Atch_02a_PWS_-_Appendix_1_-_W&D_Requirement_by_Bldg_and_Type.pdf
PDF 594 KB Posted
- Attached to
- Washers and Dryers (W&D) Leasing, Cleaning, Maintenance, Repair, and Dryer Exhaust Vent Cleaning Services
- Solicitation number
- FA3020-17-R-0001
About this file
Attachment 02a PWS Appendix 1
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN - Base Building # Washers Gas Dryers
Electric Dryers
Stackable Dryers
# of Laundry Rooms
# of Dryer Transition
Ducts
Child Development 195 2 2 1 2
* Youth Center * 196 1 1 1 1
* Gyms * 384 1 1 1 2
* Solid Rock Café * 450 1 1 1 1 Dormitory 530 25 25 1 25
* Gyms * 540 1 1 1 1 Dormitory 602 40 39 4 78 Dormitory 622 40 39 4 78 Dormitory 776 92 20 48 6 116 Dormitory 790 25 25 1 25 Dormitory 862 44 39 4 78 Dormitory 882 41 39 4 78 South Fire Station 1093 2 1 (Electric) 1 2 Dormitory 1670 35 35 35 35
* EOD Training Site * 1704 2 1 2 *Fuels Training School * 1900 1 1 1 1
* North Fire Station * 2561 1 1 1 1
BASE Subtotal 352 74 40 206 68 526
CLIN - ENJJPT Building # Washers Gas Dryers
Electric Dryers
Stackable Dryers
# of Laundry Rooms
# of Dryer Transition
Ducts
ENJJPT 280 15 10 (Electric) 5 20 ENJJPT Subtotal 15 0 0 10 5 20
CLIN - RSAF Building # Washers Gas Dryers
Electric Dryers
Stackable Dryers
# of Laundry Rooms
# of Dryer Transition
Ducts
Royal Saudi Air Force 634 32 32 1 32 RSAF Subtotal 32 0 32 0 1 32
CLIN - Lodging Building # Washers Gas Dryers
Electric Dryers
Stackable Dryers
# of Laundry Rooms
# of Dryer Transition
Ducts
* Lodging –Sky Court * 101-123 18 18 18 18
* Lodging – 1 st Ave * 127-133 7 7 7 7 Lodging 162 4 4 1 4 Lodging 260 6 4 2 4 Lodging 370 9 6 3 6 Lodging 1600 30 35 1 35 Lodging 1659 32 32 1 32
LODGING Subtotal 106 74 32 0 33 106
APPENDIX 1 - WASHER/DRYER REQUIREMENT BY BUILDING AND TYPE
SUMMARY # of Bldgs Washers Gas
Dryers Electric Dryers
Stackable Gas Dryers
# of Laundry Rooms
# of Dryer Transition
Ducts
Base 18 352 74 40 206 68 526
ENJJPT 1 15 0 0 10 5 20
RSAF 1 32 0 32 0 1 32
Lodging 30 106 74 32 0 33 106
GRAND TOTAL 50 505 148 104 216 107 684
Dormitory (Future ) Bldg 596 fully loaded 92 20 48 116 Advance Pricing for FUTURE Appliance QTY not guaranteed 17 17 1 1 20
Potential Future Subtotal 614 185 105 265 107 820
* Multiple systems on base without known linear feet of perm vents
Note: "# of Dryer Transition Ducts" is how many the contractor will supply and connect to the permenant dryer exhaust to form a complete operational dryer exhaust system.
Note: * asterisked facilities above indicate those with only 2 appliances which have different response times and circumstances within the PWS.
APPENDIX 1 - WASHER/DRYER REQUIREMENT BY BUILDING AND TYPE
Appendix 1
File details come from the government source that posted it. Updated .