B440 RFI Answers 01.docx

DOCX document 15 KB Posted

Attached to
B440 Repair Blaze Hangar, T7 Electrical Upgrades Federal contract opportunity
Solicitation number
FA302224R0010
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document appears to be a set of questions and answers related to a federal contract opportunity. The key details are:

The contract opportunity is for the retrofit of Building 440, the Blaze Hangar, in preparation for the T-7 aircraft. The work includes retrofitting the 480V electrical distribution system, the 400Hz electrical distribution system, and restriping the floor. A site visit is highly encouraged on August 15, 2024, and RFIs must be submitted by August 20, 2024. The range of magnitude for this procurement is between $1,000,000 and $5,000,000. Contractors must complete CUI training and sign an acknowledgement to gain access to the documents. The contracting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to B440 Repair Blaze Hangar, T7 Electrical Upgrades, newest first.
File Type Posted
440 Meter Readings.xlsx XLSX spreadsheet
B440 Xfmer Nameplate.png PNG image
Solicitation Amendment FA302224R00100002 SF 30.pdf PDF
Solicitation Amendment 01 FA302224R00100001 SF 30.pdf PDF
Solicitation - FA302224R0010.pdf PDF
FM66 B440 Hangar.xlsx XLSX spreadsheet
Appendix A - Cost Breakdown.xlsx XLSX spreadsheet
SOW Repair Blaze Hangar T7 Electrical Upgrades B440.pdf PDF
MFR Contractor CUI Training Acknowledgment for Solicitations.pdf PDF
CAFB Special Construction.pdf PDF
CAFB Electrical Standards.pdf PDF
CAFB Mechanical Standards.pdf PDF
Contractor CUI Training Slides.pptx PPTX presentation
Wage Determination DBA MS20240045.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1: Will construction be phased, or will the entirety of the hanger be vacated during construction?

A1: The Project will have to be phased.

Q2: Is there a current load analysis on the existing utility transformer? Please see attachments A2: We do not have a load analysis, but please see attached transformer nameplate and meter data.

Q3: If the building is to be occupied during construction and the transformer and building service needs to be replace what is an acceptable down time?

A3: Outages will need to be coordinated, longer outages could be worked over the weekend/holidays and family days.

Q4: In lieu of the MG sets can a solid-state PUC be used for power generation?

A4: Solid state PUC maybe an approved acceptable alternative, it will still need to go through the submittal process the same as the MG set.

Q5: If MG sets are desired, does automatic breaker control need to be implemented to ensure 400Hz prior to breaker closure?

A5:Yes.

Q6: For the 400Hz receptacle does the form factor need to accept the standard 6 pole 115/200VAC 400Hz Aircraft Cable or is there another preferred?

A6: Support standard aircraft power, common 6 pin same as the T-38.

Q7: It is not explicitly listed but would the 270VDC option need to be considered for the Joint Strike Fighter?

A7:No.

Q8: On the 28VDC supply, is this for start service and would need be a 300Amp supply? MS3506 style receptacle or is another preferred?

A8: After following up with AETC the 28VDC supply is not required, this was a copy paste error from Boeing.

Q9: Will there be any NVIS requirements imposed on the hangar light fixtures?

A9: No.

Q10: Can a bid extension of 4 days be allowed?

A10: Bid has been extended to September 5, 2024.