The document is a set of questions and answers for Solicitation FA301625Q0081 for Internet services at the JBSA Lackland Library. The Q&A addresses technical details about network infrastructure, including network drop locations, cabling requirements, and installation specifications. Key points include the contractor's responsibility to provide patch cables and equipment to extend the circuit from the Base Commercial Demarc (Building 5100) to Building 6114, with 40 network drops currently installed in the library's attic and attached to ceiling beams.

The solicitation requires the contractor to manage installation of wireless commercial internet services for the 18,000 sq. ft. library, including circuit testing, troubleshooting, and developing a Heat Map to determine wireless access point coverage. The current infrastructure utilizes CAT4 cabling, and the contractor is permitted to remove and replace existing network drops with new CAT6 or CAT6A cables. The operational date is set for May 31, 2025, with the 502 Communication Squadron Commercial Communication manager confirming the demarc is already identified, tested, and operational.

View the file

Other files for this federal contract opportunity

Other files attached to JBSA Lackland Library Internet Services, newest first.
File Type Posted
Questions for Solicitation FA301625Q0081.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Solicitation FA301625Q0081

Question: Will the government provide on base infrastructure from the NEC at 2141 Kelly Dr Bldg. 1050 to the demark in Bldgs. 6114 and 5100?

Answer: For the Internet service requirement in support of the JBSA Lackland Library, currently there is no NEC Bldg. 1050 patch involvement. The Statement of Work that is attached for Solicitation FA301625Q0081 requires the Contractor to provide all necessary patch cables and equipment to extend the circuit from the Base Commercial Demarc, Bldg 5100 to Bldg 6114.

This includes placing required wiring and any other equipment deemed necessary. This information can be referenced in paragraph 2. Description of Service.

Question: Can the location of the 40 required network drops be indicated on the included floor plan?

Answer: The current network drops are installed in the Library’s attic attached to ceiling beams and are fed into the communication room

Question: Are all 40 network drops currently serviced by the referenced Cat4 cabling? If not, can new network drops be differentiated from existing ones on the provided floor plan?

Answer: The customer has provided verbiage in the Statement of Work under paragraph 2.3.

Specification that the current set up utilizes CAT4 cable.

Question: If network drops are located on open floor space (not attached to a wall), is the cable serviced from the ceiling inside existing service poles or from floor boxes under a raised floor?

Answer: Current network drops are installed in the Library’s attic attached to ceiling beams and are fed into the communication room

Question: Does the fiber from base telecom come into Server Room 119 on the floorplan, if not can this room be identified on the floorplan?

Answer: Yes, Room 119 as identified on the CAD is the communication room

Question: If Cat4 cabling is utilized for existing network drops that are included in the 40 requested "Hard Lines", can the Cat4 be removed by the installer when installing new Cat6 or Cat6A replacement cable?

Answer: Yes, the installer is permitted to use current network drops and routers or install new wiring and equipment as long as it meets the specifications identified in in the Statement of Work under paragraph 2.3. Specification

Question: The SoW indicated the operational date of May 31st. Has base fiber from the demarc to 6114 already been identified, tested, and tagged. The process to request this from the Base Fiber Team can take up to a month to process which could impact that 5/31/2025 timeline.

Answer: For the current Internet and WiFi, the Demarc is identified, tested, tagged, by the 502 Communication Squadron Commercial Communication manager and it is operational