Att 1_Scott AFB Air Show PWS_11-20-26.pdf
PDF 188 KB Posted
- Attached to
- FY27 Scott AFB Air Show Audio Service
- Solicitation number
- FA440727QTW04
About this file
This is a Performance Work Statement (PWS) for audio services at Scott Air Force Base's 2027 Open House and Air Show, dated November 20, 2026.
The contractor must provide comprehensive audio services for the June 11-13, 2027 event, which is expected to attract 125,000-150,000 attendees. Required deliverables include a complete, self-contained sound system with PA capability covering up to 5,000 feet of show line and reaching approximately 50,000 people daily across the main ramp (approximately 270,000 square yards). Specific equipment requirements include one full-service communication trailer with narrator/air boss platform on roof; four separate remote speaker systems utilizing 5.8GHz wireless transmission; AM/FM stereo tuner; CD player; up to 12-channel mixing board; wired and wireless microphones; two VHF radios; a 300-foot audio snake cable; FM transmission capability; zone-controlled sound design for VIP tent coverage; two audio outputs for press recording; and all necessary generators. The contractor must set up all systems by 12:00 PM CST on June 11, 2027. Qualifications include active membership in good standing with the International Council of Air Shows (ICAS) for a minimum of three consecutive years prior to proposal submission and a minimum of five years of documented experience providing comprehensive audio and sound production services for comparable airshow events, supported by verifiable references.
Additional requirements include maintaining $1,000,000 general liability insurance, obtaining base identification and vehicle passes for all personnel, completing AT Level I training within 30 days, and complying with security protocols per AFI 31-101 and AFI 31-501. The government will provide billeting (maximum four rooms from June 9-14, 2027), one courtesy vehicle, and one golf cart; the contractor pays for all sundry items. Payment will be made in one lump sum within 30 days of invoice receipt and material inspection. If the contractor is on-site and ready to perform but cannot due to circumstances outside its control, it receives 100% of the performance fee; failure to perform for any other reason results in no compensation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOTT AIR FORCE BASE AIRSHOW AUDIO SERVICES
PERFORMANCE WORK STATEMENT
20 NOVEMBER 2026
1.0 Background
Scott Air Force Base (SAFB) will host an Open House and Air Show June 12-13, 2027, with an estimated attendance of 125-150k. Sound services, as defined by Air Force Manual 10-1004, Conducting Air Force Open Houses, are needed to support key functions.
2.0 Scope
The contractor shall provide all the necessary personnel, supervision and any other items and services necessary to provide audio services for the Scott AFB (SAFB) Air Show, 11-13 June to support the air boss, narrator, announcer, and other tasks defined by the air show planning team.
3.0 Performance Requirement
3.1. Air Show Sound Services
Contractor will provide a complete sound system with PA system capable of covering up to 5,000 feet of show line and provide sound projection to an air show crowd of approximately 50,000 people each day. Although the main ramp is situated well within 5,000 feet of the show line, the contractor needs to provide/position equipment to ensure that the audio system is audible from the entire main ramp, approximately 270,000 square yards. Contractor will provide one full service communication trailer with narrator/air boss platform on roof, provide four separate remote speaker system capability utilizing 5.8GHz or other wireless transmission that will not impact air or base operations, AM/FM stereo tuner, CD player, mixing board, wired and wireless microphone, two VHF radios, 300 foot “audio snake” cable and FM transmission capability for expanded coverage and local safety broadcasts. Contractor is responsible for weather protection items that are needed in case of inclement weather. Provide zone-controlled sound design to allow for balanced coverage in VIP tents. Contractor will provide two audio outputs for the press to connect and record directly from the sound system.
Government will provide the required billeting rooms for contractor support personnel, one courtesy car and one golf cart. A porta-john and trash receptacle shall be placed next to the communication trailer for use by the communication crew, narrator, and air boss. Contractor shall carry at least 1-million-dollar general liability policy covering the use of the equipment on the show site. Contractor shall make proof of insurance available to the government.
3.1.1 The contractor shall provide for the following Sound Services:
3.3.1.1 Provide self-contained sound system and control point trailer with necessary air ground communications systems for the airboss to control the aviation event to include at a minimum 4x UHF and 4x VHF frequencies.
3.3.1.2 Provide up to 12 channel sound mixing system
3.3.1.3 Provide sound coverage for up to but not limited to 268,663 Sq. yards feet of frontage speakers
3.3.1.4 Provide sound productions and background music prior to and after flying events
3.3.1.5 Provide area for Air Boss, Narrator, and Announcer Workstations on the roof of the communication trailer.
3.3.1.6 Provide all generators required for running all sound systems
3.3.1.7 Provide direct interface with other systems for wide area coverage
3.3.1.8 The Contractor shall be an active member in good standing of the International Council of Air Shows (ICAS) for a minimum of three (3) consecutive years prior to proposal submission.
The Contractor shall provide verifiable documentation of ICAS membership covering the preceding three-year period (e.g., official membership certificates or written verification from ICAS).
3.3.1.9 The Contractor shall have a minimum of five (5) years of documented experience providing comprehensive audio and sound production services specifically for airshow events of comparable size.
To demonstrate compliance with this requirement, the Contractor shall submit references for airshow events executed that demonstrate experience similar in size, scope, and complexity to the Scott AFB requirement. For each reference, the Contractor shall provide:
• Event Information: Name of the airshow, event dates, and performance location.
• Scope of Work: Detailed description of the specific sound services, equipment, and technical support provided.
• Audience Scale: Estimated average daily attendance and total event population supported.
• Point of Contact (POC): Reference contact information for the event organizer or contracting authority (Full Name, Title/Role, Phone Number, and Verified Email Address).
