

A L L

/ N

EW

R

OO

F

ST

RU

CT

UR

E

(B

ID

O P T

IO

N

#1

'-0

WASH HALL

WASH HALL

CORR

WAITING

EQUIP.

BID OPTION #1

2020 20

1 2 3 4

18'-8" 11'-4" 18'-8" 8"

A

B

'-0

/8

1. SEE ADDITIONAL INFORMATION ON SHEET G2 FOR DESCRIPTION

OF BID OPTOIN #1.

2. SEE CIVIL AND PLUMBING DRAWINGS FOR ADDITIONAL TRENCH

DRAIN CLARIFICATOINS.

3. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

CORR

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

N

EW

W O

R K

FL

O

O R

P

LA

N

A1

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

1/4" = 1'-0"A4 A1

1 FLOOR PLAN - BASE BID

TRUE

NORTH

PROJECT

NORTH 0'2'4' 4' 8'

K E Y N O T E S

1 PREPARE AND PAINT EXISTING GALVANIZED STEEL

DOOR WITH LOUVERS AND PREVIOUSLY PAINTED

FRAME

2 REMOVE EXISTING HOLLOW METAL DOOR AND

FRAME. REPLACE WITH NEW GALVANIZED STEEL

DOOR & FRAME IN EXISTING OPENING, WITH NEW

HARDWARE. DOOR OPENING HEIGHT AND WIDTH

TO BE VERIFIED IN FIELD AFTER NEW CONCRETE

FLOOR TOPPING IS POURED

3 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

LADDER

4 PREPARE AND PAINT PREVIOUSLY PAINTED

ELEVATED PLATFORM STRUCTURE WITH STAIRS

5 REMOVE EXISTING METAL WALL LOUVER AND

REPLACE WITH NEW 4'-0" X 4'-0" +/- PREFINISHED

METAL, STORMPROOF LOUVER. INSTALL WITH

PREFINISHED METAL SILL PAN FLASHING AND

BACKER ROD & SEALANT ALL AROUND. VERIFY

LOUVER SIZE IN FIELD.

6 REMOVE EXISTING A/C UNIT IN PREPARATION FOR

INSTALLATION OF NEW UNIT BY OTHERS (N.I.C.)

7 EXISTING CONCRETE SLAB TO REMAIN, PROVIDE

PRESSURE WASH CLEANING

8 REMOVE EXISTING VCT, RUBBER BASE, AND ALL

ADHESIVE TRACES IN PREPARATION FOR NEW

FINISHES

9 EXISTING GLASS BLOCK WINDOW TO REMAIN,

PROTECT (TYP.)

10 NEW TRENCH DRAIN SET IN CONCRETE; SEE CIVIL

AND PLUMBING

11 MAINTAIN EXISTING EDGE OF CONCRETE

PAVEMENT TO LOCATE NEW TRENCH DRAIN

12 EXISTING CONCRETE CONCRETE PAVEMENT TO

REMAIN

13 EXISTING CMU WALL TO REMAIN, PAINTED

14 EXISTING TRENCH DRAIN TO BE REMOVED, FILL IN

AND PREPARE SUBSTRATE FOR NEW CONCRETE

PAVEMENT

15 NEW CONCRETE PAVEMENT SLOPED TO DRAIN;

SEE CIVIL

16 SAWCUT EXISTING WALL AND CONSTRUCT NEW

CONCRETE PIER WITH STEEL COLUMN , PAINTED;

SEE STRUCTURAL (BID OPTION #1)

17 SAWCUT EXISTING CONCRETE SLAB FOR NEW

TRENCH DRAIN; SEE CIVIL

18 NEW 3" X 3" PREFINISHED METAL DOWNSPOUT

WITH CONCRETE SPLASHBLOCK, SURFACE

DISCHARGE (BID OPTION #1)

