Questions for RFQ FA301622U257

1. Do you have a loading dock for offload? Yes, there is a loading dock for offload at Bldg 4196. A liftgate will be required for Bldg 5595.

2. Do you require assembly and install? No, assembly and install is not required. Only delivery.

3. (Item 0001) - Are 4 wheels okay? Yes

4. (Item 0003) - Is no center drawer okay? Yes

5. (Item 0003) - Is half modesty okay? Yes

6. (Item 0004) - Is no center drawer okay? Yes

7. (Item 0004) - Is half modesty okay? Yes

8. (Item 0007) - Constructed with panels to have metal painted front with laminate top, is this okay? Yes, as long as the metal frame (has perforated side panels) is painted brushed nickel and the laminate top is warm ash.

9. (Item 0008) - Is this a “U-Shaped” desk or a desk that can be reconfigured easily? No

10. (Item 0012) - Is it okay if this is 2 units stacked together to reach desired height? No

11. (Item 0013) - Is this cabinets or a lateral file for credenza? States “four drawer credenza” and also states “two lower cabinets with four shelves” It is a cabinet credenza with internal shelves

12. (Item 0015) - Is 64”H acceptable? No, a variance of up to 2 inches is acceptable

13. Is the project considered tax exempt? Or will the contractor be expected to pay sales tax on the furniture and materials? The project is not tax exempt.

14. Will the contractor be expected to warehouse the furniture until ready or ship directly to each facility? Ship directly to each facility.

15. What is the expected Period of Performance? 60 Days ARO (After Receipt of Order)

16. Will the contractor provide assembly and installation? The contractor will only have to provide delivery.

17. If contractor is expected to install, will the government ensure there are no obstructions between the point of unloading the furniture and final placement location? The contractor will only have to provide delivery.

18. Is there a loading dock or ramp at each facility? Yes, there is a loading dock for offload at Bldg 4196. A liftgate will be required for Bldg 5595.

19. What are work hours and work days for project. Weekdays, nights, weekends? The work (delivery hours) for this project are Monday-Friday 8:00am-4:00pm.

20. Will any design work regarding layout, power, network, be required for this project? Non applicable, installation is not required.