Attach 9) Q and A - B140 Foundation Repair Resolicitation.pdf

PDF 78 KB Posted

Attached to
FY 23 B140 Foundation Repair Resolicitation
Solicitation number
FA303023R0001
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q & A – B140 Foundation Repair Resolicitation

Q 1) Will the gym equipment be removed prior to the start of work?

17 CES Comments: All movable equipment and rubber workout mats will be removed from the locations work will be preformed Rms. 113 and 114.

NOTE: any equipment that is bolted in place will remain in place and the contractor will be required to work around these specific pieces of equipment/racks.

SEE ASoW Section 3.2 – sub-point (5) and Section 3.4 -sub-point (5)

Q 2) Can the fire exit door(s) be open while work is being performed

Yes, 17 CES, Fire Prevention and Facility Managers will need to coordinate, but the exit doors on the East side of both Rm. 113 and Rm. 114 will be available for access and ventilation purposes.

Q 3) It says that flooring instillation is required, will the flooring be provided or is the contractor required to purchase it

17 CES Comments:

See ASoW Section 3.2 Demolition – sub-points (6, 7, 8, and 9)

See ASoW Section 3.4 INSTALLATION – Flooring – sub-points (7 and 8)

Q 4) Are there any pictures and specifications available for the flooring materials

17 CES Comments: All DRWs/TEs/Pictures are available within the solicitation package.

See ASoW Section 3.4 INSTALLATION, Sub-point (7): provide new resilient rubber sheet flooring in rms.

113 and 114. Color to closely match existing. Material submittal required.

NOTE: Leadership in Energy and Environmental Design (LEED) certified products should be considered when researching new flooring materials/products for submission approval.

File details come from the government source that posted it. Updated .