19 NEW EQUIPMENT; SEE PLUMBING

20 NEW EXHAUST FLUES; SEE PLUMBING

21 NEW CONCRETE PAVEMENT

22 NEW 2" THICK HIGH STRENGTH CONCRETE FLOOR

TOPPING WITH CLEAR FLOOR SEALER. TERMINATE

AT DOOR THRESHOLD EDGE

23 CONTINUOUS TRENCH DRAIN (BID OPTION #1)

24 CLEANOUT; SEE PLUMBING

25 CONSTRUCTION JOINT IN PAVEMENT, TYP.

26 WARP CONCRETE UP TO MEET NEW FLOOR HEIGHT

IN ROOM 104 - WAITING (+0'-2")

1/4" = 1'-0"A4 A1

2 FLOOR PLAN - BID OPTION #1

0'2'4' 4' 8'

A6

A6

1 12

1 33

UP UP

MEZZANINE

PLATFORM

BID OPTION #1

6 66

1 2 3 4

A

B

1. SEE ADDITIONAL INFORMATION ON SHEET G2 FOR DESCRIPTION

OF BID OPTOIN #1.

2. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

M

EZ

ZA

N

IN

E

PL

AN

A2

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

TRUE

NORTH

PROJECT

NORTH 0'2'4' 4' 8'

1/4" = 1'-0"A4 A2

1 MEZZANINE PLAN

K E Y N O T E S

1 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

TUBE RAILING SYSTEM

2 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

LADDER

3 PREPARE AND PAINT PREVIOUSLY PAINTED

ELEVATED PLATFORM STRUCTURE WITH STAIRS

4 OUTLINE OF NEW ROOF ABOVE (BID OPTION #1)

5 NEW STEEL COLUMN, PAINTED; SEE STRUCTURAL

(BID OPTION #1)

6 NEW EXHAUST FLUES; SEE PLUMBING

7 NEW 3" X 3" PREFINISHED METAL DOWNSPOUT

WITH CONCRETE SPLASHBLOCK, SURFACE

DISCHARGE (BID OPTION #1)

8 EXISTING CONCRETE SLAB TO REMAIN, PROVIDE

PRESSURE WASH CLEANING

A6

A6

BID OPTION #1

6 66

1 2 3 4

A

B

1. SEE ADDITIONAL INFORMATION ON SHEET G2 FOR DESCRIPTION

OF BID OPTOIN #1.

2. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

LIGHT FIXTURES; SEE

ELECTRICAL

L E G E N D I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

A3

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

TRUE

NORTH

PROJECT

NORTH 0'2'4' 4' 8'

1/4" = 1'-0"A4 A3

1 REFLECTED CEILING PLAN

K E Y N O T E S

1 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

BAR JOISTS, TYP.

2 PREPARE AND PAINT PREVIOUSLY PAINTED

GALVANIZED STEEL DECK

3 PREPARE AND PAINT EXISTING BAR JOIST, TYP.

4 PREPARE AND PAINT EXISTING GALVANIZED STEEL

DECK

5 NEW STEEL ROOF FRAMING, PAINTED; SEE

STRUCTURAL (BID OPTION #1)

6 NEW EXHAUST FLUES; SEE PLUMBING

01-Floor

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

11 12

15'-0"

1/2" / 1'-0"

4'-0"

16'-10" Top of Deck

A4 3___

A4

A6

BID OPTION #1

01-Floor 0"

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

15'-0"

4'-0"

1/2" / 1'-0"

A4 3 ___

A4

A6

BID OPTION #1

STEEL BEAM, BEYOND,

PAINTED; SEE

STRUCTURAL

REGLET

18'-0"

PREFINISHED,

GALVANIZED

CORRUGATED

STRUCTURAL METAL

ROOF DECK; SEE

CLARIFICATIONS IN

GENERAL NOTE #3

STEEL FRAMING,

PAINTED; SEE

STRUCTURAL

NEW REGLET WITH SEALANT

SET IN EXISTING COURSING

JOINT (CUT JOINT TO

RECIEVE REGLET)

EXISTING CONCRETE

MASONRY WALL

T.o.S 16'-9 1/2"

FACE OF PILASTER

BEYOND

PREFINISHED

GASKETED FASTENERS

@ 12" O.C.

