Questions & Answers.docx
DOCX document 12 KB Posted
- Attached to
- Repair Storm Water Infrastructure
- Solicitation number
- FA4417-09-R-0006
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4417-09-R-0006, Amendment #2.PDF | ||
| FA4417-09-R-0006, Site Visit Attendees.PDF | ||
| FA4417-09-R-0006, Site Visit .PDF | ||
| Solicitation Amendment NO.1.docx | DOCX document | |
| 07-1015 Specifications.pdf | ||
| 07-1014 Specifications.pdf | ||
| Solicitation, FA4417-09-R-0006.doc | DOC document | |
| FA4417-09-R-0006, Wage Determination.PDF | ||
| 07-1015 Dwgs.pdf | ||
| 07-1014 Dwgs.pdf | ||
| Attachment 5 FinancialReferenceSheet.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & ANSWERS, FA4417-09-R-0006
DATE: 20 FEB 09
1. Phase I:
Question: The drawings are not showing any type of stripping. Do they want any or not at all?
Answer: Road markings currently do not exist and are not required in this phase.
2. Phase II:
Question: The drawings are indicating the sub-base for the road will be Limerock. The specs do not talk about any specific material; they just say the minimum compaction needed for this part. Could we use GAB instead?
Answer: Use GAB meeting specification Section 02231.
3.
Question: What type of light poles are the ones that need to be replaced? Who is going to do the relocation for the poles that need to be relocated?
Answer: Contractor to remove, store, and replace light pole.
4.
Question: What is the thickness for the Armorflex Slope Protection? 4 inches is the most common.
Answer: The Armorflex slope protection is distributed by Contech Construction Products, Inc. The product should be Block Class 30s with 4.75” thickness (or approved equal product).
5.
Question: Are we going to be able to close the two phases at the same time? Are we going to have to finish the Phase I to start Phase II.
Answer: Project 07-1014 and 07-1015 may be started at the same time. Contractor is to follow phasing on Project 07-1014 as indicated on drawings (the two locations in the housing area cannot be worked the same time). Also, once work begins on Project 07-1015, the contractor must complete work and Independence Road cannot be closed for more than 30 calendar days (see Amendment #2 to solicitation FA4417-09-R-0006).