• Relevancy Narrative: An explanation demonstrating how the magnitude, layout, and operational complexity of the referenced event compare directly to the Scott AFB airshow requirements.
3.3.1.10 The contractor shall setup all sound systems on site no later than 12:00 PM CST on 11 June 2027.
4.0 General Requirement
4.1 Insurance.
Contractor's Liability Insurance: The Contractor declares that they will maintain personal liability insurance within the limits of one million dollars ($1,000,000.00) per occurrence for bodily injury or property. A copy of proof of insurance shall be provided to the Contracting Officer when the quote is provided.
5.0 Government Furnished Property and Services
Transportation/Lodging: The Contractor will not include a fee for Lodging or Rental Car. If required, the Government will provide a rental vehicle/standard hotel rooms (maximum of four rooms) from 9 June through 14 June 2027. The Contractor shall include in their official quote lodging request (quantity). The Contractor and all individuals/Sub-Contractors assisting the Contractor in the execution of work stated in this PWS and subsequent the contract shall be responsible for paying for all sundry items consumed. Upon check-in, a credit card for each room provided will be required to cover any sundry item costs or damage to the hotel.
6.0 Base Access
In order to gain access, the contractor shall do the following:
5.1.1 The contractor shall obtain base identification, and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installations(s) cited in the contract. This will be provided once all required documentation has been provided to government representative. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished identification badges while visiting or performing work on the installation. To obtain unescorted access to the installation, all contractors MUST have a valid, unexpired REALID and credentials must be IAW the REAL ID Act of 2005.
5.1.2 The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees (as written on Driver’s License) and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing.
When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license with REAL ID logo, current vehicle registration, and valid vehicle insurance certificate and complete SF74 to obtain a vehicle pass.
5.1.3 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
5.1.4 When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and AFI 31-501, Personnel
Security Program Management, citing the appropriate paragraphs as applicable.
5.1.5 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
7.0 Failure to comply with these requirements may result in withholding of final payment.
8.0 Compensation and Cancellation
Should the 2027 SAFB Air Show be postponed, abandoned, canceled, or otherwise prevented from occurring due to conditions outside the control of either party, including, but not limited to, national or military emergency, disaster, terrorism, or an act of God/force majeure, pandemic and or epidemic neither parties hereto shall be liable to the other for any expense incurred at the time of cancellation. If the Contractor has incurred costs at the time of cancellation, the Contractor shall be entitled to a compensation amount that is commensurate with the amount of work performed. The Contractor shall therefore provide substantiating documents to support costs incurred when invoicing.
9.0 Deposits
The Government will not pay any deposits. All costs will be inclusive and will be paid in one lump sum at the end of the performance. Payment will be made within 30 days of receipt of invoice, material inspection, and receiving report.
10.0 Donations
Air Force shows are free to the public and charge no admission. The Contractor shall not solicit donations as additional compensation from the public. The Contractor may not display or present any signage or charge for an admission fee in any way, shape, or form to tour an aircraft or display. See AFM 10-1004 for further guidance.
9.0 Operational Security and Anit Terrorism Requirements
9.1. AT Level I Training. Coordinate with the installation ATO/ATPM to ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. (T-3) Coordination for training should be done by the requiring unit after contract award. AT level 1 training link: https://jko.jten.mil/courses/ATlevel1/launch.html
9.1.2. Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the Dixon Visitor Center or security office. Contractor workforce must comply with all personal identification verification requirements as directed by DAFMAN 31-101v3 and the 375 AMW AT/IDP. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters.
9.1.3. For contractors that do not require CACs but require access to a DOD facility or installation. The vetting requirement for Civilian employee and Contractor eligible non-CAC DoD credential holders include a minimum Tier 1 or equivalent investigation. Fitness standards for these populations are listed in AFMAN 16-1405.
9.1.4. EAGLE EYES Training. Eagle Eyes. The Eagle Eyes program is a DAF AT initiative that enlists the eyes and ears of all DAF military, civilians, contractors, and dependents. The Eagle Eyes program is a reporting mechanism for the base community on how to report suspicious behavior or possible terrorist activity. Each installation shall outline procedures in the installation AT plan on how to receive and log suspicious activity reports and suspicious incident reports and to pass those reports expeditiously to their servicing Office of Special Investigations (OSI) detachment for appropriate action. (T-3) OSI provides threat data to the installation commander, the vice commander, and the DFC as appropriate to ensure an optimal common operating picture and an AT/Base Defense (BD) posture for the given installation’s area of responsibility (AOR) in accordance with Air Force Mission Directive (AFMD) 39, Air Force Office of Special Investigations (AFOSI) and Air Force Policy Directive (AFPD) 71-1, Criminal Investigations and Counterintelligence. This program implements the spirit and intent of DoDI 2000.26, DoD Use of the Federal Bureau of Investigation (FBI) eGuardian System. Negligence, equipment failure, sickness, and loss of employees/subcontractors do not create conditions outside the party's control and do not excuse performance. If the Contractor is on-site and ready to perform on the day of the event but cannot be due to circumstances outside of the Contractor's control, the Contractor will be paid 100% of the performance fee. If the Contractor fails to perform for any reason other than those stated above, the Contractor shall not be entitled to compensation of any type; to include 100% of the performance fee or a percentage thereof that is commensurate with the amount of non-performance.
| 2.0 Scope |
| 3.0 Performance Requirement |
| 4.0 General Requirement |
| 5.0 Government Furnished Property and Services |
| 6.0 Base Access |
| 7.0 Failure to comply with these requirements may result in withholding of final payment. |
| 9.0 Deposits |
| 10.0 Donations |
File details come from the government source that posted it. Updated .