PREFINISHED METAL

FLASHING SET IN

REGLET

FLASHING WITH REGLET

BEYOND @ PILASTER

6" MIN.

ROOFING

MANUFACTURER'S

PREFORMED

CLOSURE PIECE

BETWEEN RIBS

STEEL BEAM,

PAINTED; SEE

STRUCTURAL

B.O. FASCIA

15'-0"

STEEL FRAMING,

PAINTED; SEE

STRUCTURAL

PREFINISHED, GALVANIZED

CORRUGATED STRUCTURAL

METAL ROOF DECK; SEE

CLARIFICATIONS IN GENERAL

NOTE #3

STEEL COLUMN,

PAINTED; SEE

STRUCTURAL

5" x 5" PREFINISHED

METAL GUTTER

3" x3" PREFINISHED

METAL DOWNSPOUT

BEYOND

T.o.S 16'-0"

1"

1. REMOVE ALL EXISTING SURFACE MOUNTED WALL BRACKETRY,

SIGNAGE, AND OTHER MISCELLANEOUS COMPONENTS NOT

SHOWN ON THESE ELEVATIONS OR REQUIRED BY THE NEW

WORK. REPAIR ANY RELATED WALL DAMAGE TO MATCH

ADJACENT SURFACES.

2. SEE ADDITIONAL INFORMATION ON SHEET G2 FOR

DESCRIPTION OF BID OPTOIN #1.

3. THE PREFINISHED, GALVANIZED CORRUGATED METAL

ROOFING IDENTIFIED IN BID OPTION #1 DIFFERS FROM THE

HURLBURT BASE STANDARD STANDING SEAM METAL ROOFING

INCLUDED IN THE PROJECT SPECIFICATIONS, BUT HAS BEEN

PRE-APPROVED. THE BASIS OF DESIGN PRODUCT FOR USE IS

BERRIDGE “DEEP-DECK”, 24 GAGE PANEL WITH 1.5 INCH HIGH

PANEL PROFILE. AN APPROVED EQUAL PRODUCT MEETING

THE PERFORMANCE REQUIREMENTS OF THIS SPECIFIC

PANEL, INCLUDING WIND LOAD REQUIREMENTS INDICATED

ON THE DRAWINGS, IS ACCEPTABLE.

4. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

EL

EV

AT

IO

N S

A4

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

1/4" = 1'-0"A1 A4

1 EXTERIOR ELEVATION - EAST

1/4" = 1'-0"A1 A4

2 EXTERIOR ELEVATION - WEST

0'2'4' 4' 8'

0'2'4' 4' 8'

K E Y N O T E S

1 REMOVE EXISTING A/C UNIT IN PREPARATION FOR

INSTALLATION OF NEW UNIT BY OTHERS (N.I.C.)

2 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

TUBE RAILING SYSTEM

3 PREPARE AND PAINT PREVIOUSLY PAINTED METAL

FASCIA PANELS

4 PREPARE AND PAINT PREVIOUSLY PAINTED

ELEVATED PLATFORM STRUCTURE WITH STAIRS

5 PREPARE AND PAINT PREVIOUSLY PAINTED SPLIT

FACE CMU WALLS

6 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

LADDER

7 PREPARE AND PAINT EXISTING GALVANIZED STEEL

DOOR WITH LOUVERS AND PREVIOUSLY PAINTED

FRAME

8 REPAIR DAMAGE TO STUCCO FINISH

9 REPAIR DAMAGE TO FASCIA EDGE AND METAL

PANEL FASCIA SYSTEM

10 PREPARE AND PAINT PREVIOUSLY PAINTED AND

STUCCO FINISHED CMU PILASTER

11 EXISTING SIGNAGE TO REMAIN, PROTECT

12 EXISTING METAL PARAPET FLASHING TO REMAIN

(UNPAINTED)

13 NEW STEEL COLUMN, PAINTED; SEE STRUCTURAL

(BID OPTION #1)

14 SAWCUT EXISTING WALL AND CONSTRUCT NEW

CONCRETE PIER WITH STEEL COLUMN , PAINTED;

SEE STRUCTURAL (BID OPTION #1)

15 NEW, PREFINISHED GALVANIZED STEEL FASCIA

PANEL SYSTEM (BID OPTION #1)

16 NEW 3" X 3" PREFINISHED METAL DOWNSPOUT

WITH CONCRETE SPLASHBLOCK, SURFACE

DISCHARGE (BID OPTION #1)

17 REPAIR MINOR SETTLEMENT CRACKS IN JOINTS,

TYP.

