Attachment_3_-_Form_66.pdf
PDF 78 KB Posted
- Attached to
- Upgrade Rooftop Ventilation Federal contract opportunity
- Solicitation number
- FA303019BA005
About this file
Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA303019BA0050001_SF_30.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_6_-_Base_Access_Letter-_TEMPLATE.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_5_-_Contract_Insurance_Compliance_Notification.pdf | ||
| Solicitation_-_FA303019BA005.pdf | ||
| Attachment_1_-_SOW_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
1030204
PROJECT TITLE
Upgrade Rooftop Energy
Recovery Units, B250, 252, 255, 257
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DA
TE
R
EC
EI
VE
D
IN
CO
NT
RA
CT
G
T
O
CI
VI
L E
NG
IN
EE
RI
NG
RE
TU
RN
S
US
PE
NS
E
FO
LL
OW
U
P
C
ON
TR
AC
TO
R
NO
TI
FI
ED
CO
NT
RA
CT
OR
R E-
SU
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
RE
MA
RK
S LIN
E N U
M B
ER
ITEM OR
DESCRIPTION OF
ITEM, CONTRACT
REFERENCE, TYPE
OF SUBMITTAL (Ref spec
& para)
CE
RT
IF
IC
AT
E O
F C
OM
PL
IA
NC
E
SH
OP
D
RA
W
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
CO
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
APPROVED DIS-APPROVED
Part 1, 1.4, Work Plan (c)
Part 3, 3 All ductwork 7 Days after
NTP
Part 5; 5.10, Air Emissions; form PI-7 (a)
Part 10, 10.2, Project Closeout Checklist (b)
Part 1, 1.15 Construction Safety Plan
(a)
Part 1, 1.10, Warranties (b)
Part 4, 4.2, Utility Outages 4 (d)
Part 1, 1.18.1, AF Form 592 Welding, Cutting and Brazing
(c)
Part 3, 3.3, Test results (applies to all of Part 3)
(b)
Part 1, 1.9, Draft DD 1354 (b)
(a) As soon as possible but in no case later than 45 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
Part 1, 1.17, Waste Management Form (d)
Part 1, 1.13 As-builts drawings (c)
Part 2, 2.2, Uniform Haz. Waste Manifest (d)
Part 1, 1.17 Materials Determination Form (d)
Part 3, 3.3, Roof Curbs & associated materials
(c)
Part 3; 3.3, Energy Recovery Units/Replacement Parts
(c)
Part 3; 3.3, Electric Pre-Heat Coil (c)
Part 3; 3.3, All Electrical Components
(c)
Part 3,3.3, Duct Smoke Detector (c)
Part 3, 3.3, Package Controls (c)
Part 3, 3.3, All ductwork (c)
File details come from the government source that posted it.