SPECIFICATIONS
FOR
Classroom Partition Replacements
Camp Bullis Bldg. 5425
JBSA-Lackland and Camp Bullis 20 May 2021
STATEMENT OF WORK
1 DESCRIPTION OF WORK
Work to be accomplished: the contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove two ceiling mounted folding partitions and install two new ceiling mounted hinged pairs operable wall systems. Two shall be installed in Bldg. 5425, 4301 Wilkerson, JBSA-Camp Bullis, San Antonio, TX 78257.
Specific requirements are as follows:
• Contractor shall conduct a site visit and ensure all measurements are correct prior to ordering materials.
• Camp Bullis Bldg. 5425 classroom paired panel partitions (2) shall be 38'-0" long X 9'- 10" tall (when collapsed it will open north from south wall).
o One partition shall be installed 23’ from west wall and second partition 23’ from east wall. Traversing from south wall to north wall.
o Shall have a Sound Transmission Class (STC) of 49 o Shall have steel face sheets o Shall have an aluminum track system mounted to the ceiling.
o Expandable panel closure o Pass through door (north end) Centered @ 72” from north wall when wall is extended.
o 1” mechanical retractable top seals o 1 ½” mechanical retractable bottom seals o Vinyl covering (beige) o The partitions shall be secured to the south wall and shall open towards the north wall.
• Contractor shall install two new ceiling mounted steel skin construction hinged pair operable wall systems.
• Track shall be anchored in the ceiling with toggle bolts/anchors. (no track on the floor)
• Contractor shall remove the existing folding wall partitions and ceiling mounted track systems (2). Two from Camp Bullis, Bldg. 5425.
• Contractor shall remove and place old partitions in warehouse bldg. 5423 for unit do dispose of.
• Contractor shall remove and dispose of all excess material/debris (off-property) at the end of each workday.
• Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire.
• Contractor shall provide all installation hardware required to install the track systems and panels.
• Contractor shall repair any ceiling tiles or ceiling aesthetics (sheetrock) removed or damaged during the removal and installation of the partition walls and tracks.
2 PRODUCT SPECIFICATIONS
The operable wall systems shall consist the following (or equivalent) specifications:
• The wall systems shall consist of Hinged Pair Panels 4” thick and supported by a carrier (track system).
• Panels shall be hinged together in evenly matched pairs. The panels shall be 48” wide and connected with one hinge in the middle (groups of two).
• The operable steel skin wall system shall consist of acoustically rated panels tested in accordance with American Society for Testing and Materials (ASTM) E 90 and ASTM E413 test procedures.
• The steel skin wall system shall consist of a minimum 22-gauge tension-leveled galvanneal steel, pressure laminated to a structural acoustical backer and to the steel frame to form a rigid, unitized, and structural panel.
• Vertical seals shall be dual aluminum and PVC tongue and groove interlocking seals in each panel edge.
• Horizontal seals shall be manually operated (top and bottom). Top and bottom seals extend and retract simultaneously with half a turn of a removable lever handle.
• Manufacturer shall provide beam punching template drawing detailing the anchor locations for the suspended track system.
• Pass through doors must meet American with Disabilities Act (ADA) standards. Doors shall provide a clear width of 32 inches and thresholds if used shall be ½ inch high maximum.
• Pass through door (north end) Centered @ 72” from north wall when wall is extended.
3 WORK HOURS AND SPECIAL CONDITIONS
Work hours shall be 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the option of the government and with approval of the Contracting Officer, work may be permitted on Federal holidays, weekends or after 4:30 p.m. daily at no additional cost to the government. The following legal holidays are observed:
New Year’s Day, January 1st Dr. Martin Luther King, Jr. Day, 3rd Monday in January Washington’s Day, 3rd Monday in February Memorial Day, Last Monday in May Independence Day, July 4th Labor Day, 1st Monday in September Columbus Day, 2nd Monday in October Veterans Day, November 11th Thanksgiving Day, 4th Thursday in November Christmas Day, December 25th
Note: When any of the above holidays falls on a Saturday, the preceding Friday shall be observed as the legal holiday; holidays falling on a Sunday shall be observed on the following Monday.
4 BASE FIRE REGULATIONS
The contractor shall comply with all Lackland AFB Post Fire Regulations. No welding shall be permitted without obtaining a welding permit issued by the Post Fire Department.
5 ENVIRONMENTAL REQUIREMENTS
Lead Based Paint (LBP): To the best of the government’s knowledge, no lead-based paint (LBP) shall be disturbed by this project.
6 SITE MAINTENANCE AND CLEANUP
Site Maintenance: The contractor shall maintain work areas in a neat, clean, and safe condition.
The contractor shall be responsible for providing, installing, and the removal of any temporary signage, barriers, barricade tape, etc. which may be required to control pedestrian and/or vehicle traffic in the work area.
Dust Control: The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the building or construction site and to avoid creation of a nuisance in the surrounding area.
Protection of Existing Property: Before beginning any demolition work, the Contractor shall carefully survey the site and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government, and any damaged items shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The Contractor shall carefully coordinate the work of this section with all other work and shall construct and maintain shoring, bracing and supports, as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. The interior of any project building and salvageable materials and equipment shall be protected from the weather at all times.
Cleanup: The contractor shall collect all trash, debris, refuse, garbage, etc., which is generated and place it in appropriate containers with lids or approved covers daily. The aforementioned materials shall be removed from the site by appropriate means daily, unless otherwise approved by the Contracting Officer. Disposal shall be outside the limits of government property.
7 ENERGY CONSERVATION
The contractor shall use good judgment in the conservation of government utilities. The contractor shall adhere to and enforce prevailing energy conservation practices.
8 SAFETY
The contractor shall comply with all applicable Air Force Occupational Health and Safety Standards, Regulations and Lackland AFB Policies. The contractor is also required to comply with the American General Contractors' Safety Manual and the Occupational Safety and Health Act.
9 INSPECTION OF INSTALLATION
The Contractor shall maintain an adequate inspection system and perform such inspections as shall ensure that the work performed under this contract conforms to contract requirements. The contractor shall maintain complete inspection records and make them available to the Contracting Officer or Mr. Henkelmann 671-3768 or Mr. Whitfield 671-6177.
Inspections and tests are for the sole benefit of the Government and do not-
• Relieve the Contractor of responsibility for providing adequate quality control measures.
• Relieve the Contractor of responsibility for damage to or loss of the material before acceptance.
• Constitute or imply acceptance; or
• Affect the continuing rights of the Government after acceptance of the completed work
The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
Failure to pass final inspection shall result in the Contractor promptly furnishing and without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Project Manager. The
The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
If the Contractor does not promptly replace or correct rejected work, the Government may
• by contract or otherwise, replace or correct the work and charge the cost to the Contractor
• Terminate for default the Contractor's right to proceed.
10 INSPECTIONS AND ACCEPTANCE
Final Inspection:
When all pre-final inspection discrepancies have been corrected, the Contracting Officer will conduct the final inspection with the aforementioned 37 TRSS personnel, the Contractor, and any needed subcontractor to determine whether the project can be finally accepted upon written notice from the Contractor that the punch list items are complete.
11 RECORDS MANAGEMENT
The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual (AFMAN) 33-363 and Air Force Instruction (AFI) 33-364 (or their subsequent replacements).