3" = 1'-0"A4 A4

3 CANOPY / WALL DETAIL (BID OPTION #1)

3" = 1'-0"A4 A4

4 CANOPY EDGE DETAIL (BID OPTION #1)

0'2"4" 4" 8"

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

1 24

BID OPTION #1

121212

01-Floor 0"

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

1. REMOVE ALL EXISTING SURFACE MOUNTED WALL

BRACKETRY, SIGNAGE, AND OTHER MISCELLANEOUS

COMPONENTS NOT SHOWN ON THESE ELEVATIONS OR

REQUIRED BY THE NEW WORK. REPAIR ANY RELATED WALL

DAMAGE TO MATCH ADJACENT SURFACES.

2. SEE ADDITIONAL INFORMATION ON SHEET G2 FOR

DESCRIPTION OF BID OPTOIN #1.

3. THE PREFINISHED, GALVANIZED CORRUGATED METAL

ROOFING IDENTIFIED IN BID OPTION #1 DIFFERS FROM THE

HURLBURT BASE STANDARD STANDING SEAM METAL

ROOFING INCLUDED IN THE PROJECT SPECIFICATIONS, BUT

HAS BEEN PRE-APPROVED. THE BASIS OF DESIGN PRODUCT

FOR USE IS BERRIDGE “DEEP-DECK”, 24 GAGE PANEL WITH

1.5 INCH HIGH PANEL PROFILE. AN APPROVED EQUAL

PRODUCT MEETING THE PERFORMANCE REQUIREMENTS OF

THIS SPECIFIC PANEL, INCLUDING WIND LOAD

REQUIREMENTS INDICATED ON THE DRAWINGS, IS

ACCEPTABLE.

4. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

EL

EV

AT

IO

N S

A5

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

1/4" = 1'-0"A1 A5

1 EXTERIOR ELEVATION - NORTH

1/4" = 1'-0"A1 A5

2 EXTERIOR ELEVATION - SOUTH

0'2'4' 4' 8'

0'2'4' 4' 8'

K E Y N O T E S

1 REMOVE EXISTING METAL WALL LOUVER AND

REPLACE WITH NEW 4'-0" X 4'-0" +/- PREFINISHED

METAL, STORMPROOF LOUVER. INSTALL WITH

PREFINISHED METAL SILL PAN FLASHING AND

BACKER ROD & SEALANT ALL AROUND. VERIFY

LOUVER SIZE IN FIELD.

2 REMOVE EXISTING A/C UNIT IN PREPARATION FOR

INSTALLATION OF NEW UNIT BY OTHERS (N.I.C.)

3 PREPARE AND PAINT PREVIOUSLY PAINTED SPLIT

FACE CMU WALLS

4 EXISTING GLASS BLOCK WINDOW TO REMAIN,

PROTECT (TYP.)

5 EXISTING METAL PARAPET FLASHING TO REMAIN

(UNPAINTED)

6 NEW PREFINISHED CORRUGATED METAL ROOF

PANEL (BID OPTION #1); SEE CLARIFICATIONS IN

GENERAL NOTE #3

7 NEW PREFINISHED METAL GUTTER (BID OPTION #1)

8 NEW 3" X 3" PREFINISHED METAL DOWNSPOUT

WITH CONCRETE SPLASHBLOCK, SURFACE

DISCHARGE (BID OPTION #1)

9 NEW STEEL BEAM, PAINTED; SEE STRUCTURAL (BID

OPTION #1)

10 EXISTING WALL OPENING (TYP.)

11 NEW PREFINISHED METAL WALL FLASHING (BID

OPTION #1)

12 NEW EXHAUST FLUES; SEE PLUMBING

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

1 2 3 4

01-Floor 0"

Top of CMU 18'-8"

01.5-Mezzanine 9'-0"

7 7

B.O. FASCIA

15'-0"

7/8" GALVANIZED METAL

FURRING @ 12" O.C.

