ATT 1 - Statement of Work UPDATED.pdf

PDF 297 KB Posted

Attached to
Thunder Over Columbus Air Show Portable Restroom Rental
Solicitation number
FA302224Q0342
Issued by

About this file

This document is a Statement of Work (SOW) for the rental of portable latrines for the 2024 "Thunder over Columbus" Air Show event at Columbus Air Force Base (AFB).

The SOW defines the scope of work, which includes the contractor providing all labor, materials, equipment, management, supervision, coordination, and transportation to accomplish this work. The contractor shall provide 130 standard latrine units, 12 handicap accessible latrine units, 16 hand-washing stations, 1 VIP trailer, and 16 hand-sanitizing stations. The units must be in place by 6:00 PM on Friday, September 20, 2024, and the contractor shall service the units according to the specified schedule. The work schedule is from September 18, 2024 through September 22, 2024, with the airfield available for placement of units beginning at 10:00 AM on September 20, 2024. The related federal contract opportunity is for Solicitation Number FA302224Q0342, "Thunder Over Columbus Air Show Portable Restroom Rental", issued by the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

RENTAL OF PORTABLE LATRINES

COLUMBUS AFB, MISSISSIPPI

May 8, 2024

1.1 This Statement of Work (S.O.W.) defines the scope of work to accomplish the rental of portable latrine units for the 2024 “Thunder over Columbus” Air Show event at Columbus AFB. The contractor shall provide all labor, materials, equipment, management, supervision, coordination and transportation required to accomplish this work.

1.2 WORK SCHEDULE, PLANS AND WORKING HOURS: Workdays for this contract will be Wednesday, 18 September 2024 thru Monday, 23 September 2024. The airfield will be available for the placement of units beginning at 1000 hours (10:00 AM) on Friday, 20 September 2024 except as defined in paragraph 2.5 below. The contractor shall have all units removed prior to 2359 (1159 PM) on Sunday, 22 September 2024. The contractor shall not begin any work until he/she is 100% material complete including all cleaning and sanitary supplies. Written permission from the Contracting Officer (CO) or Contracting Officer’s Representative (COR) must be obtained for any deviation from the approved schedule.

1.3 AVAILABILITY OF UTILITY SERVICES: All reasonable quantities of utilities will be made available to the contractor. The government shall not be held responsible for interruptions of utility services, and will not be liable for contractor delays, damages, or increased cost incurred by any such interruption of service. The contractor shall be responsible for providing all labor, equipment, and materials to make necessary temporary utility connections. The temporary connections shall be coordinated with the Government Representative before being made and shall be removed upon project completion.

1.4 CLEAN-UP: All debris and rubbish not specified to become government property resulting from service will be disposed of by the contractor off government property. Disposal will be in compliance with federal, state, and local hauling and disposal regulations. Site clean-up shall be daily.

1.5 SAFETY REQUIREMENTS: Safety requirement shall be the applicable sections of EM 385-1-1, Oct 1992 and Occupational Safety and Health Administration (OSHA) Regulations. OSHA regulations are available for review at the Base Safety Office, Building 724. EM 385-1-1 is available for reference in the Maintenance Engineering Office, Building 385.

1.6 SITE CONDITIONS: The contractor acknowledges satisfaction as to the nature and location of the work, the general and local conditions, access to job site; disposal, handling and storage of materials;

availability of water, electric power or similar physical conditions at CAFB; the character of equipment and facilities needed preliminary to and during the performance of the work; and all other matters that can in any way affect the work or the cost thereof under this contract. The contractor acknowledges that any damage to the existing landscaping or facilities in the area will be returned to its original condition prior to the completion of subject work at no additional cost to the government.

END OF SECTION

TECHNICAL – PART II

2.1 The units shall meet the following descriptions or be an equivalent approved by the CO or COR:

2.2.1 The contractor shall provide one hundred thirty (130) standard latrine units. The units shall be modern polyethylene non-flushing units with holding tank, separate urinal, and bathroom tissue dispenser.

2.2.2 The contractor shall provide twelve (12) handicap accessible latrine units. The units shall be ground level floor accessible, non-flushing units with holding tank and bathroom tissue dispenser.

2.2.3 The contractor shall provide sixteen (16) hand-washing stations. The units shall be complete with soap, paper towel dispensers, and foot-pedal operation for the sink. Each station shall be able to serve two persons simultaneously.

2.2.4 The contractor shall provide one (1) VIP trailer. The unit shall have a flushing toilet, foot-pedal operated sink, mirror, interior light, bathroom tissue dispenser, paper towel dispenser, and soap dispenser. The unit shall support an estimated 550 VIP guests over the course of the event.

2.2.5 The contractor shall provide sixteen (16) hand-sanitizing stations. The units shall be free-standing, touch free, and complete with sanitizer. Each station shall be able to serve four persons simultaneously.

2.2 Estimated daily attendance for Saturday and Sunday, 21-22 September 2024 is 50,000 persons.

2.3 Locations and placement of the units shall be at the discretion of the COR. A map of unit locations shall be provided to the contractor no later than 72 hours before placement. Locations are subject to change at the discretion of the COR.

2.4 The following times are subject to change, coordinated by the CO or COR:

The airfield will be available for the placement of units beginning at 1000 hours (10:00 AM) on Friday, 20 September 2024. A pre-staging area to temporarily place units shall be available at 0800 hours (08:00 AM) as designated by the COR on Thursday, 19 September 2024.

2.5 The contractor shall have ten (10) standard, one (1) handicap, and one (1) handwashing unit in place designated by the COR by 1100 to support the preshow on Wednesday, 18 September 2024. These units will be cleaned and ready at the end of each day prior to the event starting.

2.6 The contractor shall have all units in place by 1800 (6:00 PM) on Friday, 20 September 2024.

2.7 The contractor shall, at minimum, service all units according to the schedule below.

For groups of standard latrine units, no more than half of the units may be inoperative for waste tank service at any time, up to 10 inoperative units, whichever comes first. For example, a group of 10 latrines must have no more than 5 units down for tank service, while a group of 30 can have up to 10 units down. CAFB personnel will be available to assist with crowd control and roping-off the closed units.

The contractor shall have all units removed from the flight line area prior to 2359 hours (11:59 PM) on Sunday, 22 September 2024. A staging area to temporarily place units (if needed) shall be available as designated by the COR. If used, all units must be clear of the staging area by 1600 hours (4:00 PM) on Monday 23 September 2024.

2.8 The units will be subjected to an airfield environment. The contractor shall ensure all units are functional in expected weather, e.g., resistant to tipping due to high airfield winds.

END OF SECTION

Compensation and Cancellation

Should the 2024 CAFB Open House be postponed, abandoned, canceled, or otherwise prevented from occurring due to conditions outside the control of either party, including, but not limited to, national or military emergency, disaster, terrorism, or an act of God/force majeure, pandemic and or epidemic neither party hereto shall be liable to the other for any expense incurred at the time of cancellation. If the Contractor has incurred costs at the time of cancellation, the Contractor shall be entitled to a compensation amount that is commensurate with the amount of work performed. The Contractor shall therefore provide substantiating documents to support costs incurred when invoicing.

2.9

File details come from the government source that posted it. Updated .