Attachment 1 SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_Wage_Determination.pdf | ||
| FA301618U0050_Runway_Friction_Test_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13 Nov 2017
STATEMENT OF WORK
FOR
AIRFIELD RUNWAY FRICTION TESTING AT
Seguin, Randolph West, Randolph East and Kelly Airfields at
Joint Base San Antonio, TX
INTRODUCTION. In performing airfield runway friction testing, the United States Air Force follows guidance as published by the Federal Aviation Authority (FAA) per FAA AC 150/5320-12C runway friction surveys should be conducted at a minimum of once per year. Friction surveys shall include an evaluation utilizing continuous friction measuring equipment (CFME). A complete survey should include test runs at both 40 miles per hour (mph) and 60 mph within ten feet on both sides of the centerline.
1.0 DESCRIPTION OF SERVICES. Unless otherwise stated, the Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to conduct airfield runway friction testing at Joint Base San Antonio Lackland, TX.
1.1 BASIC SERVICE. The Contractor shall perform 12 total runway friction tests per year (one per month from January 2018 to December 2018) as required on Kelly airfield runway 16/34. The
Contractor shall perform 4 total runway friction tests per year (once every 3 months starting in
January 2018 to December 2018) as required on Randolph airfield runway 15R/33L and 15L/33R.
The Contractor shall perform 2 total runway friction tests per year (once every 6 months starting in
January 2018 to December 2018) as required on Seguin airfield runway 13/31. Tests should be conducted at least 27 days but no more than 34 days apart. The friction testing shall be accomplished by a self-wetting CFME as delineated in accordance with AFI 32-1041 and FAA AC 150/5320-12C.
Friction testing is performed along the entire length of the runways. Test runs shall be completed at both 40 mph and 60 mph in each direction within ten feet of the runway centerline. Friction testing is anticipated to be scheduled monthly for the runway but depends on the actual amount of aircraft landings and types of aircraft. The Contractor shall also perform a rubber deposit survey and assign a classification for every 500 feet of longitudinal runway pavement in accordance with Figure 5.1 in
AFI 32-1041. The Contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. The Contractor shall provide comprehensive report(s) of the friction testing result(s) within seven (7) calendar days. At a minimum, the report(s) shall include:
1.1.1 Coversheet with Name of the company providing the test, date of the report, location, company contact information (person name, address, website, e-mail, phone number)
1.1.2 State in compliance with … list the regulations this testing meets. Certification of calibration
1.1.3 Training certification
1.1.4 Equipment list of CMFA devise verifying it is listed on the FAA approved CFME Devices
1.1.5 Procedure
1.1.6 Weather and surface conditions (wet, dry, weather related safety NOTAM was posted…)
1.1.7 Date of last rubber removal
1.1.8 Friction testing test results: Average mu values for every 500 feet, Graphical representations of the mu values along the entire length of the runway(s) with an explanation of what the values represent
1.1.9 Additional testing test results
1.1.10 Surface type and condition (groove deterioration, surface deterioration, damaged patches, non-weather safety NOTAM was posted…)
1.1.11 Repair/maintenance recommendations based on guidance contained in FAA AC 150/5320-12C.
Rubber Removal recommended frequency.
1.2 ADDITIONAL TESTING: Additional testing (slope measurements, Texture measurements) should be accomplished once per year per runway (4 runways) in compliance with IAW AFI 32-104 and results included in the comprehensive report(s) as described in paragraph 1.1
1.2.1 Additional testing shall include slope and texture measurements. Slope measurements shall be made in both the transverse and longitudinal direction for every 500 feet. Transverse slope measurements shall be taken at approximately five (5) and fifteen (15) feet from the centerline on both sides of the centerline, and the longitudinal measurements taken on the centerline. Slopes shall be measured with a 10-foot level and recorded to the nearest 0.1 percent. Texture measurements shall be conducted at least three times for every pavement surface type (e.g.
grooved asphalt, un-grooved Portland cement concrete, etc.) with an outflow meter in accordance with ASTM E2380/E2380M – 15. Additionally, hydroplaning potential shall be reported in accordance with the following table based on the mean average of the three outflow measurements for every section tested:
Dynamic Hydroplaning Potential Low Low-Medium Medium Medium-High High
Outlfow Meter Time (sec.) < 2 2 to 5 5 to 20 20 to 80 > 80
1.3 UNAVOIDABLE DELAYS. The Government shall make every attempt to schedule the airfield friction testing as a one day event with all concerned parties. In the event that friction testing may carry over into an additional day, the Contractor shall be required to remain in the local area until field testing is complete. Time constraints or unusual conditions such as unexpected mission requirements, unforeseen heavy rubber removal workload, rubber removal equipment failure, unexpected weather condition, etc.
shall be valid reasons for an extended stay. Lackland’s Kelly Airfield is open 24 hours per day 7 days per week and will remain open for all testing. There is a reduction in traffic between (0001) 12:01 am and
(0400) 4:00 am if a hard closure is required. Do not attempt friction testing during Barrier testing typically from (0600) 6:00 am to (0800) 8:00 am.
1.4 CONTRACTOR NOTIFICATION / RESPONSE. Friction testing is anticipated to be scheduled monthly for the runway but depends on the amount of aircraft landings and types of aircraft. The
Contractor shall be given a thirty (30) day notice prior for the required airfield friction test event. The
Contractor shall report for the airfield runway friction testing upon the agreed to date and time with no exceptions.
2.0 SERVICE SUMMARY. The corresponding “Performance Threshold” briefly describes the minimum acceptable levels of service required for each objective--these thresholds are critical to success.
The listed “Performance Thresholds” are the Government’s acceptable tolerances of Contractor performance and represent the limits of “acceptable work”. Any Contractor performance that does not meet or exceed these thresholds shall be considered “unacceptable work”. Any unacceptable work performed by the Contractor must be corrected by the Contractor within specified timeframes set forth in the statement of work. Re-performance is the preferred method of correcting “unacceptable work”.
Performance Objective Performance Threshold
Conduct Airfield Runway Friction Testing.
Contractor shall use the proper continuous friction measuring equipment (CFME) and techniques in
Friction testing is conducted in accordance with FAA AC 150/5320-12C one hundred
(100%) percent of the time.
accordance with FAA AC 150/5320-12C
Contractor shall conduct a minimum of two (2) runs at 40 mph and 60 mph each for a total of four
(4) friction runs
Each friction test run shall be within +/- 3 mph for each specified speed and in accordance with FAA AC 150/5320-12C
Contractor Notification / Response. On-site and ready to conduct friction testing on the agreed date and time.
Contractor shall be on site one hundred percent (100%) of the time during testing.
Reports / Documentation. Provides accurate reports and documentation in accordance with
FAA AC 150/5320-12C and contract requirements.
All reports are completed and delivered to the
Government within seven (7) calendar days
2.1 DELIVERABLES. Submit deliverables as follows:
2.1.1 Back flow preventer certification – prior to offical test being performed
2.1.2 Back flow preventer testing after attachment – prior to official test being performed
2.1.3 Equipment certification – prior to any work being performed
2.1.4 Qualified tester certification – prior to any work being performed
2.1.5 Monthly friction test report – 7-days after conclusion of test
2.1.6 Annual additional testing report- as needed, 7-days after conclusion of final test
3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES. All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR. The contractor shall coordinate with Civil Engineering (CE) to utilize fire hydrants on the airfield prior to testing. See paragraph 4.1.2 of the UFGS 01 35 35 Environmental
Protection specification attached for fire hydrant hookups.
3.1 POLICE PROTECTION. Base Security Forces shall provide security and law enforcement response and services to the contractor. The non-emergency Security Forces Control Center can be reached at phone number (210) 671-2018. The emergency Security Forces Control Center can be reached at 911.
3.2 FIRE PROTECTION. Base Fire Department shall provide initial response and fire protection services to the Contractor. The Base Fire Alarm Control Center can be reached at phone number 911.
3.3 FLIGHTLINE DRIVING REQUIREMENTS: Contractor shall comply with all local airfield management procedures to be able to drive contractor vehicles on the airfield. Training/orientation will be required before scheduling of any proposed friction testing dates. Contract the project manager for details. All flight line drivers must have proof of color vision in the form of a note from an optometrist.
This license does not give the person permission to enter the airfield. See Security Requirements / Vehicle and Passes section for more information.
3.4 HOURS OF OPERATION. The normal hours of operation for the Contractor to perform are 7:00
AM to 4:00 PM, Monday through Friday. The Government shall strive to maintain these normal hours for the airfield runway friction testing but may be required at times to work on Saturdays and Sundays and after normal hours during the weekdays. The COR or CO must approve in advance any exceptions to the negotiated work hours and designated workdays. The contractor shall submit their request to COR and CO no later than two (2) working days in advance of the requested change(s).
3.5 CONTRACTOR PERSONNEL. The Contractor and their employees shall comply with all base regulations at all times and shall conduct themselves in a professional manner. The contractor shall provide a complete and current employee roster to the COR and CO within ten (10) working days of the contract award. The Contractor’s employee roster shall identify the primary and alternate site manager or foreman and the Quality Control inspector and their telephone numbers. As required, the Contractor shall provide updated copies of their employee roster to the COR and CO.
3.6 SAFETY AND ACCIDENT REPORTING. The Contractor shall be responsible for providing maintenance and repair services under this contract IAW all base, local, state, and Federal occupational safety requirements. The Contractor shall ensure that all maintenance and repair services are conducted safely at all times. The Contractor shall ensure that all Contractor employees are issued and properly use all required safety personal protective equipment. The Contractor shall use mechanically sound and safe vehicles and equipment in the performance of services under this contract. The Contractors shall take necessary corrective actions if the Contractor’s employees are conducting operations in an unsafe manner.
In the event of an accident, the Contractor shall contact the base emergency 911 service and the COR immediately. Additionally, the Contractor and Contractor’s personnel will be knowledgeable of and comply with all other base incident-reporting procedures.
3.7 HIRING GOVERNMENT PERSONNEL. The Contractor is restricted from hiring the COR, inspectors, monitors or any other Government employees whose employment could result in conflict of interests in accordance with DOD 5500.7R
3.8 SECURITY REQUIREMENTS / VEHICLES AND PASSES: After award of contract, the
Contractor shall request through the COR, CO, and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the local base policies. No less than 2 weeks prior to start of work contractor shall provide the formal name as written on their driver’s license, the driver’s license number, the driver’s license state issued, the employee’s date of birth of each person who needs access to the airfield. This information will be provided to security forces for an extensive background check. If the person passes the background check they will be placed on the
Entry Authorization List (EAL) and given access to the airfield. This does not give the person permission to drive on the airfield or to enter a restricted area or a controlled area. See the flight line driving requirements section for more information.
3.9 ENVIRONMENTAL COMPLIANCE. The Contractor is required to comply with all applicable base, local, state, and Federal environmental laws and regulations, including Air Force Instructions, in effect at the time of performance of this contract. The Contractor shall be responsible and liable for penalties, fines, or environmental damage claims that may be required or assessed by the local, state, or
Federal governments as a result of the Contractor’s performance, or failure to perform, during the course of this contract. The Government will inspect for environmental compliance at their discretion, and will notify the CO of any discrepancies found. In addition, the Contractor may be subject to contractual sanctions including, but not limited to, termination, suspension, debarment, and adverse past performance assessment.
3.10 NOTIFICATION OF ENVIRONMENTAL SPILLS. In the event that the Contractor spills or releases any un-permitted substance, hazardous substance, or hazardous waste into the environment, the
Contractor shall immediately report the incident to the Fire Department, the COR, and the CO. The
Contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment.
INSURANCE REQUIREMENTS
(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.
(b) General liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.
Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.