2-1/2" 20 GA GALVANIZED

METAL FASCIA FRAMING @ 16"

O.C.

STEEL BEAM, PAINTED; SEE

STRUCTURAL

ALUMINUM FASCIA PANEL

PREFINISHED, GALVANIZED

CORRUGATED STRUCTURAL

METAL ROOF DECK; SEE

CLARIFICATIONS IN GENERAL

NOTE #1

STEEL FRAMING, PAINTED;

SEE STRUCTURAL

HE

IG

HT

V

AR

IE

S

PREFINISHED GASKETED

FASTENERS @ 12" O.C.

3/8" DIAMETER WEEP HOLES @

12" O.C. IN WALL TRACK

CONTINUOUS 2" x 2" 16 GA

GALVANIZED STEEL

ATTACHEMENT ANGLE

FASTENED @ 12" O.C.

PREFINISHED METAL

FASCIA TRIM

EDGE OF CMU WALL BEYOND

CONTINUOUS 2" x 2" 16

GA GALVANIZED STEEL

ATTACHEMENT ANGLE

FASTENED @ 12" O.C.

PREFINISHED GASKETED

FASTENERS @ 12" O.C.

1. THE PREFINISHED, GALVANIZED CORRUGATED METAL

ROOFING IDENTIFIED IN BID OPTION #1 DIFFERS FROM THE

HURLBURT BASE STANDARD STANDING SEAM METAL ROOFING

INCLUDED IN THE PROJECT SPECIFICATIONS, BUT HAS BEEN PRE-

APPROVED. THE BASIS OF DESIGN PRODUCT FOR USE IS

BERRIDGE “DEEP-DECK”, 24 GAGE PANEL WITH 1.5 INCH HIGH

PANEL PROFILE. AN APPROVED EQUAL PRODUCT MEETING THE

PERFORMANCE REQUIREMENTS OF THIS SPECIFIC PANEL,

INCLUDING WIND LOAD REQUIREMENTS INDICATED ON THE

DRAWINGS, IS ACCEPTABLE.

2. SEE ENVIRONMENTAL NOTES ON G2 FOR LEAD BASED PAINT

CONCERNS.

G E N E R A L N O T E S

I A

R

E

OF

RC

SP

EC

IA

AN

N P

ER

L O

AT

IO

M M

SC

O

D

DESIGNED BY:

A

IR

F O

R C

E

SP

EC

IA

L O

PE

R

A

TI

O N

S C

O M

M A

N D

DATE:

DRAWN BY:

BUILDING NO:

PROJECT NO:

SHEET REF:

SHEET NO:

AP

PR

OV

ED

CH

IE

F

EN

GI

NE

ER

AP

PR

OV

ED

CI

VI

L E

NG

IN

EE

R

RE

V

DA

TE

DE

SC

RI

PT

IO

N

AP

P'D

S

P E

C

IA

L O

P E

R A

T

IO

N S

E N

G

IN

E E

R S

Q U

A D

R O

N H

U R

LB

U

R T

FI

EL

D , F

LO

R

ID

A

ST

AN

DA

RD

D

LA

YO

UT

(2 4"

X

SE

C

TI

O

N S

A6

RE

N

O

VA

TE

R

HS

W

A

SH

R A

C K

BU

IL

DI

N

G

FTEV 09-1033

AMT

MF

02 MAR 2015

1/4" = 1'-0"A1 A6

1 SECTION

1/4" = 1'-0"A1 A6

2 SECTION

0'2'4' 4' 8'

0'2'4' 4' 8'

K E Y N O T E S

1 PREPARE AND PAINT PREVIOUSLY PAINTED METAL

FASCIA PANELS

2 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

TUBE RAILING SYSTEM

3 REMOVE EXISTING A/C UNIT IN PREPARATION FOR

INSTALLATION OF NEW UNIT BY OTHERS (N.I.C.)

