BASH_Amendment_29_August_2018.pdf

PDF 140 KB Posted

Attached to
BASH Cannon (Upgrade & Maintenance) Federal contract opportunity
Solicitation number
FA302218R0032
Issued by
Department of the Air Force Air Education and Training Command

About this file

BASH Amendment 29 August 2018 (Please note this document reflects "Amendment 0002". This is correct, as the original solicitation posting was "Amendment 0001", and a conformed copy of the solicitation was posted)

View the file

Other files for this federal contract opportunity

Other files attached to BASH Cannon (Upgrade & Maintenance), newest first.
File Type Posted
FA302218R0032_BASH_Cannon_Upg_&_Mx_(CAFB).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1N0A28155AW01-1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Update the Performance Work Statement (PWS, section 2. F.) to reflect a delivery date of 120 days ADC.

2. Update the CLIN 0001 description to reflect a delivery date of 120 days ADC.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA302218R0032

X 9B. DATED (SEE ITEM 11)

27-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Aug-2018

CODE

14 CONS/PKB--FA3022

495 HARPE BLVD, STE 280

COLUMBUS AFB MS 39710-1006

FA3022 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA302218R0032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule Item has been deleted from CLIN 0001:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 30-SEP-2018 TO

01-OCT-2019

N/A JOHN LINDELL

708 HARPE BLVD

COLUMBUS MS 39705

(662) 742-2519

FOB: Destination

F1N0AD

The following Delivery Schedule item has been added to CLIN 0001:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

120 dys. ADC 1 JOHN LINDELL

708 HARPE BLVD

COLUMBUS MS 39705

(662) 742-2519

FOB: Destination

F1N0AD

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

14TH FLYING TRAINING WING BASH CANNON REPLACEMENT

22 June 2018

1. SCOPE:

A. This PWS is for the upgrade of the current Scare Wars® bird deterrent system at

Columbus AFB in Columbus, MS (KCBM). It will also provide routine servicing and inspections of the system while under manufacturer’s warranty and full maintenance of the current bird deterrent system at Gunshy Auxiliary Airfield in

Shuqualak, MS (Gunshy). At Columbus, the current system consists of one central control console/computer with software, two handheld remote transmitters, 27 remote bird deterrent units, and six remote bird deterrent units with distress cry generators. At Gunshy, the current system consists of one central control console/computer with software, two handheld remotes/transmitters, eight remote bird deterrent units, and four remote bird deterrent units with distress cry generators. The upgraded system will be a full replacement of all existing equipment at Columbus AFB with new equipment.

B. The upgraded system will operate in a similar manner and be equivalent to the

Scare Wars® system. It will have an expected minimum service life of 10 years.

It will consist of three main components: central control console/computer with required hardware and software, handheld remote transmitter, and remote bird deterrent units (with and without distress cry generators).

I. Central Control Console/Computer with Required Hardware and

Software: Will be capable of remotely firing individual cannons, a group of cannons or all cannons via radio frequency transmitter and include all required hardware and components (antennas, wiring, and software). The unit will have a fuel gauge to determine estimated amount of remaining liquid propane gas in each Remote Bird Deterrent Unit. The unit will have triple redundancy to ensure reliable radio transmission. The unit will utilize the frequency used by the Scare Wars® system currently installed.

The system will have a minimum expected service life of 10+ years. The central control console/computer will be installed in the Air Traffic

Control Tower at Columbus AFB.

II. Handheld Remote Transmitter: Will be capable of controlling individual bird deterrent units or all bird deterrent units from any location on the airfield without restriction. The unit will utilize the frequency used by the

Scare Wars® system that is currently installed.

III. Remote Bird Deterrent Unit: Will be a self-contained unit capable of withstanding year-round exposure to the environment with an expected minimum service life of 10+ years. Each will be capable of receiving radio frequency transmissions, operate by battery that is recharged via solar panels, and be semi-portable. The units will include a base, liquid propane cannon, and, in some cases, a distress cry generator.

1. Base: Will house the battery, liquid propane tank, and serve as a mounting point for the solar panel, liquid propane cannon and distress cry generator.

2. LP Cannon: Will be capable of blasts reaching 130 dB, and capable of rotating 360 degrees. It will be completely electronic--no mechanical gears will be required to move the cannon.

3. Distress Cry Generator: Will include high-output amplifiers and outdoor speakers arranged to be capable of: broadcasting in a 360 degree circle; reaching 125dB; and a frequency range of 2,000 to

5,000 Hz. Additionally, it must be designed specifically for maximum effect on birds’ auditory senses. It will also be programmable with multiple sounds customized to deter local wildlife.

2. CONTRACTOR REQUIREMENTS:

A. The Contractor will remove and dispose of all old equipment from Columbus

AFB.

B. The Contractor will service all new equipment per the OEM service schedule.

C. The Contractor shall provide all personnel, equipment, parts, tools, materials, supervision, transportation, work/repair areas, and other items/services necessary to maintain all equipment at Columbus Air Force Base and Gunshy.

D. The Contractor will provide training for key personnel identified by the

Government by the end of the first month of each quarter on the proper use and safety features of the system.

E. The Contractor will be proficient in troubleshooting malfunctions and replacing defective parts on the equipment installed, including problems with the software.

This requirement includes both new equipment installed at KCBM and the existing equipment at Gunshy.

F. The Contractor will have the system installed and fully operational no later than

120 days after date of contract award.

3. GOVERNMENT REQUIREMENTS:

A. The Government will provide airfield familiarization training within 10 days of contract award or change in personnel to include directions on how to access to the equipment.

B. The Contracting Officer’s Representative will notify the contractor if equipment is known to be malfunctioning.

C. The Government shall provide all necessary training within 10 days of contract award or change in personnel for the Contractor’s representative to be able to drive on the flight line to access the units.

(End of Summary of Changes)