4 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

BAR JOISTS, TYP.

5 PREPARE AND PAINT PREVIOUSLY PAINTED STEEL

LADDER

6 PREPARE AND PAINT PREVIOUSLY PAINTED

GALVANIZED STEEL DECK

7 PREPARE AND PAINT PREVIOUSLY PAINTED SPLIT

FACE CMU WALLS

8 PREPARE AND PAINT PREVIOUSLY PAINTED

ELEVATED PLATFORM STRUCTURE WITH STAIRS

9 NEW TRENCH DRAIN SET IN CONCRETE; SEE CIVIL

AND PLUMBING

10 REPAIR MINOR SETTLEMENT CRACKS IN JOINTS,

TYP.

3" = 1'-0"A4 A6

3 CANOPY FASCIA DETAIL (BID OPTION #1)

FLOORS

SC SEALED CONCRETE

CONC CONCRETE

EX-CONC EXISTING CONCRETE

SG STEEL GRATE

WALLS

EX-CMU EXISTING PREVIOUSLY PAINTED CMU (SPLIT

FACE FINISH ON EXTERIOR WALLS)

EX-MFP EXISTING PREVIOUSLY PAINTED GALVANIZED

METAL FASCIA PANELS WITH EXPOSED

FRAMING

CEILING

EX-GMD EXISTING GALVANIZED METAL DECK

GMD PREFINISHED, GALVANIZED CORRUGATED

STRUCTURAL METAL ROOF DECK

A B B R E V I A T I O N S

F I N I S H I N D E X

FLOORS

CONCRETE

SC CONCRETE FLOOR SEALER

SOLVENT-BASED, CLEAR

WALLS

CMU, SMOOTH AND SPLIT-FACE

P-1 ACRYLIC LATEX, FLAT FINISH

COLOR: BASE STANDARD “LIGHT TAN”

FASCIA PANELS AND RELATED FRAMING

P-2 ACRYLIC LATEX, SEMI-GLOSS

COLOR: BASE STANDARD “LIGHT TAN”

CEILING

GALVANIZED METAL DECK

P-2 ACRYLIC LATEX, SEMI-GLOSS

COLOR: BASE STANDARD “LIGHT TAN”

STEEL FRAMING, INCLUDING BAR JOISTS

P-3 HIGH PERFORMANCE PAINT SYSTEM

CONSISTING OF ZINC RICH PRIMER,

EPOXY INTERMEDIATE COAT AND

FLOROPOLYMER POLYURETHANE

TOPCOAT, SEMI-GLOSS FINISH

COLOR: BASE STANDARD “LIGHT TAN”

DOORS

GALVANIZED METAL DOOR

P-4 ACRYLIC LATEX, SEMI-GLOSS

COLOR: BASE STANDARD “DARK BRONZE”

HOLLOW METAL DOOR FRAME

P-5 HIGH PERFORMANCE PAINT SYSTEM

CONSISTING OF ZINC RICH PRIMER,

EPOXY INTERMEDIATE COAT AND

FLOROPOLYMER POLYURETHANE

TOPCOAT, SEMI-GLOSS FINISH

COLOR: BASE STANDARD “DARK BRONZE”

STEEL ACCESSORIES, INCL. PLATFORM, STAIRS, LADDER, RAILINGS

P-3 HIGH PERFORMANCE PAINT SYSTEM

CONSISTING OF ZINC RICH PRIMER,

EPOXY INTERMEDIATE COAT AND

FLOROPOLYMER POLYURETHANE

TOPCOAT, SEMI-GLOSS FINISH

COLOR: BASE STANDARD “LIGHT TAN”

PREFINISHED METAL COMPONENTS (BID OPTION #1)

1. PREFINISHED, GALVANIZED CORRUGATED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .